Skip to the record
Beware of cheap imitations.

Council archive · source document

Request to extend relevant period 132003.221199.3

of 53

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

                                                  -12   -




                 59.2.8.    cflSsoIYed oxygen.
                                                                     water quality monitoring ahaII be
          59.3. During the establishment and operation phases,
                undertak8n every  third month and monitoring after significant rainfall events (at least two
                                                                                              .




                   year) shall be undertaken for:
                 per
                 59.3.1.    tC?tal nitrog n,
                 59.3.2.    total phosphorous.

                 59.3.3.    suspended solids ~ta.bldity,
                 Sg.3.4.    pH,
                 59.3.5.    salinity,
                 59.3.6.    temperature,
                 59.3.7.    dissolved oxygen,

                 59.3.8.    trash and groat pollutants, and

                 59.3.9.    f8eca1 coIiforms.
                                                                                 for ape od of 3 years from
          59.4. The applicant shell coirtinue this water quality monitoring         .




                completion of the final stage of construction.
                                                                                                    the build-
                 In addition. the applicant shall undertake inspections fOt erosion and deposition,
                     of trash and         pollutants, and other water  pollution.  Th se  inspections win be
                 up                gross
                                                                                              for a period of 3
                 C21rried out every third month .swell as after slgnific;ant rainfall events.     .




                 years from completion of !hefinal stage Of con$’UetiOn.
                                                                      Plan sha be prepared to the
          59.5. An operational phase water Quality Management
                                                                                                 water
                reasonable satJafactlon of Coundl and address water quality performance targets,
                treatment deVfcea. water quality maintenance..requirements for stormwater’ management
                                                                                               d water
                measures and devlcea. The plan shall demonstrate compUsnce w\tt1 the prescrf
                 qu.fity objeetives.
                                                                                                      Plan shall be
          59.6. Responsibilities under the Stormwa.lBr and Water Quality Management
                ctear1y delineated.
                .




                                                                             will trigger the implementation of
          59.7. Non-compliance with prescribed water quality standard.                    .




                measures to redify the probJem(s).

60.       Reports on monitoring, Inc~ts, corrective
                                                         action and pliI!’ updatea shall be submitted to
          Council every month during construction ~Council being
                                                                       notified if any incident is recorded.
          These reports. shaU Indude Information   coIleded during the monthly monitoring program, shall
                        non-standard   results. and be submitted  in a form acceP\8ble to Council. The
          highlight any
          format and content of these reports shall be In hard copy
                                                                           and digital form, generaNy In.
                      with the following:
          a~anC8
          .50.1. Including tables of the monitoring results (dlgitaf form should be In Excel):
                                                                     all parameters required In the monitoring
          60.2. Include Individual charts plotting the results for
                (digital form .should be In Ex); and
                                                                  and recommend any necnsary actions.
          60.3~ include a brief written dlscusalon of the resutta
                                                                             these reports shan continue
          After completion of the construdion slge of the development,
      .




                                               of two (2)yea~.
          every three (3)months.for a period

Wafer Quality Devices        .




                                                                             rcfance wMh the Stonnwaler and
81.       Water quality control devices shall be I.nlta/Ied generally In acx:
          Waw Quality Management Plan. Detaled staging plans
                                                                          and  specifICations, ball8d on ...d
                                                                                                         with
                    In accordance   With th_ Plan .ha~ be prepared and submitted (after consultation
          generally                                                              works.
          officersof the          with the relevant appllc8tions
                           Council)                              for operational




                                                                                                                      +

Used in these records

About this file

File size
37.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Request to extend relevant period 132003.221199.3.pdf · 37.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.