Appendix 3 - Bicycle Parking
Attached to the e-mail MCU17/0524 - Information Response.
SMOKE DETECTORS PROTECTION OF OPENABLE WINDOWS
To comply with AS 3786-2014 and the
GATEWAY DRIVE
Protection of openable windows to be in compliance
Building Fire Safety (Domestic Smoke
with Part 3.9.2.5, Vol 2 of the NCC. A window opening
Alarms) Legislation Amendment 200 6000 200
must be provided with protection, if the floor below the
Regulation 2016 - smoke alarms. window in a bedroom is 2m or more above the surface
Approved smoke detectors with mains beneath (Unless the lowest level of the window opening
supplied power and battery backup. is more than 1.7m above the finished floor level).
Smoke alarms must be installed on each
storey:
200
i) in each bedroom; and NOTES:
ii) in hallways which connect bedrooms
and the rest of the All plumbing fixtures and installations including
dwelling; or pressure limiting devices, hot water systems and dual
flush toilet suites to be WELS rated in accordance with
3000
iii) if there is no hallway, between the
bedrooms and other parts Dedicated Bicycle Spaces x 2 MEZZANINE AS/NZ 6400 - 2005 & AS 3500, and incompliance with
of the storey; and Part 4.1 of the Queensland Development Code (QDC).
iv) if there are no bedrooms on a storey
at least one smoke alarm All wet areas are to be waterproofed in accordance
must be installed in the most likely path with Clause 3.8.1, Vol 2 of NCC.
of travel to exit the
dwelling. All glazing is to be installed in accordance with Clause
Where practicable smoke alarms must 3.6, Vol 2 of the NCC.
be placed on the ceiling. Smoke alarms
must not be placed: Stairways are to be installed in accordance with Clause
i) within 300mm of a corner of a ceiling 3.9.1, Vol 2 of the NCC.
and a wall;
ii) within 300mm of a light fitting; Handrails and balustrades are to be installed to comply
iii) within 400mm of an air-conditioning with Clause 3.9.2, Vol 2 of the NCC.
vent;
iv) within 400mm of the blades of a Masonry to comply with AS 3700.
ceiling fan. External fixtures & fittings to be non-combustible & hot
14700
dip galvanised or of corrision resitant material.
9110
Confirm all dimensions and design information on site
Gross Building Area prior to commencement of work.
Name Area (m²) Squares (SQ)
FLOOR 77.3 m² 8.3
MEZZANINE 12.5 m² 1.3
Total Use Area 89.8 m² 9.7
STORE
90
2500
WC
200
3910 90 1010 90 900
PROPOSED FLOOR PLAN
Scale 1 : 100
MCU FITNESS CENTRE SCALE @A3
0 1m 2m 3m 4m 5m
ZEST BUILDING DESIGN STUDIO Project Address Drawing Title 1:100
Sunshine Coast 2/37 Gateway drive, Noosaville
P | 0457314346
A | 30 Wattlebird Drive, Doonan, QLD 4562
E | [email protected]
W | www.zestbuildingdesign.com.au
ABN: 37 601 151 508
Q.B.C.C Lic. No: 1307012
QLD
Client Name
PROPOSED FLOOR PLAN
A.02
Phase Bld # Issue
Designer (s)
I. Brundell
RG STRATEGIC 1
Issue
MCU Application
Description
30/08/2017
Date
17077 CA 1
Original sheet size A3 (297x420) Plot date: 06-Sep-17 2:59:12 PM
MCU
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.