Original source · versioned page text
Engineering Drawings Part 2 - OPW14/0197
Attached to the e-mail Doonella Stage C - (Email 1 of 7) - Engineering Drawings Part 2 & cover letter - OPW14/0197.
wy w 2 2 al a © : © . a & 20,00 ROAD RESERVE e 2 2 - LOT 125 - 4.90m 4.28m 4.25m 4.50m . 30mm AC. SURFACING - LOT 136 - 4 MAX v 7 . varies - UN CH 160.000 u DATUM RL_13, 2% 3% 3% ae | saees FINISHED RL 14.405 BI Ly 2 ra - LOT 124 - CH 260.000 | DATUM RLS Tt FINISHED RL 9.964 | - - CH 140.000 \ DATUM RL_14 a \ 2 tor 35 FINISHED RL 15.440 © | t NS 2 2 nb 19 gl - LOT 124 - TYPE ‘MI’ KERB AND CHANNEL <a \ TO IPWEAG STD DRG R-0080, Ns TNS SUBSURFACE PAVEMENT DRAIN vino 10 T r CH 240.000 JO IPWEAG STD DRG R-0140, DATUM _RL_7 ! FINISHED RL 10.403 CH 120.000 | DATUM RL_14 T FINISHED RL 16.261 | a 20.00m woh RESERVE 2 ~ LOT 134 - 2 2 4.50m 5.50m, | 5.50m 4.50m | “torn - 40mm AC. SURFACING 0.90m - Lot 126 - 2% 3% 3% 2%. T CH 100.000 fe C DATUM RL_16 TYPE M1” KERB AND CHANNEL ww L FINISHED RL 17.057 CH 220.000 DATUM RL 8 TO IPWEAQ STD DRG R-0080. — © 1.2m CONCRETE FOOTPATH TO FINISHED RL. 10.893 SUBSURFACE PAVEMENT DRAIN & |P.W.E.A.Q STD. DRG. R-0065 TO IPWEAG STD DRG R-0140, — 1 wy - LOT 123 - S| ~ INTERSECTION MORINDA CIRCUIT - a | 1 IN 4 MAX. © CH 80.000 DATUM RL_16 \ FINISHED RL 17.667 \ my ~ INTERSECTION MULBERRY CLOSE - | CH 200.000 DATUM RL_10 2 2 FINISHED RL 11.793 - LOT 122 - CH 60.000 o ' DATUM RL_17 FINISHED RL 18.033 © 2 | - LOT 75 - 2 2 = INTERSECTION MULBERRY CLOSE - 0.50m - LOT 121 - CH 180.000 el DATUM RL 12 FINISHED RL 13.103 CH 40.000 T e | DATUM RL_17 FINISHED RL 18.175 2 2.0m CONCRETE FOOTPATH TO = |.P.W.E.A.Q STD. DRG. R-0065 S = - LOT 120 - T RI CH 20.000 | DATUM RL_17 al FINISHED RL 18.276 3 el e g ; FILE: N13078-121.dwq DATE: 29-01-2014 TIME: 14:57 Xref's: X-N13078-TIT X-N13078-ROADS USR: leigh fry Taar [ones enw] OAT SORE METRES T TACROPTENT Ne STENT DRAWN THE AMENOMENT DETAILS DesiGn cHecx SURVEYOR: RPS a ~~ Tae 1 INNOVATION PARKWAY, BIRTINYA QM PROPERTIES q (CONSULT AUSTRALIA SHIRE DRIVE ie mo 1 0 1 2 3 6 Sm Ph (07) 5436 7888 Fax (07) 5493 6630 = wi CROSS SECTIONS N 1:200 AR SRO ES ees T plc DRAWN CHECK] PROJECT No. APPROVED SHAUN PILCHER REQ 14583 Brown Consult (QLD) Pty Ltd SHEET 1 OF 2 Ho N13078 JZ: oem Bet te LAKE DOONELLA NOOSA Smart Consulting Meteet es coumass 2 bare = NE BRENT THOMAS RPEQ 7862 STAGE C1 - C6 ma: PSULELVES — Tsetone 075470 960 Focinle 0754709260 | SOT N13078-121 Ga FOR & ON BEHALF OF BROWN CONSULTING (QLD) PTY LTD Rinbene Corboun Wilbomrin Aychiny Cagwpone Gemetinecoet Lic 4064
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.