The consequent changes in local discharges from the site, to No2 Pearsons Road, are collated from Tables 7, 9 and 10 and summarised in Table 11, below. The changes are seen to be non-adverse, from Q1 to Q100. Table 11: Changes To Local Stormwater Discharges (m3/sec) From Site To No 2 Pearsons Road Scenario Q1 Q2 Q5 Q10 Q20 Q50 Q100 Pre-Development 0.25 0.30 0.45 0.56 0.66 0.85 0.97 Post-Development 0.003 0.004 0.006 0.14 0.27 0.48 0.63 Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 11