Skip to the record
Every meeting, every word.

Council archive · source document

Response to information request - OPW12/0257

of 3

Text shows just the words. Original shows the document exactly as it was published.

                                                                                                                            ...
                                                                                                                                  ~~"   ...




    t.’




                                                                                                      Page 3




                    We reiterate that the future development of this site is predicatedon the (approved)
                    removal of this area of vegetation. Appropriate interim weed management, erosion and
                    sediment control     measures     will  be  implemented in accordance with the
                    recommendations of the Ecological Assessment Report.

          4.        Demonstrate compliance with Outcome 16 of the Biodiversity Overlay Code by
                    addressing the probable solutions contained in Column 1 or Column 2 of Outcome
                    16 by way of justifying the removal of the vegetation for a.specific development
                    outcome suitable for the site in accordance with the relevant approvals and provide a
                    landscaping plan in accordance with s16.1 and s16.2 of the Biodiversity Overlay
                    Code.

                    Response:
                    The   proposed development involves the clearing of the identified isolated patch of
                    vegetation. As noted above, the isolation of the patch of vegetation and the surrounding
                    indu~trial context make the site of little habitat value. Appropriate erosion control
                    measures will be implemented. Permanent landscaping will be determined as a part of
                    future applications.


          In accordance with Section 278(1 )(a) of the Sustainable Planning Act 2009 this letter constitutes
          a response to all of the information   requested. We ask that the Requesting Authority, Sunshine
          Coast Regional Council, proceed with      ssessment of this development application.


          We trust this information is sufficient for your purposes, however should you require any further
          details or clarification, please do not hesitate to contact Morgan Jones or the writer by telephone
          on 31249372.



          Yours sincerely
          RPS




          LINDA TAIT
          Planner


          enc



          cc           Bunnings Properties Pty Ltd




                                                                           _J




I                                                                                           PR102995-10_IRR_27.02.13.docx

t

Used in these records

About this file

File size
2.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to information request - OPW12_0257.pdf · 2.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.