telecommunication services- Zone and where not in a Bushfire Hazard Area
a) meets the needs of users; as defined on Overlay Maps OM1.4-0M9.4;
b) ensures health, safety and convenience of b) new low voltage lines can be strung from
the community; poles carrying existing high voltage lines; or
c) protects the natural environmental values of c) no extensions to the existing reticulation
the site and surrounds, including visual amenity network is necessary; or
and native vegetation; d) it is necessary to cross a body of water;
d) are cost effective over their life cycle; AND
e) minimlses adverse impacts to the 516.3 Street lighting is provided in accordance
environment (including the amenity of the local with Section 3.19 of PSPS Engineering Design
area) in the short and long term; and Standards -
Roads, Drainage and Earthworks;
f) ensures that the existing systems are AND
upgraded or relocated to be capable of 516.4 For lots not within a sewerage service
supporting the proposed development; area-the lot has sufficient area and other
AND attributes to ensure sustainable on-site
017 Essential public utilities are available and sewerage disposal;
maintain their function during flood events up to Advisory note
a 1% AEP (1:100 year ARI) flood event. PSP24 Effluent Disposal details requirements
-
for the design and siting of effluent disposal
systems where located outside a sewerage
service area. Compliance with PSP24 will be
considered as part of Council’s assessment of
the plumbing and drainage application.
517.1 Components of the infrastructure that
are likely to fail or may result in contamination
are-
a) located above the level of a 1% AEP (1:100
year ARI) flood event; or
b) designed and constructed to exclude water
inundation or infiltration and resist hydrostatic
and hydrodynamic forces as a result of
inundation.
Electricity supply infrastructure 518.1 Building footprints are situated clear of Not applicable.
018 Uses and works maintain a safe distance any power easements on-site;
from electrical infrastructure including AND
substations, overhead power lines, power poles 518.2 Building footprints are not less than SOm
and transformers. from an existing fenced electricity substation.
14.190 Earthworks and stormwater management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.