3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are numbered and titled:
Plan / Document No. Rev. Plan / Document Name Date
WD.707 C12 Proposed Pontoon & Jetty by Kidd and Co 10 July 2009
Designers
and as may be amended by these conditions.
2. Deleted.
3. The pontoon must not exceed the maximum dimensions of 7 metres in length and 2 metres in
width.
4. The overall length of the regatta stairs shall not exceed the overall length of the pontoon.
5. The regatta stairs shall be of open construction as indicated on the Kidd and Co Designers’
architectural plan and shall not have vertical riser timbers as indicated on Schwabe Consulting
Engineers’ plans.
6. The regatta stairs shall be constructed as close as reasonably possible to the face of the rock
revetment wall.
7. All structures associated with the pontoon, including piles, must be constructed wholly within
the approved Resource Entitlement Area.
8. All parts of the existing jetty including paths and supporting elements below water level must
be completely removed.
9. Deleted.
10. Deleted.
11. No boatlifting devices for the purpose of elevating a vessel above the water are to be attached
or moored at the structures without prior Council approval.
12. Deleted.
13. There shall be no electrical reticulation system carrying electricity in excess of 24 volts beyond
the revetment wall.
14. Lighting associated with the use shall be designed, installed, operated, and maintained in
accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
15. The pontoon is to be used for private purposes only with no commercial operations to be
undertaken.
16. Boat repair activities will not be permitted on site.
17. Wastewater and sullage shall only be disposed of at approved pump out facilities.
18. The mooring facility shall not be utilised for live-aboard purposes.
19. Any construction and post construction activity is not to impact on the condition of the
waterway, and is to be conducted so as not to breach the Environmental Protection Act (EPA)
1994 and the Environmental Protection (Water) Policy 1997.
Page 2 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - Concurrence Agency - DERM - Ecoaccess [As Published]Related documentApplication case desk ↗
About this file
- File size
- 223 KB (small file)
- File type
No other editions are linked here.