Council archive · source document
Development Application Part 2 of 2 Report/ Plans - MCU12/0047
Plans and drawings: the text below has words only, no drawings.
Very large file (43.4 MB): may take a few minutes to open.
Original PDF page 59, section 1. The text section number identifies this passage in the reader.
111111 Integrated Development Assessment System Checklist
Material Change of Use - IDAS Checklist Part 2
(Sustainable Planning Act 2009 version 1.0 effective 18 December 2009)
This checklist only applies when the development application seeks approval for a material change of use of premises.
You are not required to complete this checklist as part of your development application, however you may submit the
checklist with your application if you wish. The purpose of the checklist is to assist you in identifying:
whether you need to make a development application for the proposed development
if a development application is required, the relevant IDAS forms you need to complete as part of your
application, and
whether you need to give a copy of your application to any referral agencies.
Before completing this checklist, it is recommended that you complete Development Assessment Checklist -
IDAS
checklist part 1. If your development involves reconfiguring a lot or operational works, it is recommended that you also
complete Reconfiguring a lot IDAS checklist 3 and Operational works IDAS checklist 4, as applicable.
- -
If you are unsure how to answer any questions on this checklist, phone or visit your local government, or go to the
Department of Infrastructure and Planning’s website at www.dip.qld.gov.au
All terms used in this checklist have the meaning given in the Sustainable Planning Act 2009 or the Sustainable
Planning Regulation 2009.
Ipart 1 - General questions
1.1 Is the proposed use assessable development under the planning scheme?
DNo
. You must complete Material change of use assessable against a planning scheme -
IDAS form 5
IZI Yes . Continue on to question 1.3
1.3 Is any part of the land part of a future state-controlled road or within 100 metres of a State-controlled road?
IZI No
. If your application is assessable development under a planning scheme, the Department of
Transport and Main Roads is a concurrence agency for your application. You must give a copy of
DYes the application to the Department of Transport and Main Roads.
. It is recommended that you complete part 2 of this checklist
1.4 Does State Planning Policy 2/02: Planning and Managing Development Involving Acid Sulfate Soils apply to
the development?
IZINo
DYes . It is recommended that you complete part 3 of this checklist
1.5 Is any part of the premises located in a coastal management district?
IZI No
DYes . It is recommended that you complete part 4 of this checklist
Department of Infrastructure and Planning QPlan ...t:~~\j Queensland
"\tv’ Government
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Report/ Plans - MCU12/0047Related documentApplication case desk ↗
About this file
- File size
- 43.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.