Dear Conor,
RE: INFORMATION REQUEST RESPONSE PURSUANT TO SECTION 278 OF THE
SUSTAINABLE PLANNING ACT 2009
178 EUMUNDI NOOSA ROAD, NOOSAVILLE
We act for Bunnings Properties Pty Ltd, regarding the above Development Application. This
Development Application seeks approval of a D velopment Permit for Operational Works -
Vegetation Clearing.
On 20 August 2012 an Information Request was received from Sunshine Coast Regional
Council. Pursuant to Section 278 of the Sustainable Planning Act 2009, we provide our response
to this information request below.
INFORMATION REQUEST RESPONSE
1 (a) Condition 1 appeal NO.2379 of 2009 of development approval package marked "A
states, inter alia, development must generally comply with the approved plans of
development. Demonstrate compliance with the approved Site Plan as it is noted the
area lies outside of the approved site plan.
Plan Rev. Plan I Document Name Date
No.
030 P7 Site Plan -
John R Brogan & Associates 27.05.09
Response:
Whilst the proposed vegetation clearing area is located on the same allotment to which
Development Approval 2379 of 2009 relates, the proposed vegetation clearing area is
not included in the approved Site Plan Ref. 030 P7. Furthermore, there are no
conditions requiring the retention of vegetation within the proposed vegetation clearing
area. Therefore, Development Approval 2379 of 2009 does not apply to the proposed
vegetation clearing area. As such, the proposed development does not conflict with the
proposed vegetation clearing.
1. (b) Condition 3 appeal NO.2379 of 2009 of development approval package marked "A"
states
Existing trees on the site and within road reserves are to be retained, except where
required to be removed due to building operations or the conduct of the approved
.
use. These landscape plans required to be submitted are to denote areas of existing
vegetation or existing trees proposed or required to be retained.
England I Wales I Scotland I Northern Ireland I Ireland I Netherlands I USA I Australia
fifsAustralia East Ply LId ABN 44 1<10 292 762 A member of the RPS Group PIc
IlrlDPR102995-1O_IRR_27.02.13.dOCX
P?1<
Iso. &(37)c.
x. ..................
..
R.
to
1
....................
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
\.->
, Page 2
RPS
Demonstrate the proposed vegetation clearing is in accordance with the conduct of
the approved use or due to building operations.
Response:
As noted above, the proposed vegetation clearing area is not included in the area of the
existing approval. Similarly, the Landscaping Plan prepared in relation to the
aforementioned approval does not identify vegetation for retention within the proposed
vegetation clearing area. Therefore the proposed clearing is not precluded by the
previous approval.
2. Outcome 3 of the Biodiversity Overlay Code requires interference with vegetation
only occurs where:
a) no other suitable cleared or partially cleared area is available on the premises;
b) the development minimises the total footprint within which all activities, buildings,
structures, driveways and other works are contained; and
c) the development is located in areas of low ecological value over other areas, to
the greatest extent practicable.
,
Demonstrate compliance with the overall outcome 3 specifically justify the removal of
native vegetation in the absence of any other development proposal for the area.
Response:
As detailed in the Ecological Assessment Report lodged with the development
application material, based on an assessment of the field survey results against the
Noosa Plan Biodiversity Overlay, it was determined that the identified area of vegetation
(proposed to be cleared) does not conform to the definition of an Environmental
Protection Area. The characteristics of the vegetation are unchanged between then and
now. Therefore, provisions within the Noosa Plan Biodiversity Overlay relating to
Environmental Protection Areas, including Outcome 3, should not be considered in
relation to the proposed development.
’
"’4
The subject site is a 0.4 ~ectare rectangle of Industry Zone land which is completely
surrounded by cleared industrial land, large scale development and a wide road
designed to cater for industrial vehicles. The site is not large enough to be considered
as "remnant", being only about 150 m x 75 m. This size, when considered against the
surrounding uses, edge effects and earlier disturbance, significantly reduces its value as
a functional ecological corridor.
The future development of this site is supported by and expected under the Planning
Scheme, such development is predicated on the (approv d) removal of this area of
vegetation. Appropriate interim weed management, erosion and sediment control
measures will be implemented in accordance with the’ recommendations of the
Ecological Assessment Report.
3. Demonstrate compliance with the specific outcomes of outcome 9 and outcome 11 of
the Biodiversity Overlay Code with relation to how the vegetation clearing proposal
meets these outcomes. It is noted no building works or other operational works have
been proposed at this stage.
Response:
The site does not include a ,ridgeline or hills lope area. The site comprises part of an
established Industrial Zone. Therefore, retention of vegetation is not required for scenic
amenity purposes.
As detailed in the Ecological Assessment Report, due to the isolation of the site and the
il,1dustrial nature of the surrounding development, the small patch size, its disturbed
nature and its location within a heavily developed area, it would only provide marginal
habitat value and it is, therefore, not appropriate to retain the limited number of habitat
.
trees.
PR102995-10_IRR_27.02.13,docx
Page 3
...
~~" ...
t.’
Page 3
We reiterate that the future development of this site is predicatedon the (approved)
removal of this area of vegetation. Appropriate interim weed management, erosion and
sediment control measures will be implemented in accordance with the
recommendations of the Ecological Assessment Report.
4. Demonstrate compliance with Outcome 16 of the Biodiversity Overlay Code by
addressing the probable solutions contained in Column 1 or Column 2 of Outcome
16 by way of justifying the removal of the vegetation for a.specific development
outcome suitable for the site in accordance with the relevant approvals and provide a
landscaping plan in accordance with s16.1 and s16.2 of the Biodiversity Overlay
Code.
Response:
The proposed development involves the clearing of the identified isolated patch of
vegetation. As noted above, the isolation of the patch of vegetation and the surrounding
indu~trial context make the site of little habitat value. Appropriate erosion control
measures will be implemented. Permanent landscaping will be determined as a part of
future applications.
In accordance with Section 278(1 )(a) of the Sustainable Planning Act 2009 this letter constitutes
a response to all of the information requested. We ask that the Requesting Authority, Sunshine
Coast Regional Council, proceed with ssessment of this development application.
We trust this information is sufficient for your purposes, however should you require any further
details or clarification, please do not hesitate to contact Morgan Jones or the writer by telephone
on 31249372.
Yours sincerely
RPS
LINDA TAIT
Planner
enc
cc Bunnings Properties Pty Ltd
_J
I PR102995-10_IRR_27.02.13.docx
t
Used in these records
Response to information request - OPW12/0257Related documentApplication case desk ↗
About this file
- File size
- 2.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.