2103 19 Key Ct - Noosa OPW application with plans
Attached to the e-mail Operational Works Application OPW21/0187 - DA Form 1 - Plans - Arbourist Report - 19 Key Ct Noosa Heads.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Callaghan & Toth
Civil, Environmental &
Hydraulic Engineers
EROSION & SEDIMENT CONTROL LEGEND.
DANGER !!
HIGH VOLTAGE The following Construction Site Conditions and their suggested
UNDERGROUND
method of control should be used in conjunction with the
SW
ELECTRIC CABLES
following documents:
energex GL1.96
"Erosion and Sediment Control Manual (V1.2)" Ø
375
GL1.95
Ø 300
GL2.01 Ø 300
"Contract Standards for Erosion and Sediment Control",
LL 2.09
IL0
.85
NS2.28
FS2.30
W
and the Pocket Guide (Nov. 2009)
H
E 2
NS2.30
625m²
Urban Erosion and Sediment Control for Waterway Health
NS2.37
CAUTION !!
NS2.25
EJ FS2.65
WM
NS2.30
NS2.20
FS2.65
NS2.30
NS2.20
UNDERGROUND Protection, available on SCC web site. BM: Screw in Kerb
RL: 2.13
FS2.30
NS2.30
NS2.25
7
LL2.18
1.9
FS2.30 FS1.93
SEWER/WATER 1
NS2.30
IL0
.71
GL1.97 643m²
House
GL1.93 partly demolished
Ø
300
CAUTION !!
UNDERGROUND
TELSTRA CABLE
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.