ORDINARY MEETING AGENDA 16 NOVEMBER 2017
21. Vehicle access to Lots 7 & 8 is are limited to the Road 86419 frontage only (northern
boundary). A clause must be included in the contract of sale for Lots 7 & 8 which
prohibits vehicle access being taken from Eagle Drive.
Pedestrian and Bicycle Facilities
22. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. A 2 metre wide footpath within the road verge for the entire length shown on the
approved plans.
b. A 1.5 metre wide footpath must be provided on the northern side of the bio-
basin extending from Eagle Drive to Clarey Park and a pool fence must be
provided between the footpath and the bio-basin
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Easements
26. A minimum 1.5 metre wide easement for drainage purposes must be registered
against the title/s of the burdened properties in favour of the benefitted properties
over the proposed easements identified on the Approved Plans. The easements must
of sufficient width to wholly encompass the drainage structures and the associated
overland flowpaths.
27. An easement for access and service purposes must be registered against the titles of
proposed Lot 21 in favour of proposed Lot 20
28. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
29. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written
permission from the respective landowner(s) is provided to Council.
Page 14 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.