Skip to the record
Every meeting, every word.

Original source · versioned page text

BsmRevRpt2

Attached to the e-mail REC13/0146 - Response to 2nd Information request.

of 48

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Table 24: 100 Year Flood Levels (m) With High Manning’s n And Footbridge Blockage
(50% blockage of bridge opening and 100% blockage of handrail)

 

 

 

XPStorm Node High Manning’s N High Manning’s N
+ Bridge Blockage
3 101.78 101.79
4 101.68 101.68
5 101.20 101.22
6 101.18 101.20
7 101.15 101.18
8 101.05 101.10
9 101.04 101.08
10 101.04 101.08
11 100.97 101.02
11.3 100.93 100.99
(Bridge) (Bridge) (Bridge)
11.4 100.88
12 100.82
13 100.56
14 100.44
1S 100.17
23 101.53
24 101.27
25 101.00
26 100.83
27 100.71
28 100.51
29 100.32
29.5 100.23
3 100.01

 

 

 

 

 

10.0 CERTIFICATION
I hereby certify that the findings described in this report have been deduced by industry-standard

analytical procedures and that the Noosa Council can rely on those findings in their considerations of the
relevant development application.

She AEDES oo yancie 72s 2s Seine dea serene eee Denis Ogle, RPEQ 2405, 15 September 2014

 

Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 23
Log in to download the original file

BsmRevRpt2.pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.