Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
This plumbing application meet the requiremen ; sion he Queensland VEVeroPr” ; a and Noosa Council s Planning Scheme Policies. BACKFLOW PREVENTION DEVICES ON WATER SERVICES ADE TA pris TO-COMP LY WITH REQUIREMENTS OF THE STANDARD PLUMBING AND DRAINAGE REGULATION 2003 Designed by: WAYNE GARRETT Date: 21 June 2007 Pipe key Netafim UNIBIOLINE 1.60 [email protected] —— Collect Manif - 25mm LDPE Pipe - 32mm LDPE Pipe — 50mm RURAL 'B' (2") —— 63mm HDPE Class 12.5 (PE 80) Sprinkler / Valve key “ HUNTER ICV 40mm SOLENOID VALVE ® Water Supply PLUMBING PERMIT NOx2@QQZP. Ge2..Z. SANITARY DRAINAGE / PLUMBING AND WATER SERVICE ASSESSE a NOOSA COUNCIL PLUMBIN ODP ui Lutaked ee DATE OFFICER Scale: 1: 600 File: NTH SHORE HOLIDAY |OMES2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 25 pages
Page 2
(wh
* ra
|
cy Cardno
Engineering the Future
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1
REPORT
NOOSA NORTH SHORE ECO-TOURISM PORTAL
Petrac Leisure NNS-S Pty Ltd
Ee ati we,
Pete, S44l356 —-
Cardno (Qld) Pty Ltd
ABN 57 051 074 992
Level 1, 5 Gardner Close, Milton QLD 4064
PO Box 388, Toowong QLD 4066 Australia
17 July 2006 Telephone: 07 3369 9822
Job No. 7296/08 Facsimile: 07 3369 9722
International: +61 73369 9822
Page 3
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL cS» Cardno Cardno (Qld) Pty Ltd ABN 57 051 074 992 5 Gardner Close Milton Q 4064 PO Box 388 Toowong Queensland 4066 Australia Telephone: 07 3369 9822 Facsimile: 07 3369 9722 International: +61 7 3369 9822 Email: [email protected] Web: www.cardno.com.au Document Control Author Reviewer Version Date Name Initials Name Initials 1 9 November 2005 L. Clough LC C. Sutcliffe cs 2 17 July 2008 L. Clough Wy C. Sutcliffe AS "© 2006 Cardno (Qld) Pty Ltd All Rights Reserved. Copyright in the whole and every part of this document belongs to Cardno (Qld) Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or in part in any manner or form or in or on any media to any person without the prior written consent of Cardno (Qld) Pty Ltd.” Petrac Leisure NNS-S Pty Ltd 1:\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Version 2 17 July 2006 Pagei
Page 4
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 4 NOOSA NORTH SHORE ECO-TOURISM PORTAL Cc Cardno EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL TABLE OF CONTENTS 4, INTRODUCTION isscssvisissiccsauansncconsscnessaaseasipnesesanansosianianssavanneaanvennieanansnonnnayiasennenananmn animes 1 2 (PROPOSED'SEWAGE TREATMENT PLANT wiisissiiiriasiscseserennesviaccinoweacaraaressmeoneasean 2 2.1 De@SIQN FIOWS 00... einer ener etre seis eiesnesitnieenesneeieniesnesietireniessesneserenienennee 2 2.2 STP Design and Operation ......cccecceccceteeeecieeeiecieneceenecieeecseecneciesneseeneecaes 2 3. (PROPOSED TREATED EFFLUENT IRRIGATION .ccsccssscseccssssscsccsusrcveensnsvisinsiesssiessiness 4 3.1 Infigation Areas Des n inawenmsmmanvevememmncnennnn oN 4 3.2. Irrigation Scheduling 3.3 Groundwater and Surface Water Quality 0.0... cceseseseseesseeseeseeseeseseneeneseeeeeeseeereees 5 4. EFFLUENT IRRIGATION MANAGEMENT PLAN. ........cccscsssssessesseseeseeseesessnsesseneeseneesesees 6 134 TSriNGiOgy cco mercom nce ENEIRINN 6 4.2 EIMP Structure..... 4.3 Relevant Legislation........... 4.4 Program and Contractual Obligations... 4.5 Non-Compliance and Corrective Action Requirements .. 4.6 Element 1: Effluent Storage LagoOn.........cccceeeeenes vn 9 4.7 Element 2: Effluent Irrigation System Infrastructure a 11 4.8 Element 3: Effluent Irrigation Areas ........ceeeee .13 4.9 Element 4: Contingency ManagemMent.........ccceceeeeeeieeeeieeneseeeeeee LIST OF TABLES Table 1: Design Flows te STP smecusnvanrenuevreesmmmanverurcemmnnnnuneuamrnmmennen 2 Table 2: Clearstream: SBMBR' Effluent Qualllty csicvcssscinvssessensensnrconvorercavisvengercessreees 3 LIST OF FIGURES Figure 1 Proposed STP, Wet Weather Storage and Irrigation Areas Figure 2 Monitoring Locations Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page ii
Page 5
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno 1. INTRODUCTION Petrac proposes to construct and operate the Noosa North Shore Eco-Tourism Portal within Lot 7 on RP 844337 (the site), which is located on Maximillian Road to the south of Beach Road in the Parish of Laguna, County of March. It is proposed to treat wastewater from the site with an on-site tertiary sewage treatment plant (STP) and to dispose of the effluent by land irrigation. The STP will treat wastewater to Class A+ standards and will have a peak design capacity of 483 equivalent persons (EP). This STP will initially be constructed to treat flows from Stage 1 only (112 EP). This Effluent Irrigation Management Plan (EIMP) has been prepared to ensure appropriate management of potential impacts that may occur as a result of the operation of the proposed sewage treatment plant (STP) to treat wastewater generated from Stage 1 of the development in accordance with the Noosa North Shore Eco- Tourism Portal Development Code and the Conditions of the Negotiated Decision Notice dated 16 December 2004. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 1
Page 6
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 ) NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno 2: PROPOSED SEWAGE TREATMENT PLANT 2:1 Design Flows The predicted volume of wastewater requiring treatment for Stages 1 to 4 of the proposed development at full occupancy has been estimated as 67.6 kL/day. This is based on a total EP of 483 following completion of Stage 4 of the proposed development and a rate of 140L/EP/day. The STP will initially be constructed to provide treatment facilities and disposal by irrigation for the wastewater generated from Stage 1 of the development. This will comprise a design loading of 15.6kL/day. A second module will be added to the STP at an appropriate time to treat wastewater generated from Stages 2 to 4 of the development. Table 1 below shows the design occupancy rates and wastewater flow rates for the two phases of the STP construction. Table 1: Design Flows to STP Development Stage Equivalent STP Design Persons (EP) | Loading (kL/day) Stage 1 112 15.6 Stages 2 to 4 371 52.0 Total 483 67.6 2.2 STP Design and Operation The STP proposed for installation at the site is a membrane bioreactor with submerged ultra-filtration membrane (Clearstream SBMBR). The filtration membranes remove microorganisms and most suspended solids from wastewater to produce a high quality effluent suitable for use as low grade process water or for irrigation purposes. Nitrogen removal is achieved through nitrification and denitrification processes. Phosphorous removal from wastewater is achieved by two processes: (a) chemical precipitation and removal by solids separation and; (b) enhanced biological phosphorous removal through uptake by microorganisms and biosolid removal, processing and disposal or reuse. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 2
Page 7
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 « > Cardno NOOSA NORTH SHORE ECO-TOURISM PORTAL The Clearstream SBMBR produces effluent of Class A+ standard. The quality of treated effluent produced by the system is given in Table 2 below. Table 2: Clearstream SBMBR Effluent Quality Parameter Quality Biochemical Oxygen Demand < 10mg/L Suspended Solids < 10mg/L Faecal coliforms (E. Coli) < 10 cfu/100mI Total Nitrogen < S5mg/L Total Phosphorous < img/L Turbidity <2NTU Management measures for operation and maintenance of the STP are outlined in the Sewage Treatment Site-Based Management Plan (SBMP) prepared for Stage 1 of the development. This SBMP provides details of effluent quality monitoring and performance criteria. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 3
Page 8
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 } » NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno 3. PROPOSED TREATED EFFLUENT IRRIGATION It is proposed to reuse treated sewage effluent from the STP for landscape irrigation. The location of the proposed irrigation area is indicated on Figure 1. The STP will provide tertiary treatment with removal of microorganisms, suspended solids and nutrients including nitrogen and phosphorous. Final effluent released from the STP will be of a high quality with treatment to a Class A+ standard. Treated effluent use will be carried out in accordance with the requirements of the National Water Quality Management Strategy Guidelines for Sewerage Systems Use of Reclaimed Water. The irrigation area will be vegetated with turf or pasture grass. Irrigation of the area will be by sub-surface drip irrigation system. A diversion bank is proposed along the western margin of the irrigation area to direct external runoff away from the irrigation area towards the existing dam on the property to the north. 3.1 Irrigation Areas Design MEDLI modelling was used to determine an acceptable combination of irrigation area and wet weather storage size for effluent quantities generated from the STP. Various combinations of irrigation scheduling, irrigation area, plant type and wet weather storage volumes were trialled to determine a suitable combination that would result in minimal overflows from the wet weather storage, acceptably low N and P levels in the deep drainage, and no build up of phosphates or salinity in the soil or groundwater. The expected effluent irrigation rate for the south site has been calculated as 47.1 kLiday (420EP x 112 L/EP/day), or 17.2 ML/year. These figures were adopted for the purposes of MEDLI modelling. The EP figure of 420 is based on an average occupancy rate of between 80% and 90% and is reduced from the EP of 482 at full occupancy of the south site. The per capita wastewater generation rate is reduced from 140L/EP/day to 112L/EP/day to account for the quantity that will be recycled for toilet flushing. The application rate for treated effluent to irrigation areas was calculated as approximately 5 ML/ha/year requiring a disposal area of 3.8 hectares. The required wet weather storage capacity was determined to be 3ML providing 60 days storage. For Stage 1 the predicted EP of 112 will require a disposal area of 1 hectare, which will be constructed as part of the Stage 1 operational works. The wet weather storage required is approximately 940kL, however, it is proposed to construct the storage lagoon for the full development during Stage 1. The storage lagoon will be a minimum of 4.6ML capacity. The requirements for the size of irrigation areas will be confirmed at each stage of development after monitoring of the receiving environment to demonstrate that no environmental impacts arising from operation of the STP and effluent irrigation system has occurred. 3.2 Irrigation Scheduling Irrigation will be restricted to a maximum of 4 mm per day. The moisture content of the irrigation area will be determined prior to irrigation taking place. It is proposed that moisture-sensing probes will be installed throughout the irrigation area. Readings from these will indicate the degree of saturation of the soil and whether irrigation can take place. Should ponding occur, irrigation will cease until such time as the soil moisture content has sufficiently reduced to eliminate further ponding. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 4
Page 9
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 ) NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno It is proposed to irrigate the areas only during non-rainfall days, with irrigation only sufficient to wet the soil to its undrained upper limit. Automatic irrigation scheduling equipment with soil-moisture probes and rain sensors will be necessary for control of the irrigation. Irrigation will only re-commence a minimum of 4 hours following cessation of rainfall. 3.3 Groundwater and Surface Water Quality During effluent treatment and disposal, monitoring of groundwater quality will be undertaken annually as specified by the conditions of the preliminary development approval. Quarterly baseline monitoring of groundwater quality has been underway since December 2004 to determine current groundwater conditions. In accordance with the conditions of the development approval, quarterly baseline monitoring of receiving waters including groundwater and surface waters will be conducted for a minimum of 12 months prior to commencement of construction works for the proposed development and will continue during construction and for 2 years after completion of construction works. Groundwater monitoring will include analysis of pH, Electrical conductivity, Total dissolved solids, Biochemical Oxygen Demand, Sodium, Salinity, Chloride, Sulfate, Alkalinity, Nitrate and Nitrite, Ammonia, Total Nitrogen, Total Phosphorous and Faecal coliforms. The quality of surface water runoff from irrigation areas will be monitored where there is a minimum of 30 mm rainfall in the preceding 24 hours sufficient to cause runoff from the irrigation area. Surface water monitoring will include two event samples of runoff from the irrigation areas collected annually, and analysed for pH, Total Nitrogen, Total Phosphorus, Electrical Conductivity, and Faecal Coliforms. The discharge limits contained in the Development Code may be amended in consultation with the Environmental Protection Agency and Noosa Council following determination of existing water quality conditions through baseline monitoring. No criteria have been specified for groundwater quality, therefore it is proposed that criteria be defined following the completion of baseline monitoring which commenced in December 2004. Locations for water quality monitoring are presented on Figure 2. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\éffluent Irrigation Management Plan - Stage 1 Version 2.doc Page 5
Page 10
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F » NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno 4. EFFLUENT IRRIGATION MANAGEMENT PLAN 4.1 Terminology The term Principal refers to Petrac Leisure NNS-S Pty Ltd. The term Operator refers to any party or company responsible for operation of the STP facility and infrastructure and the effluent irrigation system. The term Contractor refers to any party or company performing works associated with operation of the sewage treatment plant and effluent irrigation system and includes all employees of the Contractor and sub-contractors. The term Consultant refers to the civil and/or environmental engineering consultant employed by the Principal. The term Works refers to all matters associated with the sewage treatment plant and effluent irrigation system. The term EPA refers to the Environmental Protection Agency. The term EIMP refers to this Effluent Irrigation Management Plan. The term Act refers to the Environmental Protection Act 1994. 4.2 EIMP Structure This EIMP includes the following key components: e Rationale: identification of the element to be managed and the environmental impact of activities associated with each element. e Objectives: identification of the environmental objectives and targets to be achieved in line with the rationale and in compliance with applicable legislation. e Tasks/Actions: monitoring and management measures to be implemented in order to achieve the stated objectives and targets and to ensure impact mitigation. e Performance Indicators: measurable indicators and standards set to assess the efficiency of management measures and determine compliance with the EMP. e Monitoring: monitoring requirements to measure compliance with the performance indicators and frequency of monitoring. e Reporting and Review: the requirements for reporting of monitoring results and review of management measures where required. e Corrective Action: measures to be undertaken should monitoring indicate non- compliance with performance indicators. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 6
Page 11
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F >) NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno 4.3 Relevant Legislation The primary legislation relevant to this EIMP is the Environmental Protection Act 1994 (EP Act). The EP Act protects environmental values through development and implementation of environmental protection policies and regulates environmentally relevant activities prescribed in the Environmental Protection Regulation 1998. The Environmental Protection (Water) Policy 1997 (EPP Water) ensures protection of environmental values from activities that may result in the release of contaminants to waterways or stormwater drains. 4.4 Program and Contractual Obligations The EIMP covers the operation phase of the works. This is defined as the period from the commencement of sewage treatment and disposal works to the substantial completion of the sewage treatment and disposal works. The Principal is generally responsible for ensuring that the provisions of the EIMP are met, with the exception of certain planning or design issues, which are explicitly noted throughout the EIMP as being the responsibility of the Contractor or the Consultant. The Principal shall ensure that all persons who are to be employed or sub-contracted for the works shall be trained as to their individual responsibilities as set out in this EIMP and as provided by the Act, including the following. General Environmental Duty — whereby a person in the performance of their duties shall not do so in a manner which will cause, or is likely to cause, environmental harm unless the person takes all reasonable and practical measures to prevent or minimise the harm. Duty to Notify Environmental Harm — whereby if a person in the performance of their duties becomes aware that serious or material environmental harm is caused or threatened, then the person must contact the Contractor whereupon the Contractor must immediately notify the Principal and/or the EPA. Compliance with the EIMP — whereby a person in the performance of their duties shall do so in a manner that ensures that the provisions of this EIMP are complied with. 4.5 Non-Compliance and Corrective Action Requirements The Principal shall assume responsibility for implementation of this EIMP. Where the Principal becomes aware of a site or operational condition that does not comply with stated performance indicator(s) of this EIMP, there is a requirement for corrective action. A Corrective Action Request (“CAR”) form is to be completed and authorised where appropriate in general compliance with the example CAR form provided in Appendix A of this EIMP. The Principal is also required to maintain a register of CARs, which shall demonstrate that appropriate actions have been completed within a suitable timeframe. Any CAR registered in accordance with this EIMP shall be provided to the Principal, any State or Commonwealth Government Department, any statutory authority or other person, consensually or as lawfully required. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 7
Page 12
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 F » NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno In some instances, further investigation or monitoring may be required to establish whether the Principal has failed to adequately implement the EIMP, or has failed to comply with relevant legislation, guidelines and statutes. In these instances, an independent party such as the Consultant shall carry out the investigation or monitoring. If it is established that the cause for non-compliance with the stated performance indicator(s) has arisen from the Contractor's actions or omissions, then the costs of the monitoring shall be deducted from payments to the Contractor and paid to the Consultant, otherwise the costs of the monitoring shall be obtained from the Principal and paid to the Consultant. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 8
Page 13
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL Cardno G 4.6 Element 1: Effluent Storage Lagoon RATIONALE: Uncontrolled discharge from the effluent storage lagoon may result in impacts on soils, surface water and groundwater. Management measures are required to prevent uncontrolled discharges. OBJECTIVE: To operate and manage the effluent storage lagoon to prevent deterioration of receiving environments. TASKS/ ACTIONS: e The storage lagoon shall be constructed with a 600mm impermeable clay lining to reduce the possibility of infiltration of treated effluent to groundwater e Stormwater diversion banks/drains shall be installed around the effluent storage lagoon to exclude overland runoff from entering the lagoon. e The storage lagoon shall be operated and maintained to ensure lagoon stability and prevent discharge through the bed or banks of the lagoon. e In the event that effluent levels within the lagoon rise within 1m of the top level, super-irrigation of the effluent irrigation areas shall be undertaken. e Where super-irrigation is not possible due to wet weather or soil conditions, the excess effluent shall be tankered to a licenced effluent disposal facility. e Where effluent quality within the lagoon is determined by monitoring to be not in compliance with the specified release limits, effluent shall be transported back to the STP for re- treatment. PERFORMANCE INDICATORS: Quality of effluent released from the effluent storage lagoon shall comply with the following water quality objectives specified by EPA in the Negotiated Decision Notice. Parameter Quality Criteria Release Limit Biochemical Oxygen Demand (BOD) 20mg/L maximum Dissolved Oxygen (DO) 2.0mg/L minimum Suspended Solids (SS) 20mg/L maximum pH 6.5 — 8.5 range Total Nitrogen (TN) 5mg/L maximum Total Phosphorous (TP) Aimg/L maximum Free Residual chlorine 0.3 - 0.7mg/L range Faecal Coliforms (FC) < 10 cfu/100mI < 100 cfu/100ml median maximum Turbidity 2 NTU 80" percentile MONITORING: Levels within the effluent storage lagoon shall be monitored on a weekly basis. The quality of effluent in the treated effluent storage dam shall be monitored on a quarterly basis for pH, conductivity BOD, DO, SS, TN, TP, FC, ammonia, nitrite and nitrate, turbidity and residual chlorine. Petrac Leisure NNS-S Pty Ltd 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 4 Version 2.doc Version 2 17 July 2006 Page 9
Page 14
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno REPORTING/ Accurate records shall be maintained of effluent levels within the RECORDING: lagoon and all monitoring results. Operators shall submit monthly reports of all monitoring data to Council during construction and establishment phases. Operators shall submit annual reports of all monitoring data to the EPA on annual basis or as specified in the development approval conditions. CORRECTIVE Should there be non-compliance with the stated performance ACTIONS: indicator the following corrective actions are to be implemented. Identification of the cause of the non-compliance; Implementation of appropriate mitigation measures as determined by the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Principal shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. In the event of a significant environmental incident the emergency details in Element 5 of this EIMP shall be followed. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 10
Page 15
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 } » NOOSA NORTH SHORE ECO-TOURISM PORTAL Cc Cardno 4.7 Element 2: Effluent Irrigation System Infrastructure RATIONALE: Failure of components of the irrigation system may result in the accidental or uncontrolled release of contaminants to receiving environments. Maintenance and management measures are required to ensure no significant impacts occur to receiving environments. OBJECTIVE: To maintain and manage the effluent irrigation system to prevent impacts due to accidental effluent release to the receiving environment. TASKS/ ACTIONS: e Effluent irrigation infrastructure shall be constructed so as to eliminate the possibility of spray drift from the area. e Effluent irrigation pipelines shall be placed underground to reduce the risk of damage from impact with machinery such as lawnmowers. e The underground piping for the irrigation main lines shall be placed in trenches of 450mm depth and sub-surface drippers shall be placed at 50mm to 100mm below the surface. Pipe bedding materials shall consist of sand. e Prior to backfilling of underground piping, the irrigation system shall be checked for any leaks or failures within the system and to ensure that distribution of flow is provided evenly across the entire irrigation area. e Fittings with connection to the effluent irrigation system shall be colour coded and be distinguished from those of the potable water system to prevent cross-connection. The pipe colour coding system shall be as follows. Recycled Water — purple/lilac pipes Fire suppression water — blue pipes Potable water — steel or black PVC pipes e Adequate valving shall be provided in pipelines to allow isolation for repairs. Bursts within the irrigation system shall be isolated and repaired as soon as practicable. e A preventative maintenance program shall be established to ensure that irrigation equipment is maintained in adequate operating condition. PERFORMANCE INDICATORS: Accidental spills or contamination of receiving environments due to failures in the irrigation system shall constitute non-compliance with this EIMP. MONITORING: Weekly monitoring shall include visual inspection of all irrigation system infrastructure including all visible pipelines and fittings, all pump infrastructure and connections and any stormwater diversion banks surrounding the irrigation area. Visual inspection of the condition of all above ground distribution infrastructure over the site shall be undertaken including all visible distribution pipes and pump sheds on a weekly basis. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 11
Page 16
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 ] » NOOSA NORTH SHORE ECO-TOURISM PORTAL CC Cardno REPORTING/ Records shall be maintained of any failure of irrigation system RECORDING: components and of any repairs or corrective actions undertaken. Operators shall submit monthly reports to Council during construction and establishment phases providing details of all monitoring results, environmental incidents and emergencies and corrective actions undertaken. CORRECTIVE Should there be non-compliance with the stated performance ACTION: indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Contractor in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Contractor shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. In the event of a significant environmental incident the emergency details in Element 5 of this EIMP shall be followed. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 12
Page 17
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL qc Cardno 4.8 Element 3: Effluent Irrigation Areas RATIONALE: Effluent irrigation will result in the release of contaminants to soils and may result in the release of contaminants to groundwater. Management measures are required to ensure no significant impacts occur to soils or groundwater within the irrigation areas and the receiving environment. OBJECTIVE: To manage irrigation areas to maintain soil and groundwater quality and prevent soil erosion. TASKS/ e A measurement of the soil moisture content of soils within the ACTIONS: irrigation areas shall be undertaken prior to the application of treated effluent. Irrigation shall be limited to that which is sufficient to wet the soil to its undrained limit to prevent effluent runoff or ponding. e Soil structure shall be maintained to optimise infiltration and permeability as indicated by monitoring. e Application of effluent to the irrigation area shall cease whenever there is rainfall on the irrigation area. Re-application shall be restricted until soil moisture levels are below the undrained upper limit for the soil. e Should ponding or runoff of effluent occur within the irrigation areas, effluent irrigation to that area shall cease immediately. e The irrigation area shall be maintained in a well-grassed state with a minimum of 95% vegetation cover at all times. Where necessary, turf, pasture grass or trees shall be replaced to maintain the vegetative cover. e Corrective actions shall be undertaken if the vegetation within the irrigation area is determined to be visibly degraded. e Use of nitrogen fertiliser within irrigation areas shall be limited and applied only as required. Nitrogen deficiency shall be indicated by vegetation monitoring. Use of phosphorus based fertiliser shall be restricted. e Stormwater diversion infrastructure shall be installed around the irrigation area. Erosion control measures shall be installed on areas of exposed soils. e A vegetated bund shall be installed at the southeastern boundary of the irrigation area to detain pooled effluent during super- irrigation. PERFORMANCE | Degradation of soil quality within irrigation areas shall indicate non- INDICATORS: compliance with this EIMP. Degradation of water quality within receiving environments shall indicate non-compliance with this EIMP. Visible areas of soil erosion within irrigation areas shall indicate non- compliance with this EIMP. MONITORING: Soil conditions shall be monitored at nominated sampling locations within each of the irrigation sites. Samples from representative sites within the irrigation areas shall be collected from each of the topsoil Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 13
Page 18
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno and sub-soil strata every two years. Soils monitoring shall include analysis of soil pH, Sodium Adsorption Ratio, Calcium/Magnesium Ratio, Exchangeable Cations, Total Cations, Electrical Conductivity, Nitrogen, Phosphorous, Calcium, Magnesium, Chloride and Sodium. Gypsum/lime shall be applied to soils as indicated by the results of soil monitoring and analysis. Baseline monitoring of groundwater quality shall be undertaken quarterly for one year prior to the commencement of construction. Monitoring of groundwater quality shall be undertaken quarterly during construction and for 2 years after construction works and annually thereafter or as specified by the conditions of the development approval. Groundwater monitoring points shall be established up-gradient and down-gradient of the STP, the effluent storage lagoon and the irrigation area. Groundwater monitoring shall include analysis of pH, Electrical conductivity, Total dissolved solids, Biochemical oxygen demand, Sodium, Salinity, Chloride, Sulfate, Alkalinity, Nitrate and Nitrite, Ammonia, Total Nitrogen, Total Phosphorous and Faecal coliforms. Groundwater depths shall be determined quarterly during construction and for two years following construction and annually thereafter. Surface water quality monitoring shall be undertaken of runoff from irrigation areas where there is a minimum of 30 mm rainfall in the preceding 24 hours sufficient to cause runoff from the irrigation area. Surface water monitoring shall include two event samples of runoff from the irrigation areas collected annually, and analysed for pH, Total Nitrogen, Total Phosphorus, EC, and Faecal Coliforms. Monthly monitoring shall include a visual inspection of the condition of the vegetation and evidence of soil erosion within irrigation areas. Regular inspection of the stormwater diversion infrastructure around the irrigation area shall be undertaken on a weekly basis. REPORTING/ RECORDING: Operators shall submit monthly reports to Council during construction and establishment phases providing details of all monitoring results, environmental incidents and emergencies and corrective actions undertaken. Accurate records shall be maintained of all monitoring results. These monitoring results shall be forwarded to the EPA as part of the annual report. Any signs of soil erosion or deterioration of vegetation health shall be noted and appropriate corrective actions taken and recorded. CORRECTIVE ACTION: Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Contractor in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Contractor shall implement the corrective action(s) as required Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 4 Version 2.doc Page 14
Page 19
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 } » NOOSA NORTH SHORE ECO-TOURISM PORTAL Cc Cardno within the agreed time frame noted on the CAR. In the event of a significant environmental incident the emergency details in Element 5 of this EIMP shall be followed. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 15
Page 20
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 > NOOSA NORTH SHORE ECO-TOURISM PORTAL C y Cardno 4.9 Element 4: Contingency Management RATIONALE: The operation of the STP and effluent irrigation scheme has the potential to result in contingency situations such as the uncontrolled release of effluent. Contingency procedures are required to provide for effective management of these situations. OBJECTIVE: To prevent degradation of the receiving environment. To prevent the risk of health impacts on the public. TASKS/ Minor Effluent Spill ACTIONS: Should a minor effluent spill occur during the operation of the facilities the following response procedure shall be implemented. 1) An assessment of the size and origin of the spill is to be made by the Operator. 2) Actions shall be taken to safely stop further release of effluent from the process train. Actions may include the isolation of valves or pumps within the process train. 3) Actions shall be taken to safely contain the spilled effluent and prevent the release of the effluent to the receiving environment. Actions may include, for example, the use of sandbags or earth bunding to aid in containing the effluent. 4) Actions shall be taken to safely pump any captured effluent back into the balancing influent tank for treatment. 5) An assessment shall be made of the size of the spill and of the requirement to notify the EPA. Major Effluent Spill Should a major effluent spill occur during the operation of the facilities the following response procedure shall be implemented. 1) An assessment of the size and origin of the spill is to be made by the operator. 2) — If itis possible, actions shall be taken to safely stop any further release of effluent from the process train. 3) Actions shall be taken to notify the EPA of the effluent spill and an emergency spill response shall be co-ordinated in conjunction with the EPA. 4) Actions shall be taken to safely contain the effluent if this is possible. Actions may include, for example, the use of sandbags or earth bunding to aid in containing the effluent. 5) Cleanup of the site shall be undertaken as quickly as is practicable and appropriate actions shall be taken as instructed by the EPA. Community Complaints The Principal shall implement the following procedure should a community complaint be received, which relates directly to the operation of the STP and irrigation scheme. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 16
Page 21
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL qC Cardno 1) | Complete a Complaint register form. 2) The Principal shall determine if the complaint is valid and if further action is required. 3) The Principal shall determine whether notification to the EPA is required. 4) — The complainant shall be notified within 24 hours advising of actions that will be taken. 5) If the issue cannot be investigated and finalised within 24 hours, then information regarding the preliminary assessment of the complaint and a date when a full response will be available shall be provided within 24 hours. 6) | The complaint response must be signed off by the Principal indicating that it has been dealt with satisfactorily. Should the investigation of a complaint reveal a non-conformance with the requirements of the EPA, then a non-conformance is to be raised and the corrective action process initiated. Environmental Incident The Principal shall make an assessment of any events that may be considered an environmental incident. The Principal shall notify the EPA of any incidents that have caused environmental harm. An Environmental Incident Form shall be completed for any environmental incidents. All environmental incidents shall be classified as non-conformances and corrective action initiated. Variations in Groundwater Quality In the event that variations in groundwater quality are greater than 10% of the established baseline levels, further investigations shall be undertaken by a suitably qualified consultant in consultation with Council and the EPA to determine the source of contamination and the requirements for remedial actions. MONITORING: This EIMP element shall be continually reviewed and maintained to ensure that the best possible contingency situation management procedures are in place. REPORTING: Operators shall submit monthly reports to Council during construction and establishment phases providing details of any environmental incidents and emergencies and corrective actions undertaken. The Principal shall report any emergency situations to the EPA as soon as is practicable after the emergency situation occurs. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 17
Page 22
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 I ) NOOSA NORTH SHORE ECO-TOURISM PORTAL Cc Cardno CORRECTIVE ACTION: Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Operator in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Operator shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc Page 18
Page 23
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 4 » NOOSA NORTH SHORE ECO-TOURISM PORTAL q Cardno FIGURES Figure 1 Proposed STP, Wet Weather Storage and Irrigation Areas Figure 2 Monitoring Locations Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effiuent Irrigation Management Plan - Stage 1 Version 2.doc
Page 24
y= sete “agenion 60 SLO IN
g0/962L ON Walolg
SVAUV NOLLVDINYI GNV aDvHOLS es SSG stones svi
é woge6uy] 10} perueseyy DUET -) ureyy Jemag pesodoid a
YSHLVAM LAM ‘dS GaSOd0ud epunogwuvaig mia —————_——
| auNDIA sey si opto posodous . vouaes oostt Sina ahuneneoOeESS
(ev) OoSt:1 a1e9g
GN3931
yue| Japeay
Jaye 81qe10q4
SoURUaIUIP|y
i
paug i /
5) i ueL epeeH}
% Jaye pajohoey
== - Aa | uoobe7 abe101¢
| 1 aurea eM
auoZ Jayng
ally ise
youlseig Jayng
v 9uoZ Jeyng edeospue7 jse’
See
J
une nel “h Jayng aul4 sam
| youldaig seyng
OupIag ‘W1LUOd WSINOL-003 SHOHS HLUON VSOON
| BOVLS - NVId INSWSDVNVW NOLLVOINHI LNIN1543
Page 25
su enntun arin spot osnion fanvon- Pantie su snpbua em RODE IEE TARO “wots ~ S002 “sAqHAAON 60 _3LVG LN BF] Aid SSN 8275167 a 80/9622 ON Wealolg $002 J8QUIBAON 60 :2}8G “BUC ney, SNOILV9071 OSNIYOLINON rma nae seven onegncapaan teed @ ayndld aise etre are et Seeman tana aea ae Sle BuyoyUO; Jayemaoepng SII@M SuuoyuoW se¥empunD1D -~@- ONa9D31 “W1dOd WSIENOL-O03 SHOHS HLYON YSOON | 3DVLS - NVid LNSNS9VNVW NOILLVOIY! LN3N1453
Page 26
Beach Road Holiday Homes - Stage 2 Cardno
Construction EMP
a PROPOSED NEW ENTRANCE ONTO BEACH ROAD
v
vy
vy
v v
DFA me
EA 4
Ay OY
FIP] v
] BAY
| wi
t v
\ EXISTING: 2.4HA vy wv
\ YY n ¥
\ v
¥ v|
t ¥ ws
\
l yo
v y
sb v
wv
y v
v v
v
ng v
LORI v 4
REL R EERILY v
1 LOL SERN KL v
oy, YRIS Baer ictica BRR v
LS ETAL SS PEL LR
i TIRE REO
Law
LEGEND
=e Site Boundary
V/A Irrigation Area
(ZA Fire Butter
Service Infrastructure
Wetland Buffer
eae Proposed Bund
Proposed Builders Compoud
Access Road
\
a S ‘
a ~
Wis Th, :
SITE BASE PLAN SOURCED FROM DEIKIE RICHARDS,
© Carcno (Qi Ply Ltd Al Rights Resorved 2007
ha whol od ey pat of ha caw beng Carin (0) Py i and
fray nat use, el, Wotore, cols eproaucea whole arpa Mo rat
{Sim orem eny med tary parson char any eprearantwen Ga (x Py Ud
Is proton by Carn (Ol) Py Lis she rth bert ade by
ohare Can
i cciarmenreeststae emer CaN PROPOSED BUILDERS COMPOUND
‘Sy an eratonce by pry on he crate coca.
Rev: 2 Date: 10 May 2007 Project No.: 7296/08
2/2 Dllywwe
5 0 5304S 5M 50 Scale 1:1500 (A3)
Petrac Leisure NNS-S Pty Ltd FRRT DATE: W Fay, 007 - Ota
{AD FILE ANT296-08\ACAD\Stoge 2\CentrtionEHP\Propoted Buds Compound dug
REF Gabe richard pln si rene
Used in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.