Decision Notice - 010.2007.00000256.001 [As Published] · 132007.256
2007/256
$152,949
TOTAL Contribution Amount =
Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from March 2008 until the date of payment.
All contributions must be paid prior to the issue of a Development Permit for Operational
Works.
Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
contributions not be paid at the due time, Council shall call upon the trading bank guarantee in
full.
Processing of bonds for security where specific Council approval has been given for the
bonding of contributions will incur an administration fee in accordance with Council’s Land
Development Commercial & Regulatory Fees at the time of lodgement.
In the event that the Development Permit for Material Change of Use of Premises lapses or is
cancelled, the trading bank guarantee will be returned.
General
63. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
63.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
63.2. Disposal for firewood.
63.3. Disposal for landscaping purposes.
63.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Work. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
64. A suitably qualified Registered Professional Engineer shall prepare engineering drawings and
specifications for all engineering works that will become Council infrastructure, which shall be
submitted in conjunction with an application for a Development Permit for Operational Works.
To avoid conflict with underground pipes or services, all existing and proposed services
required by the development shall be shown on the plans.
65. The Construction Management Plan shall incorporate practices to minimise the risk of damage
occurring to Council services.
66. Any damage caused to any public utility during the course of construction shall be repaired to
Council’s standards and at no cost to Council.
67. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
68. The transportation of all materials to and from the site shall be undertaken in a manner such
that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Page 9 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2007.00000256.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 98 KB (small file)
- File type
No other editions are linked here.