Council archive · source document
Request to extend relevant period 132003.221199.3
Very large file (37.3 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
-12 -
59.2.8. cflSsoIYed oxygen.
water quality monitoring ahaII be
59.3. During the establishment and operation phases,
undertak8n every third month and monitoring after significant rainfall events (at least two
.
year) shall be undertaken for:
per
59.3.1. tC?tal nitrog n,
59.3.2. total phosphorous.
59.3.3. suspended solids ~ta.bldity,
Sg.3.4. pH,
59.3.5. salinity,
59.3.6. temperature,
59.3.7. dissolved oxygen,
59.3.8. trash and groat pollutants, and
59.3.9. f8eca1 coIiforms.
for ape od of 3 years from
59.4. The applicant shell coirtinue this water quality monitoring .
completion of the final stage of construction.
the build-
In addition. the applicant shall undertake inspections fOt erosion and deposition,
of trash and pollutants, and other water pollution. Th se inspections win be
up gross
for a period of 3
C21rried out every third month .swell as after slgnific;ant rainfall events. .
years from completion of !hefinal stage Of con$’UetiOn.
Plan sha be prepared to the
59.5. An operational phase water Quality Management
water
reasonable satJafactlon of Coundl and address water quality performance targets,
treatment deVfcea. water quality maintenance..requirements for stormwater’ management
d water
measures and devlcea. The plan shall demonstrate compUsnce w\tt1 the prescrf
qu.fity objeetives.
Plan shall be
59.6. Responsibilities under the Stormwa.lBr and Water Quality Management
ctear1y delineated.
.
will trigger the implementation of
59.7. Non-compliance with prescribed water quality standard. .
measures to redify the probJem(s).
60. Reports on monitoring, Inc~ts, corrective
action and pliI!’ updatea shall be submitted to
Council every month during construction ~Council being
notified if any incident is recorded.
These reports. shaU Indude Information coIleded during the monthly monitoring program, shall
non-standard results. and be submitted in a form acceP\8ble to Council. The
highlight any
format and content of these reports shall be In hard copy
and digital form, generaNy In.
with the following:
a~anC8
.50.1. Including tables of the monitoring results (dlgitaf form should be In Excel):
all parameters required In the monitoring
60.2. Include Individual charts plotting the results for
(digital form .should be In Ex); and
and recommend any necnsary actions.
60.3~ include a brief written dlscusalon of the resutta
these reports shan continue
After completion of the construdion slge of the development,
.
of two (2)yea~.
every three (3)months.for a period
Wafer Quality Devices .
rcfance wMh the Stonnwaler and
81. Water quality control devices shall be I.nlta/Ied generally In acx:
Waw Quality Management Plan. Detaled staging plans
and specifICations, ball8d on ...d
with
In accordance With th_ Plan .ha~ be prepared and submitted (after consultation
generally works.
officersof the with the relevant appllc8tions
Council) for operational
+
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Request to extend relevant period 132003.221199.3Related documentApplication case desk ↗
About this file
- File size
- 37.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.