3018AppendixB

Attached to the e-mail RAL21/0018 - Information Request Response - 130 Lake Macdonald Drive Cooroy (Email 2 of 3).

of 34

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (15.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                                    51 640 311 842
                                                                                                                                        CONTACT
                                                                                                                       [email protected]
                                                                                                                                arcosgroup.com.au
                                                                                                                                          OFFICES
                                                                                                            Sunshine Coast | Brisbane | Gold Coast




Table 3: Deep Level Footings – Ultimate Geotechnical Parameters (Long Pile)
                                                                                                                Bored
                                      Material
                                                                                                  Fb (kPa)                     Fs (kPa)

                           Very stiff residual clay                                                  900                           45

                               Weathered rock                                                       1800                           60
Notes: * - Fb = Ultimate End Bearing Pressure (unfactored) for long piles, Fs = Ultimate Shaft Adhesion (unfactored).




The upper 1 m of soil profile should be ignored in shaft calculations to allow for shrinkage
cracks. The values presented in Table 3 assume that the material equal to four pile diameters
below the base of any footings is as strong or stronger.


Settlement values are subjected to a variety of factors; however, a properly designed and
constructed pile should have a serviceability settlement between 1% and 2% of its’ diameter.


9.0 Limitations
Arcos Unit Group Pty Ltd (AG) has prepared this document for Proposed Lot 11 (#130) Lake
Macdonald Drive, Cooroy for Lyndal Petersen. The document is specific to this particular project
and for the purposes as described within the document. The document cannot be used for
any other project on the same site or other sites or relied upon by a third party. Any party
relying upon this document beyond its exclusive use and purpose as stated above, and without
the express written consent of AG, does so entirely at its own risk and without recourse to AG
for any loss or damage. AG has necessarily relied upon information provided by the client
and/or their agents.

It is important to understand that ground conditions can be spatially variable over short
distances as a result of geological processes or human interference. These changes can occur
after the time of which field work was undertaken. Given this, the assumed subsurface
conditions within this document are only indicative of the conditions at the testing locations
to the depths investigated at the time of the fieldwork.

The advice given in this document is based upon the assumed subsurface conditions. The
relevance and accuracy of advice given is directly affected by variations in ground conditions
across the site between testing locations that has not been captured and time elapsed since
investigation works.

This document must be kept in entirety, read in full and understood. Interpretations or
conclusions made by others unless supported by an expressed written statement,
interpretation, outcome or stated within this document cannot be the responsibility of AG.

09 Dec 2021                                                                                  Proposed Subdivision and Residence
Log in to download the original file

3018AppendixB.pdf · 15.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.