Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2017-11-16 Ordinary Meeting Agenda

of 45

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                   16 NOVEMBER 2017


              b.    fully enclosed or screened such that they are not visible from the street
                    frontages nor adjoining properties. Where screened by landscaping,
                    landscaping beds must be at least 1.5 metres wide.
              Soil Contamination
        9.    As part of any Operational Works application for the site a detailed site
              contamination assessment report prepared by a suitably qualified and
              experienced person in accordance with the procedures and practices detailed
              in the National Environment Protection (Assessment of Site Contamination)
              Measure 1999 (NEPM) is required. The report must conclude:
              a.    whether the site is suitable for the proposed new use/development (with
                    and without remediation and/or management);
              b.    whether any site contamination is causing, or is likely to cause,
                    ‘environmental harm’ (as defined under the Environmental Management
                    and Pollution Control Act 1994); and
              c.    whether any site contamination presents an occupational health and
                    safety risk to workers involved in redevelopment of the site.
        10.   If the site contamination assessment report concludes that remediation and/or
              management strategies are necessary to avoid risks to human health or the
              environment, a proposed remediation and/or management plan must be
              submitted to Council prior to the commencement of building works. Any
              remediation or management plan involving soil disturbance must include a
              detailed soil and water management plan to prevent off-site transfer of
              potentially-contaminated soil or stormwater.
              NB: It is mandatory for any contaminated land investigation documents,
              including investigation reports, validation reports and draft site management
              plans to be certified by an approved auditor and must have approval from the
              Department of Environment and Heritage and Protection (DEHP). DEHP have
              list of approved auditors.
              Site Access and Driveways
        11.   A sealed access driveway must be provided from Ernest Street and Earl Street
              to all parking and manoeuvring areas of the development. The works must be
              undertaken in accordance with an Operational Works approval and must
              include in particular:
              a.    driveway crossovers in accordance with Council’s standard drawing RS-
                    051
              b.    suitable safety measures, including warning signage, to improve driver
                    awareness of pedestrians and enhance pedestrian safety. Warning
                    signage must be provided near the driveways to warn motorists of
                    pedestrian movement along the street frontages
        12.   All vehicles must enter and leave the site in a forward direction.
              Car Parking
        13.   A minimum of 38 car parking spaces must be provided and marked on the site
              and made available and accessible at all times while the use is open for
              business. The works must be undertaken in accordance with an Operational
              Works approval and must include in particular:
              a.    pedestrian routes in accordance with the approved plans
              b.    provision of vandal resistant public lighting with intensities to satisfy the
                    requirements of Australian Standard AS1158: Public Lighting Code
              c.    1 disabled parking space/s within the total

                                                                                   Page 17 of 45
Log in to download the original file

2017-11-16 Ordinary Meeting Agenda(PDF, 4MB).pdf · 3.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.