ORDINARY MEETING AGENDA 16 NOVEMBER 2017
b. fully enclosed or screened such that they are not visible from the street
frontages nor adjoining properties. Where screened by landscaping,
landscaping beds must be at least 1.5 metres wide.
Soil Contamination
9. As part of any Operational Works application for the site a detailed site
contamination assessment report prepared by a suitably qualified and
experienced person in accordance with the procedures and practices detailed
in the National Environment Protection (Assessment of Site Contamination)
Measure 1999 (NEPM) is required. The report must conclude:
a. whether the site is suitable for the proposed new use/development (with
and without remediation and/or management);
b. whether any site contamination is causing, or is likely to cause,
‘environmental harm’ (as defined under the Environmental Management
and Pollution Control Act 1994); and
c. whether any site contamination presents an occupational health and
safety risk to workers involved in redevelopment of the site.
10. If the site contamination assessment report concludes that remediation and/or
management strategies are necessary to avoid risks to human health or the
environment, a proposed remediation and/or management plan must be
submitted to Council prior to the commencement of building works. Any
remediation or management plan involving soil disturbance must include a
detailed soil and water management plan to prevent off-site transfer of
potentially-contaminated soil or stormwater.
NB: It is mandatory for any contaminated land investigation documents,
including investigation reports, validation reports and draft site management
plans to be certified by an approved auditor and must have approval from the
Department of Environment and Heritage and Protection (DEHP). DEHP have
list of approved auditors.
Site Access and Driveways
11. A sealed access driveway must be provided from Ernest Street and Earl Street
to all parking and manoeuvring areas of the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular:
a. driveway crossovers in accordance with Council’s standard drawing RS-
051
b. suitable safety measures, including warning signage, to improve driver
awareness of pedestrians and enhance pedestrian safety. Warning
signage must be provided near the driveways to warn motorists of
pedestrian movement along the street frontages
12. All vehicles must enter and leave the site in a forward direction.
Car Parking
13. A minimum of 38 car parking spaces must be provided and marked on the site
and made available and accessible at all times while the use is open for
business. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. pedestrian routes in accordance with the approved plans
b. provision of vandal resistant public lighting with intensities to satisfy the
requirements of Australian Standard AS1158: Public Lighting Code
c. 1 disabled parking space/s within the total
Page 17 of 45
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.