Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020 · MCU19/0117
EFFLUENT IRRIGATION MANAGEMENT PLAN - STAGE 1 NOOSA NORTH SHORE ECO-TOURISM PORTAL C Cardno and sub-soil strata every two years. Soils monitoring shall include analysis of soil pH, Sodium Adsorption Ratio, Calcium/Magnesium Ratio, Exchangeable Cations, Total Cations, Electrical Conductivity, Nitrogen, Phosphorous, Calcium, Magnesium, Chloride and Sodium. Gypsum/lime shall be applied to soils as indicated by the results of soil monitoring and analysis. Baseline monitoring of groundwater quality shall be undertaken quarterly for one year prior to the commencement of construction. Monitoring of groundwater quality shall be undertaken quarterly during construction and for 2 years after construction works and annually thereafter or as specified by the conditions of the development approval. Groundwater monitoring points shall be established up-gradient and down-gradient of the STP, the effluent storage lagoon and the irrigation area. Groundwater monitoring shall include analysis of pH, Electrical conductivity, Total dissolved solids, Biochemical oxygen demand, Sodium, Salinity, Chloride, Sulfate, Alkalinity, Nitrate and Nitrite, Ammonia, Total Nitrogen, Total Phosphorous and Faecal coliforms. Groundwater depths shall be determined quarterly during construction and for two years following construction and annually thereafter. Surface water quality monitoring shall be undertaken of runoff from irrigation areas where there is a minimum of 30 mm rainfall in the preceding 24 hours sufficient to cause runoff from the irrigation area. Surface water monitoring shall include two event samples of runoff from the irrigation areas collected annually, and analysed for pH, Total Nitrogen, Total Phosphorus, EC, and Faecal Coliforms. Monthly monitoring shall include a visual inspection of the condition of the vegetation and evidence of soil erosion within irrigation areas. Regular inspection of the stormwater diversion infrastructure around the irrigation area shall be undertaken on a weekly basis. REPORTING/ RECORDING: Operators shall submit monthly reports to Council during construction and establishment phases providing details of all monitoring results, environmental incidents and emergencies and corrective actions undertaken. Accurate records shall be maintained of all monitoring results. These monitoring results shall be forwarded to the EPA as part of the annual report. Any signs of soil erosion or deterioration of vegetation health shall be noted and appropriate corrective actions taken and recorded. CORRECTIVE ACTION: Should there be non-compliance with the stated performance indicator the following corrective actions are to be implemented. e Identification of the cause of the non-compliance; e Implementation of appropriate mitigation measures as determined by the Contractor in consultation with the Principal; and e Relevant validation monitoring to confirm that the nominated corrective actions have been effective. The Contractor shall implement the corrective action(s) as required Petrac Leisure NNS-S Pty Ltd Version 2 17 July 2006 1\7296-08\WP\technical reports\Effluent Irrigation Management Plan - Stage 4 Version 2.doc Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stage 1 Irrigation Area_90 Beach Rd Noosa North Shore 12.06.2020.pdfRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.