Original source · versioned page text
BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
Table 12: Impervious Fractions Assigned To Urbs Model Subareas Pre-Development Scenario Post-Development Scenario Subarea Impervious Subarea Impervious (Figure 1) Fraction (Figure 2) Fraction 1 0.10 1 0.10 2 0.15 2 0.15 3 0.15 3 0.15 4 0.35 4 0.35 5 0.15 5 0.15 6 0.50 6 0.50 7 0.20 7 0.30 8 0.06 8 0.60 9 0.10 9 0.00 10 0.30 10 0.60 11 0.30 11 0.50 12 0.58 12 0.50 13 0.65 13 0.50 14 0.28 14 0.50 15 0.45 15 0.50 16 0.45 16 0.50 17 0.00 17 0.50 18 0.04 18 0.50 19 0.08 19 0.60 20 0.31 20 0.00 21 0.35 21/22 0.30 22 0.25 23 0.37 23 0.45 24 0.58 25 0.65 26 0.28 27 0.45 28 0.45 29/39 0.15 30/40 0.15 31/41 0.50 32/42 0.50 33/43 0.55 34 0.55 35 0.55 36 0.45 37 0.08 38 0.60 44 0.39 45 0.35 46 0.25 47 0.45 Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.