                                        Form 6 – Compiled Decision Notice
                                        INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION


      File No:    23643 DA            Date of Decision:      27 September 2007

1.        APPLICANT DETAILS

      Name:              DESIGNINC BRISBANE

      Postal address:    GPO BOX 353, BRISBANE QLD 4001

      Phone no:          3229 5266               Fax no:       3221 0796

2.        PROPERTY DESCRIPTION

      Street address:    12 Park Road

      Suburb/locality    NOOSA HEADS

      Real property      LOT 54 ON RP 52918
      description:

3.        OWNER DETAILS

      Name & Postal      Gregory Woolley
      address:

      Name & Postal      Level 15, 309 Kent Street SYDNEY NSW                              Postcode:    2000
      address:

4.        REFERRAL AGENCIES

      Referral Agency           Address                                                    Basis

      Nil

5.        APPLICATION TYPE

      Development                        Development Details                      Preliminary          Development
                                                                                   Approval               Permit

      Material Change of Use             Dwelling House                               No                      Yes

6.        DECISION DETAILS

     Council on 12 August 2007 decided to approve the application and grant a Development Permit, subject to
     conditions.
     In relation to a request to change the existing approval, Council on the 27 September 2007 decided to:
     A.     Approve the change with amendments to Conditions 1, 5 and 22
     B.     Include Additional Land Development Conditions 45 & 46 and Additional Advice 2, 3 and 4.
     C.     Issue a Compiled Decision Notice
Full text of the other 10 pages

Page 2

7.     APPLICABLE CODES

The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
 Not applicable.

8.     SUBMISSIONS

Four properly made submissions were received.

9.     CONDITIONS

The approval is subject to conditions. Noosa Council’s conditions are attached

10.    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required                 Subject of the required Development Permit

 Building Works                                      Dwelling House

 Operational Works                                   Site Civil Works, Erosion Control, Stormwater Drainage,
                                                     Sewer Reticulation, Landscaping

11.    RIGHTS OF APPEAL

Rights of appeal in relation to this application are attached.

12.    ASSESSMENT MANAGER

 Name:      Noosa Council                 Signature:                                   Date:   28/09/07



DECISION NOTICE HISTORY
 Original Decision Notice 12 August 2004.
 Negotiated Decision Notice with deletion of
   Condition 42 and one advisory note on 29 October
   2004.
 Minor Change to the approval with amendment to
   Condition 8 on 9 February 2006.
 Minor Change to the approval with amendment to
   Conditions 18 and 20 and one additional Condition,
   on 9 August 2006.
 Minor Change to the approval with amendment to
   Conditions 1, 5 and 22 and additional Conditions 45
   & 46 and additional advice 2, 3 & 4 on 27 September
   2007.

Page 3

NOOSA COUNCIL IDAS Development Application Decision Notice                                                                 2




                                           Noosa Council Conditions
                                           INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


Land Use

1.        Development undertaken in accordance with this approval must generally comply with the approved plans
          of development. The approved plans are numbered WD 04.01, WD 04.02, WD 04.03, WD 02.02, and WD
          02.01 prepared by DesignInc Brisbane and dated 02/05/07 showing Job No. 81205.B07 and as may be
          amended by these conditions.

2.        The use and all activity on the site, including construction and excavation, is to be carefully controlled and
          interference with vegetation kept to an absolute minimum to ensure that the proposed use does not
          undermine or compromise the Noosa Hill Development Control Plan and the Strategic Plan objective of
          preserving the natural character and appearance of Noosa Hill. The approval is to be implemented with
          this objective as the overriding factor.

3.        All roofing of the structures on site are to be of a non-reflective nature and coloured with muted earth
          tones. All structures are to use colours that integrate with the natural environment and be of muted earth
          tones of browns, greens, ochres, greys etc generally in accordance with Drawing No. DD04.01_2 B,
          DD04.03_2 B, DD04.04_2 B, DD04.02_2 B dated 2 April 2004.

4.        The glass provided along the western elevation of the dwelling house is to be angled downwards towards
          the slope of the site so as not to be reflective. Non reflective glass shall also be utilised for the
          development.

5.        The maximum site cover for all buildings and structures on the subject site is to be 150m2.

6.        The proposed pool is not approved under this application.

7.        The development must be undertaken and operated in a manner that causes no detrimental effect upon
          the amenity of the neighbourhood by reason of the creation of excessive noise, lighting nuisance or other
          emissions.

8.        The open space and setback areas are to be landscaped in accordance with Council’s Policy on
          Landscaping Guidelines and a properly prepared landscape plan is to be prepared and submitted for
          approval. The landscaping is to be completed prior to the premises being occupied and maintained at all
          times thereafter. The landscape plan is to clearly indicate:-

          8.1.      the retention of vegetation in accordance with Drawing No. DD02.02 B, apart from tree 21, and
                    dated 30 March 2004 and reinforcement planting of endemic species on the site. Tree 21 may be
                    removed where the stump is retained, and a native 100-litre replacement tree is planted within
                    close proximity.

          8.2.      the retention of all existing vegetation on the site outside of the approved building footprint; and

          8.3.      the proposed means of protecting trees to be retained, particularly during the construction process.

9.        No fencing is permitted to be erected across the Park Road frontage of the site.

10.       No pathway/accessway is permitted through the site to Park Road.

11.       All external lighting is to be hooded and angled away from neighbouring properties.

12.       Security in the form of a cash bond or trading bank guarantee to the sum of $100,000 must be submitted,
          to secure performance of all conditions of this approval, prior to the issue of a Development Permit for
          operational works. The cash bond or trading bank guarantee will be returned on performance of the
          conditions of approval less any costs incurred by Council in respect of enforcing performance of this
          permit.




A o:\database\onestop\decision.doc

Page 4

NOOSA COUNCIL IDAS Development Application Decision Notice                                                          3


13.       The requirements of this development approval are to be satisfied, prior to the commencement of the use
          of the premises. Council reserves the right to call upon the bond or guaranteed sum referred to in this
          approval to effect compliance with conditions.

14.       The developer must obtain all of the other Development Permits referred to in the Decision Notice, prior to
          obtaining a Development Permit for building works.

15.       This Development Permit for a material change of use of premises lapses if:-

          15.1. the use or erection of a building or other structure associated with the use, has not been
                commenced by 12 August 2008, unless application is made and approved by Council for an
                extension; or

          15.2. the use of any premises pursuant to the Development Permit ceases.

Land Development
          Vehicle Access

16.       A vehicular access driveway to serve the site shall be constructed from Allambi Rise into the existing 4.0
          metres wide easement (referred to as Easement A on RP 177551).
          The driveway shall be designed and constructed to Council’s design standards and to grades that prevent
          vehicles from scraping and/or bottoming. Should any driveways be constructed to grades that do not
          comply with AS2890.1-1993, Council will require that the driveway be removed and reconstructed to
          levels that do comply.
          Carparking

17.       A minimum of 2 covered carpark spaces shall be provided in tandem arrangement within the 4.0 metres
          wide easement (Easement A on RP 177551). No vehicular or boat parking shall be allowed within the 6
          metres setback.
          Stormwater Drainage

18.       The stormwater drainage disposal via a fusion welded polyethylene pipe shall be discharged into the
          existing kerb line in Park Road generally in accordance with Drawing no S-OW.02 Issue C dated October
          2004 by Whaley Consulting Group. Detailed engineering plans with supporting calculation prepared by a
          Registered Professional Engineer shall be submitted to Council for approval prior to obtaining a
          Development Permit for Operational Works. The depth of the excavation for trench shall not exceed
          500mm, with a maximum width of 300mm and be on an alignment that ensures the damage to the existing
          vegetation and its root systems is kept to the absolute minimum. The excavated trench for the pipeline
          shall be backfilled and stabilised immediately by the excavated materials from the site. All excavation and
          backfilling works shall be carried out by hand and be supervised and certified by a geotechnical engineer.

          Encroachment over a Private Easement

19.       The applicant shall provide a legal document to allow the eave encroachment of the proposed house over
          easement B on RP 177551. Alternatively this encroachment shall be removed.
          Sewer Mains

20.       The site shall be connected to Council’s existing sewerage reticulation systems over Lot 64 RP 52918
          (No9 Allambi Rise) and be constructed in accordance with Council’s standards and requirements at no
          cost to Council. Design plans showing the detail of the pumping system and any civil works and/or
          excavation work associated with it shall be submitted for Council approval and an Operational Works
          Permit shall be obtained for the proposed sewerage works.
          Alternatively the site may be connected to the existing sewer main in Park Road generally in accordance
          with Drawing no S-OW.02 Issue C dated October 2004 by Whaley Consulting Group subject to the
          following requirements.:
          20.1      A new sewer main shall be constructed along the western boundary lines of Nos 10 and 12 Park
                    Road (Lots 54 and 55 RP 52918) and connected to the existing sewer manhole (NH01/02/13) in
                    Park Road at no cost to Council and to specifications and an alignment approved by Council’s
                    Water Sewerage Capitol Works Manager,




A o:\database\onestop\decision.doc

Page 5

NOOSA COUNCIL IDAS Development Application Decision Notice                                                           4


          20.2      The new sewer main shall be provided with connections to future dwelling on the adjoining
                    properties at 10 and 14 Park Road and written permission shall be obtained from the owners of
                    these properties if the new sewer main or any proposed sewer works are to be located within these
                    properties.
          20.3      The sewer connection between the dwelling on this property (No 12 Park Road) and the new sewer
                    main shall be constructed of fusion welded polyethylene pipe with the excavated trench for the
                    pipeline being backfilled and stabilised immediately by the excavated materials from the site. The
                    depth of the excavation shall not exceed 500mm, with a maximum width of 300mm and be on an
                    alignment that ensures the damage to the existing vegetation and its root systems is kept to the
                    absolute minimum. All excavation and backfilling works shall be carried out by hand and be
                    supervised and certified by a geotechnical engineer.
          20.3      The sewer connection and stormwater disposal shall be accommodated in a single trench to
                    minimise disturbance on the site.
          20.4      A Development Permit for Operational Works shall be required and all submitted plans shall be
                    prepared by a Registered Professional Engineer Queensland and certified by a Geotechnical
                    Engineer in relation to the impact of the works on the stability of the sand dune slope.
          Town Water Supply

21.       The site shall be connected to Council’s existing town water supply in Allambi Rise and be constructed in
          accordance with Council’s standards and requirements at no cost to Council. The new connection to the
          water reticulation system shall extend within the easement to the property boundary line of 9 Allambi Rise
          and be metered.
          Geotechnical Issues/Construction

22.       All construction works related to the proposed extension shall take into consideration the
          recommendations and findings of earlier geotechnical reports by Morrison Geotechnic regarding this site.

          A registered consulting geotechnical engineer shall supervise the excavation and the foundation works of
          the proposed extension works and certifies the stability of the structure and the existing dwelling upon the
          completion of the extension works. The excavation works shall only be carried out during dry weather
          conditions and if there is a risk of sand movement occurring, all work shall be suspended until such steps
          approved by the applicant’s Geotechnical engineer been taken to ensure that no further slippage will
          result. The certification of the completed works by the geotechnical engineer shall be submitted to Council
          to be placed on Council’s records.

23.       The disposal of sand, soil or any materials created by the construction of the dwellings shall be removed
          in accordance with the approved Construction Management Plan. Details of the method of this disposal
          of materials are to be submitted to Council at the Building Application stage. Not more than one vehicle at
          a particular time will be parked in Park Road and/or Hasting Street for the removal of, or the delivery of,
          materials associated with the site and no such vehicle shall remain overnight. No materials are permitted
          to be stored within the road reserve.

24.       A Construction Management Plan detailing the method and process of construction shall be prepared
          by the builder in consultation with the applicant’s consulting engineer (Whaley Consulting Engineers) and
          presented to Council for approval prior to issuing Operational Works Permit.

25.       A programme of works is to be submitted with any application for any Development Permit for Operational
          Works detailing the construction schedule and proposed environmental protection measures, which
          addresses stabilisation of disturbed areas and identifies any affected vegetation.

          Where the program is changed for any reason whatsoever, a copy of the revised program shall be
          submitted to Council’s Works Inspector within seven (7) days.

26.       A Traffic Management Plan for the Construction of the Dwelling addressing access to the site, the locating
          of equipment, carparking arrangements for workers on the site and any potential conflicts with local traffic
          shall be submitted and approved by Council prior to Development Permit for Operational Works. This
          report is to also address peak holiday periods with delivery of materials.

27.       Prior to obtaining a Building Permit the builder shall submit written acknowledgment that building works
          shall proceed in accordance with the 9 tonne load limit applicable to Park Road, unless varied by Council
          and that all works will be carried out in accordance with the approved Construction Management Plan.




A o:\database\onestop\decision.doc

Page 6

NOOSA COUNCIL IDAS Development Application Decision Notice                                                             5


28.       At the completion of construction the consulting geotechnical engineer will certify that all works were
          carried out in accordance with their recommendations and that all structures and the site are stable. A
          copy of this certification shall be submitted to Council to be placed on Council records.

29.       Existing Conditions Survey is to be carried out on adjoining buildings, structures and services prior to any
          construction works taking place on site. If distress already exists, a photographic survey shall be
          undertaken, the distress measured and a plan to monitor changes to distress shall be implemented. A
          copy of this report is to be submitted to Council within 5 business days of survey and prior to construction
          work proceeding.

30.       The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers, the use
          of vibrating installation techniques for sheet piling and other construction vibrations caused by excavating,
          earthmoving or demolition machinery or other similar construction techniques.
          Environment Management Plan

31.       An Environment Management Plan shall be prepared by the applicant’s consulting engineers (Whaley
          Consulting Engineers) in consultation with the builder and be made available for approval by Council prior
          to obtaining Operational Works Permit. The purpose of the plan is to safeguard the environmental
          integrity particularly the sand dune surface and the tree canopy. The plan shall also specify approximate
          time frame for completion of the construction works particularly in relation to length of time the tower crane
          will remain installed on site in this visually prominent location.
          Erosion and Sediment Control

32.       Any person acting on this permit shall prevent erosion and sediment export from leaving the site. Site
          control measures such as silt fencing, straw bales, controlled gravel access to the site and controlled
          disposal of waste, as deemed necessary.
          In this regard plans detailing the methods of controlling erosion and sediment are required to be submitted
          to the Council for approval prior to obtaining a Development Permit for Operational Works.
          Contributions

33.       Coastal Major Road Network Contributions of an amount of $2,442 in accordance with Planning Schedule
          Policy PSP42 shall be payed by the applicant prior to issuing a Development Permit for Operational
          Works.

34.       Coastal Major Pathway Contributions of an amount of $238 in accordance with Planning Schedule Policy
          PSP41 shall be payed by the applicant prior to issuing a Development Permit for Operational Works.
          General

35.       Any damage caused to any public utility or roads caused by the construction of this development shall be
          repaired to Council’s standards and at no cost to Council.

36.       Any alteration of any public utility or other facilities necessitated by the development of the land or
          associated construction works external to the site shall be at no cost to Council.

37.       The transportation of all materials to and from the site shall be undertaken in a manner such that no
          particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall
          be covered to prevent materials including dust being windblown from the vehicle.

Building

38.       A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged
          with Council at completion of the work confirming compliance with the maximum building height above
          natural surface, required by the provisions of the Planning Scheme.

39.       The Geotechnical report submitted as part of your application has been appraised and approved subject
          to the following conditions:-

          39.1. There is to be no uncontrolled discharge of water onto the slope;




A o:\database\onestop\decision.doc

Page 7

NOOSA COUNCIL IDAS Development Application Decision Notice                                                             6


          39.2. Stripping of vegetation for construction purposes should be minimised. If vegetation is destroyed it
                should be reinstated immediately after construction is completed;

          39.3. Additional load due to fill, construction equipment or stockpiled materials should not be located on
                the dune slope;

          39.4. The use of vibratory equipment of any kind is not permitted to be used, including vibrating rollers,
                the use of vibrating installation techniques for sheet piling and other construction vibrations caused
                by excavating, earthmoving or demolition machinery or other similar construction techniques;

          39.5. All construction works on site shall generally accord with the Building Construction Reports
                prepared by Whaley Consulting Group dated December 2002 subject to amendments required by
                condition 22, and 12 March 2004, together with the Morrison Geotechnic reports dated 1/9/00,
                25/5/01 and 24/3/04, with further details of the proposed crane construction method submitted for
                approval with the application for Operational Works. Particular attention shall be paid to the advice
                contained in Section 6 of the Morrison Geotechnic report of 24/3/04 in the event of changed site or
                construction conditions.

          39.6. A condition survey is to be carried out of adjoining buildings, structures and services prior to any
                demolition works or construction works taking place on site. If distress already exists, a
                photographic survey shall be undertaken, the distress measured and a plan to monitor changes to
                distress shall be implemented. A copy of this report is to be submitted to Council within 5 business
                days of survey and prior to construction work proceeding;

          39.7. Copies of all inspection reports by engineers are to be submitted to Council within 5 business days
                of the inspection taking place;

          39.8. A RPEQ is to be engaged by the client to oversee the piling works and copies of all inspection
                reports are to be submitted to Council within 5 business days of the inspection taking place;

          39.9. The applicant’s Geotechnical engineer will be required to be on site for the whole of the time during
                any excavation. The construction of the whole of the foundations is to be supervised and directed
                on site by a consulting Geotechnical engineer. No work of any such kind relating to the
                foundations shall be carried out if he is not on the site and supervising and directing this work.
                Such works shall only be carried out during dry weather conditions and if there is a risk of sand
                movement occurring, all work shall be suspended until such steps, approved by the applicant’s
                Geotechnical engineer and the Council’s Building Surveyor, have been taken to ensure that no
                further slippage will result.

          39.10. The builder, landscaper and all workers associated with construction of the works shall, at all
                 times, comply with the directions of the consulting geotechnical engineer.

40.       There shall be no direct access from the dwelling to the pool. The pool shall be enclosed by an isolation
          fence complying with Section 12U of the Building Act.

41.       The proposed tandem carport is not to discharge water onto any adjoining property. All roof water is to be
          piped to the stormwater discharge system for the dwelling.

42.       Deleted.

43.       Prior to a Development Permit for Building Work being granted for the construction of the dwelling, the
          applicant shall provide Council with written indemnification against any future claims from the
          applicant/owner of Lot 54, his successors or assigns resulting from any future damage to the dwelling or
          other structures arising from their proximity to the trees that are required to be retained on the property as
          a condition of granting the MCU for this development.
Additional Condition (09/08/2006)

44.       The stormwater disposal and sewer connection shall be undertaken in accordance with the Arborist’s
          Advice Report prepared by John Mullholland & Associates and dated March 2006 and the following
          requirements:
          44.1.       The route for the service trench shall be a minimum of 1.5 metres clear of all trees and shrubs,
                      unless otherwise agreed to by the Manager, Land Use.




A o:\database\onestop\decision.doc

Page 8

NOOSA COUNCIL IDAS Development Application Decision Notice                                                               7


          44.2.       An arborist shall be on site all times supervising the works being undertaken.
          44.3.       Prior to commencing any works, the route for the service trench shall be pegged and inspected
                      by Council.
          44.4.       Prior to excavation existing mulch/leaf cover material over proposed trench shall be raked back
                      and stockpiled for covering of trench area after completion.
          44.5.       Works shall be undertaken in a progressive manner and route reinstated as works progress.
          44.6.       Uphill anchor roots of trees shall not be disturbed.
          44.7.       All works shall be carried out by hand excavation other then the sewer trench under existing road
                      pavement.
          44.8.       All excavated material shall be placed on a ‘tarpaulin’ or the like laid immediately adjacent to the
                      proposed trench.
          44.9.       Excavated material shall be used as bedding and backfilling of trench.
          44.10.      Where works disturb the understorey vegetation, rehabilitation works shall be undertaken to the
                      reasonable satisfaction of Manager, Land Use.
Additional Land Development Conditions (27/09/07)

45.       “Prior to the commencement of the proposed building extensions, a registered geotechnical engineer shall
          certify the design and the construction methods of the foundations taking into consideration the depth and
          the details of the foundations of the existing house and identifying any necessary measures required to
          protect the stability of the house and the sand dune during the construction phase.”

46.       “The proposed extension works shall be carried out in a manner that does not impact on the existing trees
          and the vegetation cover.”




A o:\database\onestop\decision.doc

Page 9

NOOSA COUNCIL IDAS Development Application Decision Notice                                                             8



                                           Local Laws, Policies & State Regulation
                                           Requirements
                                           INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


                                                          ADVICE
1.        It is recommended that a duly signed agreement between the owners of Lots 54 and 65, be registered
          with the Department of Natural Resources as an addendum to the easement document, binding the owner
          of Lot 64, his successors or assigns, to allowing construction and retention of the proposed carport within
          the easement over Lot 64. Note that without a registered addendum to the easement document there is
          potential for a problem with the existing easement document that must be considered by the owners.

2.        The property is indicated as being in a landslide hazard area, as per The Noosa Plan.
          If any of the following listed items below are relevant to the proposed building works then a site specific
          geotechnical report will be required:-
          a.        involves the removal of vegetation other than grass from use areas; or
          b.        involves excavating or filling of more than 50m3 of material (other than placement of top soil not
                    exceeding 100mm in depth); or
          c.        involves cut or fill with a vertical depth of more than 1.5 metres relative to ground level; or
          d.        redirects or impedes water flows in an existing watercourse or stormwater drain.
          The site specific geotechnical report is to be prepared by a registered professional engineer and must
          either certify that the site is not at risk from landslip emanating from the site or from other land, or
          identifies methods of stabilising all buildings, access ways and use areas.
3.        A site specific geotechnical report will be required, prior to the Private Certifier being able to issue a
          Development Permit for building works
4.        The site has been identified as being in a “Designated Bushfire Prone Area”, accordingly the BCA
          provisions for bushfire construction may apply.




A o:\database\onestop\decision.doc

Page 10

NOOSA COUNCIL IDAS Development Application Decision Notice                                                                          9




                                                      Appeal Rights
                                                      INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION

     The following is an extract from the Integrated                            (5) If an application is processed under section
     Planning Act (Chapter 4).                                              6.1.28(2), appeal rights for submitters for the
                                                                            application are available only for the aspects of the
     Division 8 - Appeals to                   court      relating     to   development that would have required public
     development applications                                               notification under the repealed Act.
     Appeals by applicants                                                     (6) If an application involves assessment against
     4.1.27.(1) An applicant for a development application                  a concurrence agency code, appeal rights for
     may appeal to the court against any of the following-                  submitters for the application are not available
                                                                            against the part of the approval that represents the
     (a) the refusal, or the refusal                 in   part,   of   a    concurrence agency’s response for the code.
         development application;
                                                                            Appeals by advice agency submitters
     (b) a matter stated in a development approval,
         including any condition applying to the                            4.1.29.(1) An advice agency may, within the limits of
         development, and the identification of a code                      its jurisdiction, appeal to the court about the giving of
         under section 3.1.6;1                                              a development approval for a development
                                                                            application if-
     (c) the decision to give a preliminary approval when a
         development permit was applied for;                                (a) the development application involves impact
                                                                                assessment; and
     (d) the length of a currency period;
                                                                            (b) the advice agency told the applicant and the
     (e) a deemed refusal.                                                      assessment manager to treat its response to the
                                                                                application as a submission for an appeal.
        (2) An appeal under subsection (1)(a) to (d) must
     be started within 20 business days (the “applicant’s                      (2) The appeal must be started within 20 business
     appeal period”) after the day the decision notice or                   days after the day the decision notice or negotiated
     negotiated decision notice is given to the applicant.                  decision notice is given to the advice agency as a
                                                                            submitter.
         (3) An appeal under subsection (1)(e) may be
     started at any time after the last day a decision on the               Appeals for matters arising after approval given
     matter should have been made.                                          (co-respondents)
     Appeals by submitters                                                  4.1.30.(1) For a development approval given for a
                                                                            development application, a person to whom any of
     4.1.28.(1) A submitter for a development application
                                                                            the following notices have been given may appeal to
     may appeal to the court about-
                                                                            the court against the decision in the notice-
     (a) the giving of a development approval, including
                                                                            (a) a notice giving a decision on a request for
         any conditions (or lack of conditions) or other
                                                                                extension of the currency period for an approval;
         provisions of the approval; or
                                                                            (b) a notice giving a decision on a request to make a
     (b) the length of a currency period for the approval.
                                                                                minor change to an approval.
         (2) The appeal must be started within 20 business
                                                                                (2) The appeal must be started within 20 business
     days (the “submitters appeal period”) after the day                    days after the day the notice of the decision is given
     the decision notice or negotiated decision notice is                   to the person.
     given to the submitter.
                                                                                  (3) Subsection (1)(a) does not apply if the
        (3) If a person withdraws a submission before the                   approval resulted from a development application
     application is decided, the person may not appeal the                  (superseded planning scheme) that was assessed as
     decision.                                                              if it were an application under a superseded planning
        (4) If an application involves both impact                          scheme.
     assessment and code assessment, appeal rights for                         (4) Also, a person who has made a request
     submitters are available only for the part of the                      mentioned in subsection (1) may appeal to the court
     application involving impact assessment.                               against a deemed refusal of the request.
                                                                                (5) An appeal under subsection (4) may be
                                                                            started at any time after the last day the decision on
                                                                            the matter should have been made.


     1
          Section 3.1.6 (Preliminary approval may override local planning
         instrument)



A o:\database\onestop\decision.doc                                                      5/10/07

Page 11

NOOSA COUNCIL IDAS Development Application Decision Notice                 10


Division 9 - Appeals to court about other matters
Appeals for matters arising after approval given
(no co-respondents)
4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
    or cancel a condition of a development approval.
(b) a notice under section 6.1.442 giving a decision to
    change or cancel a condition of a development
    approval.
    (2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
   (3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
    (4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
    (2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.




2
     Section 6.1.44 (Conditions may be changed or cancelled by
    assessment manager or concurrence agency in certain
    circumstances)




A o:\database\onestop\decision.doc                               5/10/07

Used in these records

About this file

File size
53 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

23643 DA COMPILED Decision Notice [As Published].pdf · 53 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.