Original source · versioned page text
BsmRevRpt2
Attached to the e-mail REC13/0146 - Response to 2nd Information request.
Subarea 36 QUDM std inlet time for 8% grade = 10 mins 70 m wq-swale & pipes @ 1% = 2 mins Total : = 12 mins Subarea 37 As per “Pre-Development” : 16 mins Subarea 38 QUDM std inlet time for 1.5% grade = 15 mins 5-10 m pipe = 0 mins Total: = 15 mins Q=0.00278 x FxCxIx A (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20) Subs Fi C10 Tc I (mm/hr) A Q (m3/s) (min) 1/2/ 5 / 10 / 20 /50 / 100 | (Ha) 1/ 2/5/10 / 20/50 / 100 0.30 | 0.76 16 80/90/ 120/140 / 158/ 183/202 | 2.25 | 0.30/ 0.36/ 0.54 / 0.67 / 0.79 / 1.00/ 1.15 0.60 | 0.82 10 97/109 / 147/171 / 194/224/245 | 0.29 | 0.05/0.06/ 0.09 / 0.11 / 0.13 / 0.17 /0.19 9 0.00 | 0.70 5 121/137 /185 / 216 / 247 / 288 / 318 | 0.72 | 0.14/0.16/ 0.25 / 0.30 / 0.36 / 0.46 / 0.53 10-18 | 0.50 | 0.80 14 84/96 / 128 / - / - / -/ - | 1.35 | 0.20/0.24/0.37/ ----/ --- -- | ---- 19 0.60 | 0.82 11 94/106 /143 / 166 / 189 / 218/238 | 0.37 | 0.06/0.08 / 0.11 /0.14/0.17/0.21 /0.24 20 0.00 | 0.70 5 121/137 / 185 / 216 / 247 / 288/318 | 0.99 | 0.20/0.22 / 0.34 / 0.42 / 0.50 / 0.64 /0.74 29-35 | 0.46 0.79 20 71/80/106/ --- / --- / --- /--- | 3.09 | 0.39/0.46/0.68/ --- / --- / --- /--- 36 0.45 0.79 12 92 /103 /138/ 160 / 183/211 /231 | 1.32 | 0.21/0.25/0.38/0.48 / 0.56 /0.70/0.80 37 0.08 0.72 16 80/90/ 120/140 / 158/ 183/202 | 0.84 | 0.11/0.13 /0.19 /0.24/ 0.28 / 0.35 /0.41 38 0.60 | 0.82 15 82/92 /124/ 144/ 164/ 188/206 | 0.40 | 0.06/0.07 / 0.11 / 0.13 / 0.16 / 0.20 / 0.23 oo; Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc Page 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.