Original source · versioned page text
PEREGIAN BEACH ACTIVE STREET - STAGE 1 PROGRESS UPDATE AND NEXT STEPS (Deferred from the General Committee Meeting dated 16 March 2026) · Report
ORDINARY MEETING 19 MARCH 2026 Street Stage 1 through to the Peregian Beach Village. A recommendation of the report is to support the CEO to submit available grant funding applications for Stage 2 of the Active Street/Coastal Pathway extension to commence design and construction as soon as practicably possible. 6. Ongoing Community Engagement The ultimate success of the Noosa Cycling and Walking Strategy, and the Noosa Transport Strategy relies on improved active transport to reduce reliance on private motor vehicles, as well as achieve a mode of movement aligned to the Noosa lifestyle. There is an ongoing need for community engagement to ensure long term success of the program. The report recommends the development of an “Active Street” and “Coastal Pathway” awareness and education campaign across the shire to raise awareness of the safety and active transport benefits associated with Active Streets and the ultimate delivery of the Noosa Cycling and Walking Strategy and Noosa Transport Strategy. Some initial considerations for such a program include: Phase 1 – Broader shire wide awareness campaign to communicate Coastal Pathway corridor strategy (HPCR), Active Street features and functionality and general walking and cycling safety through: • Multi-channel approach: social media, short videos, school talks, case studies, etc. • Collaboration with QPS & TMR Stakeholders Key messages: ▪ Coastal Pathway Vision ▪ Missing section identification and proposed projects ▪ What is an Active St and how do I use it ▪ “Share the path,” “Shoulder check,” “Leave 1.5m” Phase 2 – Targeted audience for the Peregian Beach Stage 1 Active St to ensure the community and visitors understand how to safely use the new Active Street: • Short “how to use” video • School education sessions – street etiquette/understand the signs • Local ambassadors and community walkthroughs • Targeted social media and local media content • Liaison with enforcement agencies including blitz campaigns Link to Corporate Plan Theme No. 2 - Liveability Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable an inclusive, connected and vibrant community. Objective 2.2 Fund and deliver accessible and improved, parks, open spaces, walking and cycle paths and trails, including greening our paths and cycleways to meet contemporary needs. Objective 2.4 Advocate and partner with all levels of government for increased funding for connected transport nodes, transit hubs, including walking, cycling and public transport and explore opportunities through smart city, smart biosphere and innovation to transform the way we move around and engage in our community.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original