Information Request 132008 176 05
Issue – Acid Sulfate Soils Management
Council have identified that the proposed development is encumbered by Council’s Acid
Sulfate Soils hazard overlay. The submitted documentation does not include an Acid Sulfate
Management Plan or make reference to a Dewatering Plan.
Information Required
32. Demonstrates through a geotechnical report, if the proposed development triggers
assessment against the Acid Sulfate Soils Overlay Code of The Noosa Plan 2020. If
assessment is required, provide a site specific Acid Sulfate Soils Management Plan. The
Acid Sulfate Soils Management Plan must be prepared by a suitably qualified person
(RPEQ – Registered Professional Engineer of Queensland).
33. Demonstrate through a geotechnical report, that the proposed development will not
encounter water during excavations. If the proposed development is likely to encounter
water during excavation, provide a Dewatering Plan demonstrating how Acid Sulfate
affected water encountered during excavation will be treated and disposed of. The
Dewater Plan must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland).
Issue – Erosion and Sediment Control
The proposed development will alter the existing drainage conditions of the site during
construction. Council is concerned how sediment leaving the site will be controlled and treated
and how erosion of the site and neighbouring properties will be managed.
Information Request
34. Provide a Sediment and Erosion Control plan that demonstrates how the site will control
contaminates leaving the site without causing erosion damage to the site and
neighbouring properties. The plan must be prepared by a suitably qualified person
(RPEQ – Registered Professional Engineer of Queensland) and include, but not be
limited to:
a. a Maintenance Plan that includes:
i. maintenance timeframes
ii. quantitative or qualitative method of assessing the functionality of each
measure
iii. review of overall measures
b. Demonstrate how water collected on site will be treated before being leaving the site
(bio-basin, etc.).
3. DUE DATE FOR RESPONSE TO INFORMATION REQUEST
The due date for providing the requested information is 2 March 2022. Email your response
to [email protected]. Please advise Council of your response to this information request
in accordance with section 13 of the Development Assessment Rules.
If you do not provide a response before the due date, it will be taken as if you have decided
not to respond to the information request and Council will continue with the assessment of
your application.
4. OTHER DETAILS
You can follow the progress of this application online at www.noosa.qld.gov.au. The “Online
Services” page can be accessed via "Quick Links" on the left hand side of the screen.
Page 10 of 11
Document Set ID: 22193361
Version: 3, Version Date: 02/12/2022