Integrated Planning Act 1997
_ Early Concurrence Agency Response
This notice is issued by the Department of Environment and Resource Management pursuant to Sections 3.3.2, 3.3.16
and 3.3.18 of the integrated Planning Act 1997 to advise of a decision or action.
- (eel > :
Mr Thomas Offerman A \CCogR Chief Executive ‘Officer? , et
C/o The Jetty Specialist RECEIV ED \ Stinshine Coast Regional Council
2 Industrial Avenue Locked Bag 72
CALOUNDRA QLD 4551 | ‘28 MAY 2009 SCMC QLD 4560
- SscRC
Nambour Our reference: SE981AP2861; MCY2119
Attention: Mr Steve Belt — TH
Re: Request for early concurte 2 ponse .
Dear Mr Belt |
The Department of Environment and Resource Management (DERM), wishes to advise that the request for
- early concurrence agency response, received on 20 March 2009, has been assessed, and on 27 May 2009
a decision was made to issue a response for consideration of the assessment manager when the application
becomes properly made. ,
_ 1. Property/Location: .
- Street Address 96 to 98 Hilton Terrace
NOOSAVILLE QLD 4566
| LovPlan Lot 6 Plan SP116708 . ,
2. Details of the recommendation
. . Aspect of a EPA Decision
; ndation
Prescribed Tidal Work being Early Concurrence
for removal of the existing Response for Granted in full with _ 1PCC01428009
timber jetty and construction Operational Work conditions
of a new timber jetty perational Wvo
~ Page 1 of 2 + AF080109
Department of Environment and Resource Management
www.derm.qid.gov.au ABN 87 221 158 786See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 sections
Section 2
ecoaccess 4 7 ong
environmental licences and permits . , :
1 Notice
a Early Concurrence Agency Response
3. Currency period CG
This approval will lapse unless substantially started within the currency period/s set by the Assessment
Manager OR the standard currency periods stated in section 3.5.21 of the Integrated Planning Act
1997 applying to each aspect of development in this approval AND/OR the following-currency periods
applying to aspects of development in this approval.
This approval will lapse unless substantially started within two years. .
. 4. The approved plans
, The approved plans and/or documents for this approval are: ‘
PlaiiDaéumént NO." | >> ~Plan/Ddcumient Name
JSP-SJ-21810 PLAN LAYOUT & ELEVATION _ Revision B dated 2/03/09
J §P-S 5-218 — | SITE-PLAN-GENERALLAY.OQUT: & Issue A dated-24/2/09_________}
WATER ALLOCATION
5. Codes for self-assessable development oo,
Any self-assessable development for an environmentally relevant activity conducted in conjunction .
with this approval, must comply with the relevant code of environmental compliance.
_ 6. Assessment Manager Responsibilities
Please note that it is a requirement under Sections 3.5.15 and 3.5.17 of the Integrated Planning Act 1997
that a copy of the final Decision Notice (which includes DERM’s concurrence response) for this application
issued by the Sunshine Coast Regional Council, be forwarded to each referral agency. Therefore could you
please send a signed hardcopy to DERM'’s Ecoaccess Customer Service Unit, PO Box 15155 CITY EAST
_ 4002 and an electronic copy to [email protected] addition, the State’s Native Title Work Procedures indicate that responsibility for assessment of native title
issues for an IDAS application rest with the Assessment Manager. Therefore in this instance, DERM has not
provided a notification to native:title parties: ooo Oot Pe at
If you require more information, please contact Louise Pinn, the Project Manager, on the telephone number
listed below. ; ,
Yours sincerely . a
Enquiries:
‘ ES - Reg Serv - Bne North - Sunshine Coast -
DERM
Ben Sale PO Box 168 .
Delegate ; COTTON TREE QLD 4558
Environmental Services . Phone: (07) 5459 6132 ..
Department of Environment and Resource Management Fay: (07) 5443 9927
27 May 2009 -
Page 2 of 2 * AF080109 -Department of Environment and Resource ManagementSection 3
‘ne re Saad te a ar Ce ee a ee ok . .
ees Ef ge eee ere
eases : eg Zi are RTE REL ENY ww ke
ea (gee ie
Sra’ -) es ICCC Ee: Ape pape S:
kt } cad A es Dee Pe poe Sgt os .
ett nt ee OS fee RE ne pee
eX MOP OtALicetces end pernitsi S38 =, .
ance Lae Ts Vow, Te we Sections. 3.3.2; 3:3.16 and 3.3.18 Integrated Planning Act 1997
Re ee :
eS a a ee
DERM Permit! number: IPCC01428009
DERM Permit’ number: IPCCO01428009
Assessment Manager reference: NIA
Applicant: Thomas Offermann ‘
Date application received by DERM: 20 March 2009
7 }Permit' Type: . Early Condurretice Réspinse for Operational Work’ -
Date of Decision: 27 May 2009 ;
Decision: _ Granted in full with conditions |
Relevant Laws and Policies: Coastal Protection and Management Act 1995 and any ~
subordinate legislation
Jurisdiction: Item 9 in Table 2 of Schedule 2 of the Integrated Planning
Regulation 7998
Development Description .
Property == —=—=Ss*SCikwPlan_———_—_—_—_—_ [Aspect of Development
96 to 98 Hilton Terrace Prescribed Tidal Work being for removal of the
NOOSAVILLE QLD 4566 Lot 6 Plan SP116708 existing timber jetty and construction of a new
. timber jetty
Reasons for inclusion of development conditions .
In accordance with section 3.3.18(8) of the Integrated Planning Act 1997 and section 27B of the Acts
Interpretation Act 1954, the reasons for the inclusion of development conditions are: .
- ta ee . . : “3 ao eee pet BR age s:
“The Department of Environment and’ Resource Management (DERM) is & Goncurréricé’ agency ‘under the
Integrated Planning Regulation 1998 for coastal management under the Coastal Protection and Management
Act 1995, excluding amenity or aesthetic significance or value.
Additional information for applicants Oy
The standard currency periods stated in section 3.5.21 of the Integrated Planning Act 1997 or the nominated
currency period, apply to each aspect of development in this permit’. For information on when this permit’ takes
effect and the relevant currency periods, please see point 3 in the Early Concurrence Agency Response Notice. __
* Permit includes licences, approvals, permits, authorisations, certificates, sanctions or equivalent/similar as
required by legislation administered by the Department of Environment and Resource Management.
Page 1 of 4 ‘ -
7 Department of Environment and Resource Management Q aueenstanacovernmen
www.derm.qid.gov.au ABN 87 221 158 786 - Queensland Parks and Wildilfe ServiceSection 4
pon
| DERM Permit number: IPCC01428009 -~=.
Contaminated Land | .
it is a requirement of the Environmental Protection Act 1994 that if an owner or occupier of land becomes aware
a Notifiable Activity (as defined by Schedule 2 of the Environmental Protection Act 1994) is being carried out on
, the land or that the land has been affected by a hazardous contaminant, they must, within 30 days after
becoming so aware, give notice to the Department of Environment and Resource Management. ;
Ben Saie oe
Delegate i
Environmental Services 1 ;
Department of Environment and Resource Management
27 May 2009 . j oe ge, - sae, . a
Page 2 of 4 Department of Environment and Resource ManagementSection 5
oO 7 v
~~ * ; . DERM Permit number: IPCC01428009
General Permit Condition
Agency Interest: Coastal
1 ' All works are to be constructed in accordance with the attached approved drawings and specifications
listed in the approved plans section in the notice attached to this permit.
2 The chief executive administering the Coasta/ Protection and Management Act 1995 may order the
works to be removed or modified, within a reasonable time, if the works have or are likely to have a
significant effect on coastal management because the works:
7 (a) create a navigation hazard or other danger to the public; or
(b) cause erosion or land degradation; or - ‘ a
. ' (c) are unstable or have not been constructed according to the approved plans. .- Loe
3 All reasonable and practicable measures must be taken to prevent pollution of watercourses or
_ Stormwater systems as a resuit of silt run-off, oil and grease spills from machinery, concrete truck
’~ washout and alike. Concrete agitator wash out must only be conducted in a specified area to facilitate
. the removal of waste concrete from the area to landfill. Wastewater from cleaning equipment must not
. be discharged directly or in-directly to any watercourses or stormwater systems.
Agency Interest: Water |
4 _ There is to be no visible sediment plume greater than 30 metres from the proposed structure. Ifa
visible plume exists 30 metres from the proposed structure, works must immediately cease and a
sediment curtain must be positioned around the plume until it has settled and is no longer visible.
Page 30f4. ‘ ‘ Department of Environment and Resource ManagementSection 6
‘ : roo
DERM Permit number: IPCC01428009° ~.
SSS NEE Eee EEO eee
DEFINITIONS
Words and phrases used throughout this permit' are defined below. Where a definition for a term used in this
permit' is sought and the term is not defined within this permit’ the definitions provided in the relevant legislation
shall be used.
"approval" means ‘notice of development application decision’ or ‘notice of concurrence agency response’
under the integrated Planning Act 1997.
“approved plans" means the plans and documents listed in the approved plans section in the notice attached
to this development approval.
“Department of Environment and Resource Management” means the department or agency (whatever
called) administering the Coastal Protection and Management Act 1995 or the Environmental Protection Act
1994.. :
“land™ in the "land schedule" of this document means land excluding waters and the atmosphere. -
"site" means lard or tidal waters on or in which it is proposed to carry out the development approved under this -
development approval.
“watercourse” means a river, creek or stream in which water flows permanently or intermittently-
ina natural channel, whether artificially improved or not; or
« in an artificial channel that has changed the course of the watercourse> ———_—-———_—______--__.___
“waters” includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined
water natural or artificial watercourse, bed and bank of any waters, dams, non-tida! or tidal waters (including the
sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part-
- thereof. ,
“works” or “operation” means the development approved under this development approval. .
“you" means the holder of this development approval or owner / occupier of the land which is the subject of
this development approval.
Page 4 of 4 Department of Environment and Resource ManagementUsed in these records
001ABA99.001.pdfRelated documentPublic source context ↗
Early Referral Agency Response - DERM [As Published]Related documentApplication case desk ↗
About this file
- File size
- 280 KB (small file)
- File type
No other editions are linked here.