Council archive · source document
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 ] » NOOSA NORTH SHORE ECO-TOURISM PORTAL CC Cardno REPORTING/ Records shall be maintained of any failure of irrigation system RECORDING: components and of any repairs or corrective actions undertaken. Operators shall submit monthly reports to Council during construction and establishment phases providing details of all monitoring results, environmental incidents and emergencies and corrective actions undertaken. CORRECTIVE Should there be non-compliance with the stated performance ACTION: indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Contractor in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Contractor shall implement the corrective action(s) as required within the agreed time frame noted on the CAR. In the event of a significant environmental incident the emergency details in Element 5 of this EIMP shall be followed. Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1:\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 1 Version 2.doc Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.