Original source · versioned page text
BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
Table 24: 100 Year Flood Levels (m) With High Manning’s n And Footbridge Blockage (50% blockage of bridge opening and 100% blockage of handrail) XPStorm Node High Manning’s N High Manning’s N + Bridge Blockage 3 101.78 101.79 4 101.68 101.68 5 101.20 101.22 6 101.18 101.20 7 101.15 101.18 8 101.05 101.10 9 101.04 101.08 10 101.04 101.08 11 100.97 101.02 11.3 100.93 100.99 (Bridge) (Bridge) (Bridge) 11.4 100.88 12 100.82 13 100.56 14 100.44 1S 100.17 23 101.53 24 101.27 25 101.00 26 100.83 27 100.71 28 100.51 29 100.32 29.5 100.23 3 100.01 10.0 CERTIFICATION I hereby certify that the findings described in this report have been deduced by industry-standard analytical procedures and that the Noosa Council can rely on those findings in their considerations of the relevant development application. She AEDES oo yancie 72s 2s Seine dea serene eee Denis Ogle, RPEQ 2405, 15 September 2014 Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.