Original source · versioned page text
1225 Stage 4 bulk ewks explanation
Attached to the e-mail OPW16/0007 - Notice of not properly made application.
Callaghan & Toth Consulting Engineers Pty Ltd ABN No. 45140292324 8/41 Sunshine Beach Road Noosa Junction P.O Box 2305 Noosa Heads 4567 Callagh an & Toth www.callaghanandtoth.com.au soe : : : Ph: 07 5474 9081 Fax: 07 54749041 Civil, Environmental & Hydraulic Engineers = 18" February 2016 File No: 1225 Noosa Council Attention: Mark Lewis (by email) Dear Sir, RE: OPERATIONAL WORKS APPLICATION (BULK EARTHWORKS) FOR Elm Street, and 61 Lake Macdonald Drive, COOROY (Lot 135 MCH 978 & Lot 5 SP 266731) REC13/0148, MCU13/0226, OPW16/0007 We are responding to the ‘Not Properly Made’ letter dated 10-2-16 for Operational Works Bulk Earthworks approval at 154 Elm Street, Cooroy. We understand there are two issues: fee is not acceptable, and Council query need for Bulk Earthworks and clearing prior to finalization of subdivision. Historical background of Erindale Park Subdivision: Stages 1 (4 lots), 2 (3 lots), and 5/6 (9 lots) have been completed separately over the last two years, Stage 1 construction started in August 2013. One owner purchased the land some time ago and has continued to develop the property. We have approval for Stage 3 Operational Works which is planned to start construction in April this year. Main reasons why Stage 4 needs bulk earthworks prior to completion of subdivision: Stage 3 construction requires 2600 cubic metres of imported fill (in addition to cut-fill on site). This is required to obtain flood freeboard in accordance with flood study. Cost to import this amount of fill is approximately $104,000 (estimated $40/cum), cost to cut from Stage 4 and cart a small distance to fill estimated as $65,000 (at $25/cum). The cost difference to import fill is therefore $39,000. Importing 2600 cum of fill using truck and dog at 20cum/load requires 130 return trips to the site on Council roads. This is not desirable for roads or local residents. The soil can be moved onsite using dump trucks without using Council roads which is far less impact on community. Stage 3 has approximately 3800 cubic metres of excess topsoil, tests show a topsoil depth of 200-400mm which has been encountered on other Stages. Stage 4 is an old TMR quarry and has a lack of topsoil, so it is planned to take topsoil from adjacent Stage 3 to Stage 4. Again it is better for cost and roads/community if the transport of material is kept between the two sites. X:WOBSICT Projects in progress\1225 30 lots lake MacDonald Drive\Correspondencelstage 3 & 4\1225 Stage 4 bulk ewks explanation.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.