Council archive · source document
Request to extend relevant period 132003.221199.3
Very large file (37.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
-8-
29.2. how the performance targets are to be achieved;
29.3. when the performance targets will be satisfied:
29.4. how performance will be monitored;
.
29.5. corrective actions and contingency measures to be undertaken;
29.6: reporting arrangements (including monthly reports to CounCil during cansbuctlon);
.
.
29.7. auditing arrangements;
29.8. how the requirements ate to be incorporsted Cnto constructibn and works contracts;
29.9. how the developers employses, contractons and the contractor’s employees will be
’Informed and lrained with respect to ttut environmental protection requirements; and
29.1 P.enforcement.
30. The Environmental Management Plan shall apply to an WOIks and activities on all areas of the
site andadjaoent road rese~.
31. In particular, but without limitation, the Environmental Management Plan shall address the
following Issues In relation to the construction and operational phases of the development
31.1. legislative campHanee;
31.2. vegeta.tIon prote<:tion;
31.3. fauna and fauna habitat protection;
31.4. weed control;
31.5. pest control;
31.5. son erosion and sediment contro~
31.1. waterquaity protection;
31.8. groundwater protection;
31.9. air quality protection;
31’.10.storage’and handling of f’!aZan:lous aubatances;
31.11.nolse and vibration management;
31.12..weste management;
31.13.cuHural heritage management
31.14.visual amenity protection;
31.15.bushflre control;
31.16.envif’Qr1rna11a1 emergencies: and
31.17.communlty liaison.
32. The Envirorvnenlal Management Plan shall incorporate the requirement tor monthl
environmental compliance monitoring and audit reports to be submitted to Ccuncil for the
constNctionstages of the development. The format and content of these reportS shall be In
herd .copy and digital form,generally In accordance with the following: .
32.1. Include tables of the monitoring results (digital form shOuld be In Excel).
32.2. Include individual charts plottlng the resulll for al parameters required in ,the monitoring.
32.3. Include a brief written discussion of the results and recommend ...y necessary actions..
33. The Applicant and all future owners of the sle shall comply with the relevant components oIlhe
EnvlronmentaI Management Plan. ThIs ,requirement will be Included ~ the Community
Management Statement for the units Ilnd the LOdge.
Ecglogical Restoration Plan and Specifications
’34. Prior to preparation of an Ecological Restoration Plan a quantitative survey shall be un ertaken
to identify the vegetative dynamics of the site.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to extend relevant period 132003.221199.3Related documentApplication case desk ↗
About this file
- File size
- 37.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.