PEREGIAN BEACH ACTIVE STREET - STAGE 1 PROGRESS UPDATE AND NEXT STEPS (Deferred from the General Committee Meeting dated 16 March 2026) · Report
ORDINARY MEETING 19 MARCH 2026
2. Investigation into increasing formalised parking yield across the Peregian Beach South area
including within Victory Park and along Lorikeet Drive. Ongoing investigations include, but
are not limited to: one way circulation through Victory Park; angled parking within Victory
Park, parallel parking on Lorikeet Drive adjacent high density residential zone and formalised
parking at the eastern end of Pitta St;
3. Investigation into a softer colour palette and/or a reduction in perceived over development to
lesser impact, village scale raised intersections, priority crossings, chicanes, speed bumps
and overrun areas where possible within statutory traffic requirements;
4. Widening of the existing boardwalk through Lorikeet Park along the current alignment as well
as inclusion of speed management device to control bike speeds on approach to shared path
and boardwalk through Lorikeet Park;
5. Improvements to Victory Park to least impactful carparking layout but including no-parking
zone in front of the two beach entrances, provision of limited long vehicle parking bays
and end-of-trip facilities such as improved water points and bike racks.
6. Inclusion of additional street tree planting;
7. Investigate additional signage for user behaviour at key locations and nodes;
8. Investigation into Lorikeet Dr and Pitta St intersection design to accommodate vehicle turn
around movements.
9. Investigation into land tenure south of Lorikeet Park bridge to facilitate the continued use and
upgrade of the pathway on the existing alignment.
The report also seeks in-principle support for continuing to invest in Stage 2, subject to future budget
allocation, to achieve connectivity to the Peregian Beach Village, and an investment in a broader
education and awareness program on the benefits of active transport to support delivery of the shire
wide Coastal Pathway Corridor, a key component of Council's Cycling and Walking Strategy.
RECOMMENDATION
REPORT
1. Background and Strategic Foundations
Highest Priority Cycle Route Corridor Study (HPCR)
In 2021, Noosa Council completed the Coastal Pathway Corridor Study or Highest Priority Cycle
Route Corridor Study (HPCR) to plan safer, more connected walking and cycling routes between
Peregian Beach and Tewantin, including a link to the Sunshine Coast Coastal Pathway. The study
reviewed existing paths, identified safety gaps, and assessed possible routes. To ensure community
alignment, Council formed a Project Reference Group (PRG) with community members, local
associations, and walking and cycling groups. The PRG members were nominated and endorsed by
Noosa Council.
Three segments were identified on Corridor 1, Tewantin to Noosa Heads, and 6 segments on
Corridor 2, Noosa Head to Peregian for options analysis and further design work.
Engagement activities were undertaken with the PRG at key milestones and decision points
throughout the project. Specifically, this included engagement at the route selection, design
treatment selection and concept design review stages
For Peregian Beach South (Segment 6 of Corridor 2), four route options, as indicated in figure 1