BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
9.0 FLOOD PROFILES, POST-DEVELOPMENT
9.1 Mitigation Concept For Increased Stormwater Runoff
The impact of the increased site runoff on flood profiles along the floodways is proposed to be mitigated
mostly by increasing the floodway storage on the site, and partly by conventional detention storage in
two of the proposed bio-basins. The increase in the floodway storage will be achieved by deliberately
roughening the floodways (by revegetating the riparian zones, as required by Council), by excavating a
side-storage alongside the western tributary, and by constructing a restrictive footbridge across the
eastern tributary to back-up the flood profiles in that tributary floodway.
A small additional amount of storage is also required to offset the minor intrusions of the development
platform into the pre-development 100 year flood boundary, and for some minor regrading of an artificial
hump in the existing low-flow channel around node 5 of the Extran model (as seen on Figure 10).
The full suite of the proposed modifications to the flood storage system is shown on Figure 9, with
additional detail on Figures 10 to 12.
The revegetation of the riparian zones, by planting of shrubs (typically, Lomandra sp) and trees at
densities of one item per 1.5 to 2 square metres, is presumed to increase the Manning’s n of the presently
grassed areas from 0.03/0.05 to 0.07.
The detention storages in the bio-basins are accounted as only the “live” storages, in the narrow range of
elevation between the riser overflow level and the weir level. The overflow level in the riser will be
controlled by an overflow slot in one side of the riser, with details as in Figure 12.
9.2 Model Simulation
An Extran model of the post-development scenario was compiled by adjusting a copy of the pre-
development model so as to include the reshaped and revegetated floodways and associated increases in
Manning’s n values, together with the inclusion of the proposed footbridge (with zero blockage), the
minor regrading of the invert around Node 5, and hypothetical vertical walls at the boundaries of the
proposed allotments.
The achievement of the required increase in floodplain volume, to offset the development’s stormwater
detention requirement, is summarised in Table 22, below:
Table 22: Comparison Of Pre-Development And Post-Development Floodplain Volumes (m3)
To Required Detention Volumes
1Year 2 Year 5 Year 10 Year 20 Year 50 year 100 Year
Pre-Development 5536 6311 8787 10202 11576 13125 14483
Floodway Storage
Post-Development 5909 6775 9607 11697 13389 15383 16849
Floodway Storage
Floodway Gain 373 464 820 1495 1813 2258 2366
Plus Bio-Basins 162 183 252 252 252 252 252
Less Park, Bund Fill -0 -0 -0 -0 -5 -40 -72
Nett Gain 535 647 1072 1747 2060 2470 2546
Req’d Extra Volume
(From Table 6) 395 525 770 910 1095 1370 1585
Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.