Stormwater!Management(Plan(!
71#Seaview#Terrace,"Sunshine(Beach!
MARKUS'HASLER'!

!
!
!
!
!
!
!
!
!
!                 !




                                      !


[OCR of page images]
 

Stormwater Management Plan

71 Seaview Terrace, Sunshine Beach
MARKUS HASLER

 
Full text of pages 2 to 40 (of 68)

Page 2

AquaIntel!Pty!Ltd!
t:!+7!5414!7185!m:!0400!436!391!
e:[email protected]!
w:!www.aquaintel.com.au!
ACN:!153!875!953!!ABN:!83!572!946!845!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Document!Information!
                     Stormwater!Management!Plan!!
Report!Title!
                     71!Seaview!Terrace,!Sunshine!Beach!
Version!             Rev!C!

Author(s)!           Kelly!McKendry!

Approved!by!         KMcK!(RPEQ!09298)!

Signed!              !

Date!                6!May!2016!

Doc!No!              2014022TRPTT003!

Distribution!        TOD!Consulting!Engineers!




!                    !




                     AquaIntel!Projects:2014022_Seaview_Tce_SWMP:reporting:REVC:2014022_71_SeaviewTce_SWMPT
Document!Path:!
                     revC.docx!
!
!




                                                                                                      !


[OCR of page images]
Aqualntel Pty Ltd

t: +7 5414 7185 m: 0400 436 391

e: [email protected]

w: www.aquaintel.com.au
ACN: 153 875 953 ABN: 83 572 946 845

 

Document Information

 

Stormwater Management Plan

 

 

Report Title 71 Seaview Terrace, Sunshine Beach
Version Rev C
Author(s) Kelly McKendry

 

Approved by

KMcK (RPEQ 09298)

 

 

 

 

 

Signed YW
Date 6 May 2016
Doc No 2014022-RPT-003
Distribution TOD Consulting Engineers

 

 

Aquaintel Projects:2014022_Seaview_Tce_SWMP:reporting:REVC:2014022_71_SeaviewTce_SWMP-

revC.docx

 

Page 3

!




Executive!Summary!
!
AquaIntel! has! been! commissioned! by! TOD! Consulting! Engineers! on! behalf! of! Universal!
Property! Company! Establishment! to! prepare! a! Stormwater! Management! Plan! (SWMP)! to!
support! the! Operational! Works! Approval! for! the! residential! development! at! 71! Seaview!
Terrace,!Sunshine!Beach!(Lot!1!RP197117).!!This!document!supersedes!both!the!original!the!
stormwater! management! plan! (Rev! A)! prepared! by! AquaIntel! (January! 2014)! in! support! of!
the! Material! Change! of! Use! application! and! the! previous! Stormwater! Management! Plan!
(RevB)! submitted! with! the! Operational! Works! application! for! the! site.! ! This! document! is!
prepared! to! address! the! RFI! for! the! Operational! Works! application! and! specifically! Items! 1!
and!3!(Doc!Ref!MLEWIS:OPW16/0021,!issued!5!April!2016).!
!
The!site!is!currently!undeveloped!and!well!vegetated.!!The!site!is!located!adjacent!to!Noosa!
National!Park.!There!is!a!small!external!catchment!draining!through!the!site!from!the!west.!!
The! site! grades! from! the! west! to! the! east! and! currently! runoff! from! the! site! collects! in! a!
drainage!line!near!the!eastern!boundary!of!the!site!and!discharges!to!the!beach.!!!
!
It!is!proposed!that!the!residence!be!constructed!with!a!living!‘green’!roof!consisting!of!up!to!
200!mm!of!planted!material!covering!the!shell!like!structure.!!The!roof!will!drain!via!an!under!
surface!drainage!network!and!a!series!of!intercept!drains!to!the!edges!of!the!roof.!!
!
Environmental! best! management! practices! are! proposed! for! treatment! of! stormwater!
generated!by!the!site.!Stormwater!will!be!treated!using!a!number!of!treatment!devices!prior!
to!discharge!to!the!receiving!environment.!The!stormwater!treatment!train!for!the!site!will!
consist! of! a! combination! of! areas! treated! within! two! separate! bioretention! basins,! water!
harvesting!and!reuse!on!site,!and!maintenance!of!discharge!from!the!green!roof!into!natural!
gullies.! ! While! it! is! not! proposed! to! direct! all! site! runoff! through! a! formal! water! quality!
treatment!device,!this!report!demonstrates!that!the!Water!Quality!Objectives,!defined!in!the!
SPP,!will!be!met!by!the!overall!treatment!train!proposed!for!the!developed!portion!of!the!site.!
!
Non_worsening!of!peak!flows!from!the!site!has!been!demonstrated!through!the!incorporation!
of!a!detention!basin!and!stormwater!tank.!!Runoff!from!the!external!catchment!to!the!west!
of! the! site! will! be! managed! by! diverting! the! existing! drainage! paths! along! the! western!
boundary!and!allowing!flow!to!continue!through!the!area!of!the!site!to!the!north!which!will!
not!be!developed.!Runoff!from!the!driveway!will!be!captured!initially!in!a!detention!basin!(to!
be!co_located!with!a!bioretention!basin)!then!discharge!will!be!returned!to!sheet!flow!prior!to!
entering!natural!drainage!gullies!below!the!development!footprint.!!The!grassed!area!on!the!
southern!side!of!the!proposed!building!and!pool!deck!area!will!be!captured!via!a!bioretention!
basin! for! treatment! (but! limited! detention)! prior! to! exiting! the! site! via! a! piped! outflow! to!
below! RL26! and! a! spreader! at! that! location! to! minimise! the! risk! associated! with! flow!
concentration.!!In!order!to!achieve!non_worsening!of!peak!flows!from!the!site!it!is!necessary!
to!capture!flow!from!the!southern!part!of!the!green!roof!and!pass!them!through!a!detention!
tank.! ! The! detention! tank! (denoted! Stormwater! Tank)! will! discharge! via! the! same! level!
spreader!as!that!which!outlets!the!southern!bioretention!basin.!!To!reduce!concentration!of!
flows! and! to! maintain! the! natural! hydrologic! regime! as! far! as! possible! it! is! proposed! that!
runoff! from! the! Green! roof! (North)! and! Lower! Lawn! (North! and! South)! be! return! to! sheet!
flow! prior! to! exiting! at! the! environmental! line.! ! Runoff! from! the! hard! roof! area! will! be!
directed!to!a!rainwater!tank!for!reuse!on!site,!with!overflows!directed!to!the!stormwater!tank!
that!also!services!the!Green!Roof!(South).!



                                                                                                          !

Page 4

!

!
This!Stormwater!Management!Plan!demonstrates!that!effective!treatment!of!stormwater!at!
the!proposed!development!can!be!achieved!through!the!application!and!appropriate!design!
of! Water! Sensitive! Urban! Design! (WSUD)! principles! in! accordance! with! legislative!
requirements! and! best! practice! guidelines.! The! treatment! train! proposed! for! the!
development!site!achieves!the!performance!criteria!set!by!the!Noosa!Shire!Council.!!!On!site!
detention! will! ensure! the! non_worsening! criteria! is! achieved! and! downstream! impacts! are!
insignificant.!!A!treatment!train!that!both!detains!and!treats!part!of!the!site!while!allowing!
the! balance! of! the! site! to! be! released! at! the! development! extent! will! act! to! maintain! the!
natural! hydrologic! regime! as! far! as! practical! and! ensure! that! stormwater! runoff! is! balance!
between!the!natural!gullies!within!the!site.!
!                                      !




                                                                                                         !

Page 5

!


Contents!
EXECUTIVE!SUMMARY!                                I!

1! INTRODUCTION!                                  1!
1.1! SITE!CHARACTERISTICS!                        1!
1.2! PREVIOUS!INVESTIGATIONS!                     2!

2! STORMWATER!QUALITY!                            5!
2.1! DESIGN!OBJECTIVES!                           5!
2.2! STORMWATER!QUALITY!TREATMENT!                5!
2.2.1! STRATEGY!                                  5!
2.3! MODELLING!APPROACH!                          7!
2.3.1! PHILOSOPHY!                                7!
2.3.2! MUSIC!SETUP!                               7!
2.3.3! CATCHMENT!AREAS!                           8!
2.3.4! MUSIC!MODEL!LAYOUT!                        9!
2.4! TREATMENT!MEASURES!                         10!
2.4.1! RAINWATER!TANKS!                          10!
2.4.2! BIORETENTION!SYSTEM!                      11!
2.4.3! SEDIMENT!FOREBAYS!                        11!
2.5! RESULTS!                                    13!

3! STORMWATER!QUANTITY!                          14!
3.1!   SITE!DRAINAGE!AND!CATCHMENT!DEFINITION!   14!
3.2!   EXISTING!SCENARIO!                        15!
3.3!   RATIONAL!METHOD!CALIBRATION!              16!
3.4!   DEVELOPED!SCENARIO!                       16!
3.5!   MITIGATED!SCENARIO!                       18!

4! DETAILED!DESIGN!DOCUMENTATION!                22!

5! BIORETENTION!MAINTENANCE!MANUAL!              23!

6! WATER!QUALITY!MONITORING!                     24!
6.1! CONSTRUCTION!                               24!
6.2! OPERATIONAL!                                24!

7! CONCLUSIONS!                                  25!

8! REFERENCES!                                   26!
!
!
APPENDICES!
!
Appendix!1:!OPW!Drawings!                          !
Appendix!2:!Rational!Method!                       !
Appendix!3:!WBNM!results!                          !
Appendix!4:!Bioretention!Maintenance!Manual!       !



                                                   !


[OCR of page images]
 

 

 

 

 

 

 

 

 

aqua
Contents

EXECUTIVE SUMMARY I
1 INTRODUCTION 1
1.1 SITE CHARACTERISTICS 1
1.2 PREVIOUS INVESTIGATIONS 2
2 STORMWATER QUALITY 5
2.1 DESIGN OBJECTIVES 5
2.2 © STORMWATER QUALITY TREATMENT 5
2.2.1 STRATEGY 5
2.3. MODELLING APPROACH 7
2.3.1 PHILOSOPHY 7
2.3.2 MUSIC SETUP 7
2.3.3. CATCHMENT AREAS 8
2.3.4 MUSIC MODEL LAYOUT 9
2.4 TREATMENT MEASURES 10
2.4.1 RAINWATER TANKS 10
2.4.2 BIORETENTION SYSTEM 11
2.4.3. SEDIMENT FOREBAYS 11
2.5 RESULTS 13
3 STORMWATER QUANTITY 14
3.1 SITE DRAINAGE AND CATCHMENT DEFINITION 14
3.2 EXISTING SCENARIO 15
3.3. RATIONAL METHOD CALIBRATION 16
3.4 DEVELOPED SCENARIO 16
3.5 MITIGATED SCENARIO 18
4 DETAILED DESIGN DOCUMENTATION 22
5 BIORETENTION MAINTENANCE MANUAL 23
6 WATER QUALITY MONITORING 24
6.1 CONSTRUCTION 24
6.2 OPERATIONAL 24
7 CONCLUSIONS 25
8 REFERENCES 26
APPENDICES

Appendix 1: OPW Drawings

Appendix 2: Rational Method

Appendix 3: WBNM results

Appendix 4: Bioretention Maintenance Manual

Page 6

!


!
!
!
!
FIGURES!
!
Figure!1:!Locality!Plan!                                                          3!
Figure!2:!Development!Layout!                                                     4!
Figure!3:!Conceptual!Water!Quality!Treatment!Train!                               7!
Figure!4:!Model!Layout!                                                           9!
Figure!5:!WSUD!Strategy!                                                         12!
Figure!6:!Catchment!Plan!                                                        20!
Figure!7:!Detention!Strategy!                                                    21!
!
!
TABLES!
!
Table!1:!Site!stormwater!quality!objectives!(operational!phase)!                  5!
Table!2:!Impervious!Percentage!                                                   8!
Table!3:!Catchment!Areas!                                                         9!
Table!4:!MUSIC!Rainwater!Tank!Parameters!                                        10!
Table!5:!Bioretention!Basin!Design!Parameters!                                   11!
Table!6:!MUSIC!Results!–!LoadbBased!Pollutant!Outputs!                           13!
Table!7:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Existing!Scenario!     15!
Table!8:!!Existing!Scenario!WBNM!Outlet!Peak!Flows!                              15!
Table!9:!Rational!Method!Calibration!Summary!(Total!Catchment)!                  16!
Table!10:!Rational!Method!Peak!Flows!Versus!WBNM!Peak!Flows!                     16!
Table!11:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Developed!Scenario!   17!
Table!12:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!1!                 17!
Table!13:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!2!                 18!
Table!14:!Storage!and!Outlet!Details!of!Detention!System!                        18!
Table!15:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!1!                      19!
Table!16:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!2!                      19!
Table!17:!!Level!Spreader!Calculations!                                          22!
!
!




                                                                                   !


[OCR of page images]
FIGURES

Figure 1: Locality Plan

Figure 2: Development Layout

Figure 3: Conceptual Water Quality Treatment Train
Figure 4: Model Layout

Figure 5: WSUD Strategy

Figure 6: Catchment Plan

Figure 7: Detention Strategy

TABLES

Table 1: Site stormwater quality objectives (operational phase)

Table 2: Impervious Percentage

Table 3: Catchment Areas

Table 4: MUSIC Rainwater Tank Parameters

Table 5: Bioretention Basin Design Parameters

Table 6: MUSIC Results — Load-Based Pollutant Outputs

Table 7: WBNM Sub-Catchment Fraction Impervious Values — Existing Scenario
Table 8: Existing Scenario WBNM Outlet Peak Flows

Table 9: Rational Method Calibration Summary (Total Catchment)

Table 10: Rational Method Peak Flows Versus WBNM Peak Flows

Table 11: WBNM Sub-Catchment Fraction Impervious Values — Developed Scenario
Table 12: Developed Scenario WBNM Outlet Peak Flows — Outlet 1

Table 13: Developed Scenario WBNM Outlet Peak Flows — Outlet 2

Table 14: Storage and Outlet Details of Detention System

Table 15: Comparison of WBNM Outlet Peak Flows — Outlet 1

Table 16: Comparison of WBNM Outlet Peak Flows — Outlet 2

Table 17: Level Spreader Calculations

aqua

on bw

12
20
21

wou

10
11
13
15
15
16
16
17
17
18
18
19
19
22

Page 7

!


1 Introduction!
AquaIntel! has! been! commissioned! by! TOD! Consulting! Engineers! on! behalf! of!
Universal! Property! Company! Establishment! to! update! a! previously! prepared!
Stormwater! Management! Plan! (SWMP)! to! support! the! Operational! Works!
application!for!the!residential!development!at!71!Seaview!Terrace,!Sunshine!Beach!
(Lot! 1! RP197117).! ! This! document! supersedes! the! Stormwater! Management! Plan!
(SWMP)!prepared!by!AquaIntel!(2014)!in!support!of!the!MCU!application!for!the!site.!!
This!document!(RevC)!is!also!an!update!to!address!the!issues!raised!in!the!RFI!for!the!
Operational!Works!application!issued!on!the!5!April!2016.!
The!development!will!be!required!to!comply!with!the!Division!20!–!Water!Sensitive!
Urban!Design!Code!of!the!Noosa!Shire!Council’s!(NSC)!“The!Noosa!Plan”.!!From!this,!
the! load! based! Water! Quality! Objectives! (WQO’s)! stipulated! in! the! State! Planning!
Policy!July!2014!for!the!South!East!Queensland!region!will!be!adopted!for!the!site.!!In!
addition! the! development! has! received! development! conditions! based! on! the!
Material!Change!of!Use!planning!application!for!the!site.!!
The!purpose!of!this!SWMP!is!to!identify!the!stormwater!quality,!detention!and!water!
reTuse!options!that!could!be!implemented!within!the!site!to!achieve!elements!of!the!
code! and! address! Development! Conditions! 28a! and! 28b.! ! This! revision! (RevC)! also!
looks! to! address! items! 1! and! 3! of! the! RFI! issued! with! respect! to! the! Operational!
Works!application!on!the!5!April!2016.!!The!objectives!of!this!SWMP!are!to:!!
    •   Ensure!the!proposed!development!maintains!or!improves!the!environmental!
        values!of!the!receiving!waters!within!the!receiving!catchment!throughout!the!
        operational!phase;!!
    •   Consider! suitable! Stormwater! Quality! Improvement! Devices! (SQID’s)! based!
        on!Water!Sensitive!Urban!Design!(WSUD)!principles;!
    •   Recommend!an!appropriate!stormwater!treatment!strategy!for!the!proposed!
        development! that! complies! with! Noosa! Shire! Council! (NSC)! water! quality!
        objectives;!!
    •   Ensure! the! development! achieves! nonTworsening! of! stormwater! flows!
        downstream!of!the!site;!
    •   Show!compliance!with!the!MCU!approval!conditions!(Specifically!No.!28);!and!
    •   Address!Items!1!and!3!of!the!RFI!issued!by!NSC!on!the!5!April!2016.!
    !

1.1 Site!Characteristics!
The! location! of! the! site! is! shown! in! Figure! 1.! ! ! The! total! site! area! is! approximately!
9,942m2.!The!site!is!currently!well!vegetated!with!no!structures!or!buildings!on!the!
site.!The!site!is!adjacent!to!Noosa!National!Park!to!the!north,!two!residential!lots!to!
the!west,!a!single!residential!lot!to!the!south!and!Sunshine!Beach!to!the!east.!
The!site!grades!from!the!west!to!the!east,!with!elevations!ranging!from!51!m!AHD!to!
7! m! AHD,! and! discharges! to! the! beach.! ! There! is! a! 2856! m2! of! external! catchment!
located!along!the!western!boundary!(existing!residential!lots!on!McAnally!Drive).!!
The! site! is! located! on! the! frontal! beach! dunes! and! the! area! of! proposed!
development!is!not!influenced!by!regional!or!local!flooding!or!storm!tide.!!!


!                                                    !                                                ! 1!

Page 8

!


It!is!proposed!that!a!single!residential!building!be!constructed!on!approximately!one!
third!of!the!site!and!it!is!to!consist!of!a!collection!of!curved!shell!like!structures!with!
living!‘green’!roofs.!The!development!layout!is!provided!in!Figure!2.!
!
1.2 Previous!Investigations!
A! SWMP! was! completed! for! a! previously! proposed! building! on! the! site! by! JFP! in!
October! 2009.! ! The! proposed! building! has! been! altered! significantly! in! the! current!
design.!
In! 2014! AquaIntel! prepared! a! SWMP! for! submission! with! the! MCU! application! for!
the!current!development!layout.!!AquaIntel!then!modified!the!SWMP!to!reflect!the!
detailed! design! for! the! development! and! for! submission! of! the! Operational! Works!
application! in! January! 2016.! This! document! supersedes! the! previous! SWMPs! by!
AquaIntel.!
!
!
!
!                               !




!                                                !                                            ! 2!

Page 9

LEGEND)                 Data)Source)Notes:)
                        #
                                              Project:))71#Seaview#Terrace#Stormwater#
#
                                                       #Management#Plan)
      #Site#Locality#
                                                       )#
      #         ##
                                                             Figure)1))Locality)Plan)
      #         ##
                                              #
      #         ##
                                              #
      #         ##
                                              #
      #         ##
                                              Date:)20/09/14 #            ##
                                              Drawn)by:)KM#


[OCR of page images]
 

SCY ry
ete Oe

 

 

 

 

 

 

Data Source Notes:

nmeAn ay

Inve

 

Project: 71 Seaview Terrace Stormwater
Management Plan

 

LEGEND

Ty Site Locality

 

Figure 1 Locality Plan

a”

Date: 20/09/14
Drawn by: KM aqua

 

 

 

 

Page 10

LEGEND)        Data)Source)Notes:)                            Project:))71#Seaview#Terrace#Stormwater#Management#Plan#
#              Proposed#development#layout#provided#by#TOD#
               ConsulDng#for#use#in#this#invesDgaDon.#        #
      #   ##   #                                              #
      #   ##                                                           )        )Figure)2))Development)Layout#
      #   ##                                                  #
      #   ##                                                  Date:)29/01/16 #           ##
      #   ##                                                  Drawn)by:)KM#


[OCR of page images]
 

 

Sa

<i

 

 

LEGEND

 

Data Source Notes:
Proposed development layout provided by TOD
Consulting for use in this investigation.

 

 

Project: 71 Seaview Terrace Stormwater Management Plan

Date: 29/01/16
Drawn by: KM

Figure 2 Development Layout nr~

aquaintel

 

 

 

Page 11

!


2 Stormwater!Quality!
2.1 Design!Objectives!
This! report! identifies! the! stormwater! quality! management! objectives! for! the!
operational! phase! (postTconstruction! phase)! of! the! proposed! development.!!
Construction! based! stormwater! quality! management! objectives! will! need! to! be!
addressed!as!part!of!operational!works!documentation.!
Water! quality! objectives! or! performance! criteria! for! the! proposed! urban!
development!in!this!location!are!those!stipulated!in!the!State!Planning!Policy!–!July!
2014! for! the! South! East! Queensland! region.! ! The! applicable! water! quality! design!
objectives!for!this!location!are!shown!in!Table!1!below.!!!
However,!the!applicability!of!these!objectives!for!this!development!are!questionable.!!
The!SPP!states!that!“the!making!a!material!change!of!use!or!carrying!out!operational!
work!for!the!purposes!of,!or!associated!with,!a!single!detached!dwelling”!is!outside!
the! scope! of! the! policy.! ! However,! the! policy! does! apply! where! a! MCU! or! ROL! for!
urban!purposes!includes!a!land!area!greater!than!2500!m2.!!In!order!to!demonstrate!
a!high!level!of!protection!of!the!environmental!values!of!the!receiving!waters!within!
the!receiving!catchment!the!water!quality!objectives!provided!in!Table!1!are!adopted!
for!use!in!this!investigation.!
Table!1:!Site!stormwater!quality!objectives!(operational!phase)!

       Minimum!reductions!in!mean!annual!loads!from!unmitigated!development!(%)!
       Total!Suspended!           Total!              Total!Nitrogen!!   Gross!pollutants!!
         Solids!(TSS)!       Phosphorous!(TP)!             (TN)!             >5!mm!
               80!                   60!                    45!                  90!
!

2.2 Stormwater!Quality!Treatment!
2.2.1 Strategy!
The!proposed!development!is!unique!with!respect!to!water!quality!as!the!majority!of!
the! structure! is! proposed! to! be! covered! in! a! living! ‘green’! roof.! ! Detail! of! the!
proposed!living!’green’!roof!is!contained!within!the!site!landscape!plan!(James!Birrell!
Design! Lab,! 2015).! ! The! green! roof! is! proposed! to! consist! of! cells! of! planted! soil!
media!of!a!total!depth!of!200!mm.!!These!cells!will!be!drained!via!an!under!drainage!
network! and! gravel! drainage! channels! to! the! edges! of! the! structure! prior! to!
discharge!from!the!roof.!
While!the!living!‘green’!roof!will!in!effect!act!to!reduce!impervious!area!and!provide!
a!level!of!water!quality!treatment,!for!the!purpose!of!quantification!of!stormwater!
quality! the! roof! area! has! been! included! in! the! quality! treatment! strategy! as!
catchment!area!and!not!as!a!treatment!device.!!
The!treatment!train!for!the!proposed!development!has!been!reviewed!based!on!the!
RFI!Items!1!and!3!and!is!shown!in!Figure!3.!!The!objective!of!the!treatment!train!is!to!



!                                                 !                                              ! 5!

Page 12

!


treat!runoff!from!the!site!to!a!quality!which!achieves!the!objectives!of!the!SPP!but!
which!will!also!maintain!the!natural!hydrological!regime!as!far!as!is!practical.!!!
The!external!catchment!will!not!contribute!runoff!to!any!bioretention!or!detention!
system!on!site!and!will!be!diverted!around!the!site!to!the!north.!!The!driveway!will!
be! directed! to! a! bioretention! basin! of! 5m2,! to! be! coTlocated! with! the! detention!
basin,! at! the! northern! end! of! the! driveway.! ! Discharge! from! this! basin! will! be!
returned!to!sheet!flow!prior!to!being!discharged!to!natural!areas!within!the!site!but!
below!the!development!footprint.!!The!grassed!area!only!the!southern!boundary!of!
the!site!and!the!pool!deck!and!lawn!are!to!be!collected!and!treated!in!a!bioretention!
basin!of!12m2!surface!area,!outleting!into!the!receiving!environment!via!a!pipe!and!
level! spreader! at! a! location! on! site! below! the! elevation! stipulated! by! the!
development! MCU! approval! conditions.! ! The! hard! surface! roof! will! be! collected!
within!a!25!kL!tank!and!reused!on!the!site!at!an!assumed!rate!of!500!L/day.!!Green!
Roof!(North!and!South)!and!the!lawn!areas!below!the!building!are!not!proposed!to!
be!treated!but!instead!the!runoff!from!the!green!roof!is!to!be!spread!and!returned!to!
sheet!flow!prior!to!reaching!the!natural!vegetation.!!While!it!is!proposed!that!part!of!
the!site!will!not!pass!directly!through!a!water!quality!improvement!device!it!will!be!
demonstrated! that! this! overall! treatment! train! is! sufficient! to! meet! the! entire!
treatment!needs!of!the!site.!
During! the! detailed! building! design! FLOTH! Sustainable! Building! Consultants! have!
undertaken! the! hydraulic! design! of! the! internal! stormwater! management!
infrastructure.! ! The! internal! hydraulic! design! has! been! modified! from! that! initially!
proposed!with!the!OPW!application!in!order!to!address!the!issues!raised!in!the!RFI!
(April!2016).!!As!noted!above!it!is!proposed!that!runoff!from!the!‘hard’!roof!area!be!
collected!within!a!‘Rainwater!Tank’!and!will!now!be!used!for!limited!internal!use!and!
external! water! demands.! ! Water! will! no! longer! be! harvested! from! the! green! roof!
areas!for!reuse!on!the!site!and!instead!will!be!either!discharged!to!the!lawn!areas!in!
order!to!return!flows!to!sheet!flow!prior!to!entering!existing!drainage!paths!or!will!
be!collected!in!a!detention!tank!in!order!to!mitigate!any!increases!in!peak!flows!from!
the! site.! ! Discharges! from! the! site! will,! as! far! as! practical,! be! directed! to! the!
predevelopment!drainage!paths!below!the!proposed!development!footprint.!
!
!




!                                                 !                                             ! 6!

Page 13

!




                                                                                                  !
Figure!3:!Conceptual!Water!Quality!Treatment!Train!


2.3 Modelling!Approach!
2.3.1 Philosophy!
As! discussed! above! a! conservative! approach! to! the! quantification! of! water! quality!
load! generation! and! treatment! as! a! result! of! the! proposed! living! ‘green’! roof! has!
been!adopted!for!this!investigation.!!The!areas!of!‘green’!roof!have!been!included!in!
the! MUSIC! model! as! forest! source! nodes! and! not! as! treatment! devices.! ! It! is!
proposed!that!the!roof!areas!be!planted!with!native!endemic!species!and!thus!will!
reflect! the! surrounding! forest! areas! rather! than! an! urban! garden.! The! ‘green’! roof!
areas! will,! in! fact,! provide! a! certain! level! of! water! quality! treatment! similar! to! a!
bioretention!garden;!however,!this!has!not!been!included!in!the!modelling.!!
Hydraulic! design! and! site! water! reuse! estimates! have! been! modified! from! the!
original! OPW! application.! ! The! currently! proposed! treatment! train! aims! to! address!
items!raised!in!the!NSC!RFI!(5!April!2016).!!The!proposed!treatment!train!differs!from!
both! the! previous! OPW! application! and! the! proposal! presented! in! the! superseded!
SWMP!(AquaIntel,!2014).!!As!such!the!MUSIC!model!has!been!amended.!!
In!order!to!quantify!load!reductions!a!base!case!(unmitigated)!assuming!the!building!
has!the!green!roof!areas!is!compared!to!mitigated!scenarios!including!the!inclusion!
of!reuse!estimates!and!treatment!devices.!!
2.3.2 MUSIC!Setup!
An! assessment! of! stormwater! runoff! quality! from! the! proposed! development! site!
has! been! conducted! using! the! Cooperative! Research! Centre! for! Catchment!
Hydrology’s! (CRCCH)! Model! for! Urban! Stormwater! Improvement! Conceptualisation!
(MUSIC).! MUSIC! is! a! decision! support! tool,! used! to! plan! and! design! appropriate!



!                                                  !                                              ! 7!

Page 14

!


urban! stormwater! management! systems! at! the! conceptual! level.! ! MUSIC! Version!
6.1.0,!released!in!2015,!was!used!in!this!assessment.!
Climate!data!for!the!catchment!was!sourced!from!the!MUSIC!model!database.!!The!
rainfall! and! evaporation! data! template! for! this! site! has! been! based! on! data! from!
Cooroy!from!1/1/1973T!31/12/1983!with!six!(6)!minute!rainfall!duration.!
The!“MUSIC!Modeling!Guidelines”!(Water!By!Design,!2010)!was!used!as!the!basis!for!
constructing! the! MUSIC! model.! ! The! default! parameters! of! the! MUSIC! model! were!
used!in!representing!the!treatment!nodes!(where!applicable).!!
Source! node! parameters! for! urban! residential! (roof,! road! and! ground! level)! and!
forest!from!the!“MUSIC!Modeling!Guidelines”!(Water!By!Design,!2010)!were!used!in!
the!MUSIC!model.!
The! following! scenarios! were! modelled! in! order! to! assess! the! performance! of! the!
proposed!development!and!treatment!devices:!

    1. Base! Case! –! developed! case! with! the! inclusion! of! the! building! with! a!
       conventional!impervious!roof;!
    2. Green! Roof! –! the! inclusion! of! the! roofed! areas! as! forest! source! nodes,! no!
       additional!treatment;!and!
    3. Mitigated! –! the! inclusion! of! the! green! roof! and! additional! water! quality!
       treatment!devices,!namely!bioretention!gardens.!

The!fraction!impervious!value!applied!for!each!of!the!source!nodes!in!the!scenarios!
outlined!above!are!detailed!in!Table!2.!
!
Table!2:!Impervious!Percentage!

Source!Node!                            Base!Case!         Green!Roof!          Mitigated!
Driveway!                                 100%!               100%!               100%!
Deck!areas!(excluding!pool!
                                          100%!               100%!               100%!
surface)!
Roof!                                     100%!                 0%!                 0%!
Garden/lawn!                                0%!                 0%!                 0%!
!

2.3.3 Catchment!Areas!
For!the!purposes!of!water!quality!modelling!the!development!site!has!been!split!into!
catchments! that! report! to! the! various! water! quality! treatment! devices.! Each!
catchment! is! then! divided! into! roofed,! paved,! road! and! grassed! areas.! ! Significant!
areas!of!the!site!remain!undeveloped!and!have!been!included!in!the!MUSIC!model!as!
forested,! however,! results! are! reported! upstream! of! these! areas.! Table! 3! outlines!
the!catchment!areas!represented!within!the!MUSIC!model.!The!stormwater!quality!
catchments!are!provided!in!Figure! 5.!External!catchments!have!not!been!modelled!
as!they!do!not!contribute!to!the!water!quality!improvement!devices.!
!
!



!                                                 !                                           ! 8!

Page 15

!


!
Table!3:!Catchment!Areas!
                            Drive!     Roof!         Deck!   Grassed!     Forest!
                                                                             Total!
     Catchment!
                            (ha)!      (ha)!         (ha)!     (ha)!       (ha)#!
                                                                              (ha)!
External!                     !      !         !          !               0.286!
                                                                             0.286!
D1c!                       !         !         !          !               0.155!
                                                                             0.155!
Driveway!               0.026!       !         !          !          !       0.026!
Green_Roof!                !      0.067!       !          !          !       0.067!
Lower_A!                   !         !         !       0.024!        !       0.024!
Lower_B!                   !         !     0.02736! 0.02964!         !       0.057!
Roof!                      !      0.022!       !          !          !       0.022!
D2b!                       !         !         !          !       0.221!     0.221!
C3!                        !         !         !          !       0.317!     0.317!
!                          !         !         !          !       0.286!     0.286!
#!Forest!sources!nodes!for!the!undeveloped!portion!of!the!site!have!been!included!in!
the!MUSIC!model!however!results!are!reported!at!the!outlet!of!the!developed!areas.!!

2.3.4 MUSIC!Model!Layout!
As! the! management! of! urban! stormwater! needs! to! take! a! holistic! approach,! a!
number! of! management! measures! need! to! be! implemented! in! series! to! form! a!
treatment!train.!The!correct!utilisation!of!various!devices!within!the!treatment!train!
is! imperative! to! target! the! desired! pollutants,! from! the! gross! solids! to! the! fine!
particles.!!Figure! 4!shows!the!MUSIC!model!layout!for!the!development!(Mitigated!
Scenario).!




                                                                                              !
Figure!4:!Model!Layout!
!


!                                                !                                            ! 9!

Page 16

!


!

2.4 Treatment!Measures!
Runoff! from! the! development! will! be! treated! via! two! bioretention! basins.! ! The!
location! of! the! basins! is! shown! in! Figure! 5.! ! The! area! of! concrete! roof! will! also! be!
captured!in!a!rainwater!tank!for!reuse!within!the!development.!

2.4.1 Rainwater!Tanks!




                                                                                         !
!
Through! appropriate! design! of! rainwater! tanks! it! has! been! found! that! significant!
reductions!in!runToff!can!be!achieved.!!Rainwater!tanks!not!only!provide!temporary!
detention!of!stormwater!runToff,!but!also!provide!a!significant!alternative!for!water!
supply!uses.!!Collected!roof!water!is!suitable!for!garden!irrigation!or!toilet!flushing!
with!no!additional!treatment.!!!
An! additional! benefit! to! rainwater! tanks! is! that! the! detention! of! stormwater! flows!
can! alter! the! pollutant! transportation! characteristics! of! a! catchment.! ! Rainwater!
tanks! can! be! incorporated! into! building! design! so! that! they! do! not! impact! on! the!
aesthetics!of!an!urban!development.!!!
The!modified!OPW!treatment!train!proposes!one!tank!to!be!utilised!for!stormwater!
treatment! (the! Rainwater! Tank).! ! A! second! tank! (Stormwater! Tank)! will! be! utilised!
for!detention!purposes!only!and!does!not!form!part!of!the!water!quality!treatment!
train.!!The!size!and!outlet!pipework!included!in!the!MUSIC!model!as!shown!in!Table!
4.!!As!the!proposed!reuse!from!the!tank!is!now!to!be!limited!to!nonTpotable!internal!
use!and!external!use!there!is!no!additional!treatment!of!the!water!proposed!prior!to!
use.!!!
Estimates!of!reuse!have!been!reduced!to!500!L/d!which!is!considered!reasonable!for!
the!size!and!scale!of!the!proposed!development!and!are!modelled!as!noted!Table!4.!
Table!4:!MUSIC!Rainwater!Tank!Parameters!


                                                                  Rainwater!
                                   Parameter!
                                                                    Tank!

                               Tank!Volume!(kL)!                      25!
                                                 2
                               Surface!Area!(m )!                    12.5!
                       Equivalent!Overflow!Pipe!(mm)!                212!
                       Constant!Daily!Outflow!to!Reuse!
                                                                      0.5!
                                  (kL/d)!#!
#!ReTuse!estimates!applied!as!a!constant!daily!demand.!



!                                                    !                                               ! 10!

Page 17

!


!
!
2.4.2 Bioretention!System!




                                                                                             !
!
Bioretention! systems! use! ponding! above! a! treatment! surface! to! maximise! the!
volume! of! runoff! flowing! through! the! filtration! media.! They! typically! convey! flows!
above! the! design! event! through! overflow! pits.! ! The! treatment! system! operates! by!
firstly!filtering!surface!flows!through!surface!vegetation!and!then!percolating!runoff!
through! prescribed! filtration! media.! ! This! media! provides! treatment! through! fine!
filtration,!extended!detention!and!biological!uptake!of!nutrients.!!!
As! these! systems! take! approximately! 12T24! h! to! drain,! the! maximum! depth! of!
ponding! allowed! to! occur! over! the! filter! area! has! been! limited! to! 300! mm.! ! The!
depth! of! the! filter! media! has! been! limited! to! 400! mm.! ! Table! 5! summarises! the!
proposed! design! parameters! for! the! bioretention! basin! for! this! development.!!
Indicative!bioretention!locations!are!highlighted!in!Figure!5.!
!
Table!5:!Bioretention!Basin!Design!Parameters!

                           Parameter!                    Bio1!         Bio2!
                Extended!Detention!Depth!(m)!            0.3!          0.3!
                                              2
                   Storage!Surface!Area!(m )!             5!            12!
                                          2
                     Filter!Media!Area!(m )!              5!            12!
              Unlined!Filter!Media!Perimeter!(m)!        0.01!         0.01!
               Saturated!Hydraulic!Conductivity!
                                                         200!          200!
                            (mm/hr)!
                       Filter!Depth!(m)!                 0.4!          0.4!
              TN!Content!of!Filter!Media!(mg/kg)!        800!          800!
               Orthophosphate!Content!of!Filter!
                                                          55!           55!
                         Media!(mg/kg)!
                   Exfiltration!Rate!(mm/hr)!            0.0!          0.0!
                   Overflow!Weir!Length!(m)!             5.0!          5.0!

2.4.3 Sediment!Forebays!
Due!to!the!size!(<2ha)!and!nature!of!the!development!it!is!sediment!forebays!are!not!
required.! Bioretention! areas! should! be! monitored! to! ensure! that! the! deposition! of!
coarse!sediment!on!the!filter!media!surface!does!not!affect!the!bioretention!system!
function.!!
!



!                                                 !                                          ! 11!

Page 18

LEGEND)                                                    Data)Source)Notes:)                            Project:))!71!Seaview!Terrace!Stormwater!Management!Plan!
!              !!                                          Proposed!development!layout!provided!by!TOD!
                                                           ConsulDng!for!use!in!this!invesDgaDon.!        !
!!!!!!!!!!!!!!!!!Roof!Area
               !        !!      !   !BioretenDon!          !                                              !
!              !        !!                                                                                         )Figure)5)WSUD)Strategy!
               !
               !Paved!Areas
                        !!      !   !Site!Catchment!                                                      !
!              !        !!                                                                                Date:)4/05/16 !!
               !
               !Grassed!Areas
                        !!      !   !External!Catchment!                                                  Drawn)by:)KM!
               !        !!
               !        !!
               !        !!
               !        !!


[OCR of page images]
 

LEGEND Data Source Notes:
Proposed development layout provided by TOD

Roof Area || Bioretention Consulting for use in this investigation.

Figure 5 WSUD Strategy
Paved Areas [] Site Catchment

Date: 4/05/16
Grassed Areas External Catchment Drawn by: KM

Project: 71 Seaview Terrace Stormwater Management Plan

 

Page 19

   !


   2.5 Results!
   MUSIC! modelling! of! the! proposed! treatment! train! for! the! residence! at! 71! Seaview!
   Terrace! at! Sunshine! Beach,! was! performed! to! ensure! the! identified! load! based!
   Water! Quality! Objectives! were! achieved.! ! Table! 6! presents! the! loadTbased! outputs!
   generated! by! the! development.! Unmitigated! loads! are! reported! based! on! the!
   assumption! that! the! proposed! residence! has! a! green! type! roof.! ! Mitigated! loads!
   include!the!bioretention!gardens,!stormwater!tank!and!reuse.!
   !
   Table!6:!MUSIC!Results!–!LoadbBased!Pollutant!Outputs!

                                                  Reduction!
                                                                     Target!
Pollutant!    Unmitigated!!      Mitigated!!      Achieved!!!!!                      Compliance!
                                                                    Reduction!
                                                     (%)!
  Flow!           1.74!               1.55!           10.9!             T!                b!

  TSS!            318!                62.5!           80.4!            80%!               !!

   TP!           0.598!               0.212!          64.5!            60%!               !!

   TN!            3.16!               1.55!           50.8!            45%!               !!

   GP!            29.6!                 0!            100!             90%!               !!
   !
   !
   !
   !                              !




   !                                              !                                            ! 13!

Page 20

!


3 Stormwater!Quantity!
The!objective!of!this!component!of!the!study!is!to!investigate!the!potential!impact!
that! the! proposed! development! will! have! on! peak! flows! discharging! from! the! site.!!
Where! any! increases! of! peak! flows! are! found,! potential! mitigation! options! will! be!
investigated!in!the!form!of!a!detention!system.!!!
Hydrologic!modelling!of!the!catchment!has!been!carried!out!using!WBNM!software!
developed! jointly! by! the! University! of! Wollongong,! Rienco! Consulting! and! Balance!
R&D.! ! The! 2012! version! has! been! used! for! this! investigation.! ! A! peak! flow! rational!
method!calibration!has!also!been!carried!out.!
Modelling! has! been! carried! out! for! the! 2,! 5,! 10,! 20,! 50! and! 100! year! ARI! storm!
events.!!The!following!scenarios!have!been!investigated:!
        1.      Existing!Scenario!
        2.      Developed!Scenario!–!conventional!roof!(100!%!impervious)!
        3.      Mitigated!Scenario!
A! conventional! impervious! roof! type! was! modelled! in! order! to! conservatively!
quantify! the! likely! impact! the! ‘green’! roof! may! have! on! peak! flow! generated! from!
the!site.!!It!is!recognized!that!while!the!roof!will!be!covered!with!up!to!200!mm!of!
planted!media!it!will!not!act!entirely!as!a!catchment!with!0%!impervious!fraction.!!In!
reality,! the! peak! flows! generated! from! the! green! roof! will! likely! fall! between! a!
partially!impervious!catchment!and!a!fully!impervious!catchment.!!!

3.1     Site!Drainage!and!Catchment!Definition!
The! site! is! relatively! steep! with! runoff! flowing! in! a! north! easterly! direction!
predominately!as!sheet!flow!with!limited!channel!delineation.!As!noted!above!there!
is! an! external! catchment! to! the! west,! consisting! of! two! existing! residential!
allotments!on!McAnally!Drive,!which!currently!drains!through!the!site.!!!
There!is!an!existing!gully!and!drainage!line!located!to!the!north!of!the!site!boundary!
which!conveys!stormwater!from!the!outlet!at!the!turnaround!on!McAnally!Drive,!the!
national! park! and! likely! receives! flow! from! the! subject! site.! ! The! drainage! line!
appears!to!cross!the!site!at!the!northeastern!corner.!!
For!the!purposes!of!this!investigation!it!is!assumed!that!all!site!runoff!flows!across!
the! northern! boundary! and! for! calculation! of! nonTworsening! peak! flows! will! be!
measured!at!the!outlet!of!the!site!subTcatchment!at!the!boundary.!
SubTcatchments! delineated! for! the! WBNM! model! have! been! based! on! detailed!
survey!and!existing!contour!details!provided!for!the!site.!!The!WBNM!subTcatchment!
layout!is!shown!in!Figure!6.!!The!WBNM!model!has!been!split!into!4!subTcatchments!
in! order! to! represent! the! site.! The! external! catchment! to! the! west! of! the! site! has!
been!included!in!the!model!as!runoff!from!the!area!would!be!directed!through!the!
site!but!not!flow!into!the!proposed!developed!area.!A!small!portion!of!the!site!at!the!
north!western!corner,!which!is!proposed!not!to!be!developed,!flows!off!site!to!the!
north!and!has!not!been!included!in!modeling.!




!                                                 !                                              ! 14!

Page 21

!


3.2      Existing!Scenario!
SubTcatchment! fraction! impervious! values! have! been! calculated! based! on! aerial!
imagery! data.! ! The! existing! scenario! subTcatchment! areas! and! fraction! impervious!
values!for!each!subTcatchment!are!tabulated!below!in!Table!7.!
!
Table!7:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Existing!Scenario!
                                                                           Existing!Scenario!!
    WBNM!SubbCatchment!                         Area!(ha)!
                                                                            Impervious!(%)!
              External!                          0.2856!                           75!
                  C1!                            0.2265!                           0!
                  C2!                            0.3490!                           0!
                  C3!                            0.3173!                           0!
              TOTAL!                             1.1784!                           !
!
The!WBNM!model!has!been!calibrated!to!Rational!Method!derived!peak!flows!at!the!
catchment!outlet.!!Details!of!the!Rational!Method!calibration!are!provided!in!Section!
3.3.!
The! WBNM! model! has! been! calibrated! by! adjusting! the! WBNM! catchment! lag!
parameter.!!The!value!of!the!catchment!lag!parameter!adopted!for!the!investigation!
is!1.49,!which!is!within!the!accepted!range!of!values!provided!in!the!WBNM!technical!
reference!manual.!The!rainfall!loss!rates!adopted!for!this!investigation!are!initial!and!
continuing!losses!of!0!mm!and!2.5!mm!for!pervious!areas,!and!0!mm!and!0!mm!for!
impervious!areas,!respectively.!
WBNM!modelling!has!been!carried!out!for!the!range!of!standard!design!ARI!events!
ranging!from!2!year!up!to!100!years.!!Modelling!has!also!been!carried!out!for!the!full!
range! of! standard! design! event! storm! durations! ranging! from! 15! minutes! up! to! 3!
hours.!!Peak!flows!tabulated!in!this!report!represent!the!peak!values!extracted!from!
this!range!of!storm!events.!!
Table!8:!!Existing!Scenario!WBNM!Outlet!Peak!Flows!

                          2yr!ARI!   5yr!ARI!      10yr!ARI!   20yr!ARI!    50yr!ARI!    100yr!ARI!
    Catchment!                       (m3/s)!
                          (m3/s)!                   (m3/s)!     (m3/s)!      (m3/s)!      (m3/s)!
      External!            0.124!    0.153!          0.17!      0.193!       0.201!        0.222!
        C1!               0.188!      0.24!           0.27!     0.311!        0.329!       0.365!
        C2!               0.111!     0.147!          0.167!     0.195!        0.208!       0.233!
        C3!               0.102!     0.135!          0.154!      0.18!        0.191!       0.214!
      Outlet!             0.298!     0.387!          0.437!     0.506!        0.536!       0.598!

!




!                                                     !                                             ! 15!

Page 22

!


3.3       Rational!Method!Calibration!
The! existing! scenario! WBNM! model! has! been! calibrated! to! the! Rational! Method!
derived!peak!flows!at!the!outlet!of!the!catchment!draining!to!northern!boundary!of!
the!site!(WBNM!catchment!node!‘Outlet’).!!The!adopted!calibration!parameters!are!
detailed!in!the!Section!3.1.!
A!summary!of!the!Rational!Method!calculation!input!parameters!is!provided!below!
in!Table!9!and!additional!details!of!the!Rational!Method!calculation!are!provided!in!
Appendix!1!of!this!report.!
Table!9:!Rational!Method!Calibration!Summary!(Total!Catchment)!

              Parameter!                                               Value!
              Time!of!Concentration!(tc)!                              6!min!
              Catchment!Area!                                        1.1784!ha!
              C10!Value!                                               0.48!
              100!year!Rainfall!Intensity!                          302.7!mm/hr!
!
A! comparison! of! peak! Rational! Method! flow! rates! compared! with! peak! WBNM!
model!flow!rates!are!provided!in!Table!10!below.!
Table!10:!Rational!Method!Peak!Flows!Versus!WBNM!Peak!Flows!!

                      2yr!ARI!      5yr!ARI!   10yr!ARI!   20yr!ARI!     50yr!ARI!   100yr!ARI!
    Catchment!                      (m3/s)!
                      (m3/s)!                   (m3/s)!     (m3/s)!       (m3/s)!     (m3/s)!
      Rational!         0.24!         0.3!       0.33!       0.42!         0.54!       0.62!
      WBNM!            0.298!       0.387!      0.437!      0.506!        0.536!       0.598!
    %!Difference!       19%!         22%!        24%!        17%!          T1%!        T4%!
!
The!above!results!show!that!a!reasonable!peak!flow!calibration!has!been!achieved,!
particularly!for!the!larger!events!of!the!WBNM!model!when!compared!to!a!Rational!
Method! calculation.! ! The! WBNM! model! estimates! slightly! lower! peak! flows! in! the!
smaller! events,! however,! this! would! be! considered! acceptable! in! assessing! nonT
worsening!of!flows.!

3.4       Developed!Scenario!
The! proposed! development! has! been! incorporated! into! the! WBNM! model! by!
adjusting! the! site! subTcatchments! and! the! fraction! impervious! values.! ! Fraction!
impervious! values! of! the! existing! and! proposed! scenarios! are! provided! in! Table! 11!
below.!!The!modelled!development!case!adopts!conventional!impervious!fractions!as!
a! conservative! estimate.! The! developed! scenario! WBNM! model! layout! is! shown! in!
Figure!6!of!this!report.!!!
The! developed! catchments! have! been! modified! to! reflect! the! altered! water!
management! strategy! for! the! site.! ! This! modification! was! undertaken! in! order! to!
address! Items! 1! and! 3! of! the! OPW! RFI! (NSC! 5! April! 2016)! and! differs! from! that!
proposed! in! the! original! OPW! application! (AquaIntel,! RevB,! January! 2016).! ! The!



!                                                 !                                             ! 16!

Page 23

!


existing!case!natural!catchment!divide!was!determined!to!fall!approximately!through!
the! centre! of! the! proposed! building! (Figure! 6).! ! As! such! and! in! order! to! maintain!
outlet! of! stormwater! runoff! into! the! predevelopment! drainage! pathways! it! is!
proposed! that! the! development! outlet! stormwater! runoff! into,! as! far! as! practical,!
the!same!drainage!pathways!as!the!predevelopment!case.!!!
!
Table!11:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Developed!Scenario!
                                                 Developed!Scenario!
                                                                             Existing!Scenario!
     WBNM!SubbCatchment!            Area!(ha)!     b!Conventional!
                                                                              Impervious!(%)!
                                                   Impervious!(%)!
               External!              0.288!             75!                        75!
            D1c!                      0.155!                  0!                     0!
        D1a_Driveway!                 0.026!                 100!                    0!
      Green_Roof_North!               0.016!                 100#!                   0!
      Green_Roof_South!               0.048!                 100 ! #                 0!
       Lower_A_North!                 0.009!                  0!                     0!
       Lower_A_South!                 0.015!                  0!                     0!
          Lower_B!                    0.057!                  48!                    0!
            Roof!                     0.022!                 100!                    0!
             C3!                      0.317!                  0!                     0!
                Total!                1.175!                   !                      !
#!It!is!noted!that!while!this!area!is!proposed!to!be!green!roof!it!is!modelled!for!the!
purposes! of! analysis! of! potential! increase! in! peak! flow! from! the! development! as!
100%!impervious.!
Peak! flows! tabulated! in! this! report! represent! the! peak! values! extracted! from! the!
modelled!range!of!storm!events.!!
Table!12:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!1!

                                     Developed!
                 Existing!Peak!                            Change!in!Peak!   %!increase!in!Peak!
!!                Flow!(m3/s)!
                                  Conventional!Peak!
                                                            Flow!(m3/s)!            Flow!
                                     Flow!(m3/s)!

     2!year!          0.19!             0.19!                      0.00!            0%!
     5!year!          0.24!             0.25!                      0.01!            1%!
    10!year!          0.27!             0.28!                      0.01!            1%!
    20!year!          0.31!             0.32!                      0.01!            1%!
    50!year!          0.33!             0.33!                      0.00!            0%!
100!year!             0.37!             0.37!                      0.00!            0%!
!
!
!
!



!                                                      !                                           ! 17!

Page 24

!

Table!13:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!2!

                                       Developed!
                  Existing!Peak!                             Change!in!Peak!     %!increase!in!Peak!
!!                 Flow!(m3/s)!
                                    Conventional!Peak!
                                                              Flow!(m3/s)!              Flow!
                                       Flow!(m3/s)!

     2!year!          0.11!               0.13!                   0.02!                 15%!
     5!year!          0.15!               0.17!                   0.02!                 12%!
 10!year!             0.17!               0.19!                   0.02!                 10%!
 20!year!             0.20!               0.22!                   0.02!                 9%!
 50!year!             0.21!               0.23!                   0.02!                 9%!
100!year!             0.23!               0.26!                   0.02!                 8%!
!
It!can!be!seen!that!the!peak!flows!have!increased!to!the!catchment!outlets.!!This!is!a!
result! of! the! development! increasing! the! impervious! area.! ! Mitigation! within! the!
catchment! will! be! required.! ! In! order! to! achieve! a! conservative! outcome! and!
recognizing! that! the! ‘green’! roof! will! not! act! entirely! as! a! catchment! with! a! 0%!
impervious!fraction!sizing!of!detention!infrastructure!was!undertaken!based!on!the!
developed!scenarios!with!the!conventional!roof!structure.!

3.5            Mitigated!Scenario!
When!comparing!the!peak!flows!in!the!existing!and!developed!scenarios,!increases!
in!the!peak!discharge!occur!at!the!catchment!outlets.!!As!a!result!a!realignment!of!
discharge! locations! has! been! undertaken,! as! described! previously.! ! Detention! will!
occur!from!the!driveway!via!the!combined!detention!and!bioTretention!basin,!flows!
from! the! hard! roof! will! be! captured! initially! in! the! 25! kL! Rainwater! Tank,! with!
overflows!to!the!25!kL!Stormwater!Tank,!with!low!flow!outlet!pipes!reducing!volume!
release!and!velocity!rates.!!The!Rainwater!Tank!will!not!serve!as!detention!storage.!!
Runoff!from!the!northern!half!of!the!green!roof!will!be!directed!primarily!onto!lawns!
to! create! sheet! flow! prior! to! exiting! into! the! natural! bushland.! ! Runoff! from! the!
southern!half!of!the!green!roof!will!be!directed!to!the!25!kL!Stormwater!Tank.!!The!
mitigated!scenario!is!detailed!in!Figure!7.!
Table!14:!Storage!and!Outlet!Details!of!Detention!System!

                                                                                       Peak!100!yr!
                          Storage!       Storage!Height!
Catchment!                                                     Outlet!Dimensions!      Water!Depth!
                        Volume!(m3)!          (m)!
                                                                                          (m)!
                                                                1!x!50mm!at!the!
                                                              base!of!the!tank!plus!
      SW!Tank!!               25!             2.0!                                         1.97!
                                                               1!x!100mm!IL!0.9m!
                                                                   above!base!
                                                              2!x!225!mm!at!1.775!
      Rainwater!
                              25!             2.0!            from!the!base!of!the!        2.0!
        Tank!
                                                                      tank!
      Driveway!
                                                              5m!weir!plus!50mm!
      Detention!              7!              0.7!#!                                      0.704!
                                                                   outlet!
        Basin!


!                                                        !                                             ! 18!

Page 25

!

#! Measured! from! top! of! Bioretention! Extended! Detention! zone.! Total! depth! of! combined!
bioretention!and!detention!storage!is!1!m!above!planted!filter!media.!
All! modeling! parameters! remain! consistent! between! the! developed! and! mitigated!
scenarios,! with! the! addition! of! the! stormwater! and! rainwater! tanks! and! detention!
basin.!
A! comparison! of! the! peak! flows! between! the! existing,! developed! and! mitigated!
scenarios! are! presented! below! in! Table! 15and! Table! 16.! ! It! can! be! seen! that! nonT
worsening!of!peak!flows!are!achieved!at!each!outlet!to!the!site.!!
!
Table!15:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!1!

                   Existing!Peak!     Developed!Peak!      Mitigated!Peak!     Change!in!Peak!
        !           Flow!(m3/s)!        Flow!(m3/s)!        Flow!(m3/s)!        Flow!(m3/s)!
     2!year!            0.19!               0.19!               0.19!                0.00!
     5!year!            0.24!               0.25!               0.24!                0.00!
    10!year!            0.27!               0.28!               0.27!                0.00!
    20!year!            0.31!               0.32!               0.31!                0.00!
    50!year!            0.33!               0.33!               0.33!                0.00!
    100!year!           0.37!               0.37!               0.36!               T0.01!
!
!
Table!16:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!2!
                   Existing!Peak!     Developed!Peak!      Mitigated!Peak!     Change!in!Peak!
        !           Flow!(m3/s)!        Flow!(m3/s)!        Flow!(m3/s)!        Flow!(m3/s)!
     2!year!            0.11!              0.13!                0.11!              0.00!
     5!year!            0.15!               0.17!               0.15!                0.00!
    10!year!            0.17!               0.19!               0.17!                0.00!
    20!year!            0.20!               0.22!               0.20!                0.00!
    50!year!            0.21!               0.23!               0.21!                0.00!
    100!year!           0.23!               0.26!               0.23!                0.00!
!
!                                !




!                                                   !                                            ! 19!

Page 26

LEGEND)                                            Data)Source)Notes:)                                   Project:))!71!Seaview!Terrace!Stormwater!Management!Plan!
!                                                  Proposed!development!layout!provided!by!TOD!
                                                   Consul>ng!for!use!in!this!inves>ga>on.!               !
      !Exis>ng!Catchment!    !   !Drainage!line!   Hydraulic!design!provided!by!FLOTH!for!use!in!this!   !
      !!                                           inves>ga>on!                                          )))))))))Figure)6))Catchment)Plan)
      !Developed!Catchment   !   !Deten>on!area!   !                                                     !
      !        !!                                                                                        Date:)29/01/15!
      !Sheet!flow      !      !   !Overflow!                                                               Drawn)by:)KM!


[OCR of page images]
 

 

LEGEND

Existing Catchment

| Developed Catchment

——-> Sheet flow

—> Drainage line

im Detention area

—S> Overflow

 

Data Source Notes:

Proposed development layout provided by TOD
Consulting for use in this investigation.

Hydraulic design provided by FLOTH for use in this
investigation

Project: 71 Seaview Terrace Stormwater Management Plan

Figure 6 Catchment Plan

Date: 29/01/15
Drawn by: KM

And

aquaintel

 

Page 27

!


!
!
!




                                        !
!
Figure!7:!Detention!Strategy!

!                               !




!                                   !   ! 21!


[OCR of page images]
aquaintel

 

 

Hard Roof Driveway External

Catchment
Grassed and Pool Area Green Roof Sth [Green RoofNth | > \
Bio Basin

 

 

 

 

 

 

 

 
    
    

 

     
   
 
  

 

 

 

Design by (5 m?— 300 mm ED;
others 400 mm filter media;
onan fawa Nitti Lower Lawn Nth } 100 mm dia. outlet) }

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

T
1
1
1
1
1
1
1
! Design by Design by I
' jj others ¥ others \ 1
1 Rainwater Tank \ '
1 25 m' volume — \

Bio Basin 1 2x 225mm; | sag Liday reuse) \ !
(12 m?-300mmED {A R775 AL \ '
above finished surface; }1 ‘ 1
400 mm filter media;) 3% \ 1
No Detention ! \ 1

1 1
1.x 100 mm dia; 1 1x50 mm; IL 0.0 RL from base return to sheet" ! '
IL -0.4 RL from 1 1x 100 mm dia; IL 0.9 RL from base flow prior to 1 I
finished surface 1 Outlet down hill environmental line \ ' 1
Outlet down hill ¥ , ¥ 4 v

Outlet 2 (Sth) Outlet 1(Nth)
Receiving Environment

 

 

 

 

Figure 7: Detention Strategy

 

 

 

21

Intelligent Water Management Solutions

Page 28

!


4 Detailed!Design!Documentation!
Detailed! design! documentation! has! been! prepared! by! TOD! Consulting! Engineers.!!
The! detailed! design! documentation! for! the! bioretention! systems! were! prepared! in!
accordance! with! the! “Bioretention! Technical! Design! Guidelines! –! Version! 1”!
(WaterbyDesign,!October!2012).!!!
Outlet! pipework! from! the! lower! bioretention! basin! and! Stormwater! Tank! is! to! be!
piped!below!RL!26!and!outlet!via!a!spreader.!!Calculation!of!level!spread!length!has!
been!undertaken!using!the!International!Erosion!Control!Association!Guidelines!and!
are!as!follows!in!Table!17.!
!
Table!17:!!Level!Spreader!Calculations!



!!                                         Value!                     Reference!


        100!yr!ARI!Peak!Flow!(m3/s)!       0.22!
                                                                            !
                                                       Table!1!–!IESA!Level!Spreader!Fact!Sheet!
Max!Allowable!Discharge!Velocity!(m/s)!     0.9!
                                                                Poor!Soils;!>20%!grade!
                                                       Table!2!–!IESA!Level!Spreader!Fact!Sheet!
          Sill!Length!(m!per!m3/s)!        19.4!
                                                                      25%!grade!
     Minimum!Calculated!Sill!Length!(m)!    4.3!
                                                                           !
!
!                                     !




!                                                  !                                           ! 22!

Page 29

!


5 Bioretention!Maintenance!Manual!
The!owner!(or!tenant)!of!the!site!will!be!the!asset!custodian!and!be!responsible!for!
maintenance!of!the!bioretention!system.!!The!asset!custodian!will!need!to!undertake!
onTgoing! maintenance! of! the! water! quality! devices.! ! Maintenance! for! the!
bioretention!basins!may!involve!the!following:!
    1.   Scheduled!inspections;!
    2.   Removal!of!noxious!plants!or!weeds;!
    3.   Maintaining!the!desired!vegetation;!!
    4.   Repairing!erosion;!
    5.   Unblocking!inlets!and!outlets;!
    6.   Removing!litter!and!debris;!
    7.   Managing!algal!or!moss!growth;!and!
    8.   Maintaining!the!permeability!of!the!filtration!media.!
To! assist! the! owner! (or! tenant)! with! the! onTgoing! maintenance! of! the! stormwater!
quality!devices!being!installed!onTsite,!a!Bioretention!Maintenance!Manual!has!been!
developed!and!is!provided!in!Appendix!4.!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!




!                                              !                                           ! 23!


[OCR of page images]
a

aquaintel

5 Bioretention Maintenance Manual

The owner (or tenant) of the site will be the asset custodian and be responsible for
maintenance of the bioretention system. The asset custodian will need to undertake
on-going maintenance of the water quality devices. Maintenance for the
bioretention basins may involve the following:

1.

NouwFYWwD

8.

Scheduled inspections;

Removal of noxious plants or weeds;

Maintaining the desired vegetation;

Repairing erosion;

Unblocking inlets and outlets;

Removing litter and debris;

Managing algal or moss growth; and

Maintaining the permeability of the filtration media.

To assist the owner (or tenant) with the on-going maintenance of the stormwater
quality devices being installed on-site, a Bioretention Maintenance Manual has been
developed and is provided in Appendix 4.

23

Page 30

!


6 Water!Quality!Monitoring!

6.1       Construction!
The! management! of! the! site! during! the! construction! phase! is! an! important! step! in!
ensure! water! quality! standards! are! achieved.! ! Implementation! of! best! practice!
Erosion! and! Sediment! Control! techniques! is! imperative! to! managing! the! quality! of!
runoff!affected!by!construction!works.!!!
The! following! points! provide! general! guidance! on! the! management! of! stormwater!
during!the!construction!phase.!!Detailed!Erosion!and!Sediment!Control!Management!
Plans!should!be!provided!during!the!operation!works!application!stage!in!accordance!
with!Council’s!Maroon!Manual!T!“Manual!for!Erosion!and!Sediment!Control”.!
      1. Establish!a!single!stabilised!entry/exit!point!for!the!site!works;!!
      2. Construct! a! shakeTdown! grid! at! the! entrance! to! facilitate! the! removal! of!
         sediment! from! trucks! leaving! the! site.! The! access! road! extending! from! the!
         end!of!existing!road!or!kerb!to!the!grid!should!comprise!a!150T200!mm!deep!
         pad!of!40!mm!crushed!rock;!!
      3. Install!sediment!fences!along!the!lower!boundaries!of!the!site;!
      4. Install!bins!and/or!windTproof!litter!areas!onTsite!to!minimise!the!dispersion!
         of!gross!pollutants;!!
      5. Maintain! on! site! spare! materials! necessary! for! the! emergency! repair! of! all!
         erosion! control! devices.! This! includes! silt! fences,! clean! crushed! rock! for!
         reapplication! to! the! entrance! road! and! for! replacement! of! rock! within!
         temporary!drainage!channels;!!
      6. Following! each! day’s! construction! works,! ensure! that! any! material! on! road!
         surfaces!is!swept!from!the!road,!and!not!permitted!to!be!washed!down!the!
         gutters!and!piped!drainage!systems.!
      7. Final! establishment! of! any! bioretention! basin! should! not! occur! until! full!
         stabilisation! of! the! upstream! catchment! has! occurred;! preferably! these!
         should! be! temporarily! turfed! during! the! maintenance! period! while! dwelling!
         construction!is!occurring.!
      !
It!shall!be!the!responsibility!of!the!developer,!through!their!principal!contractor,!to!
ensure!that!temporary!sediment!and!erosion!controls!are!installed!and!maintained!
correctly.!!

6.2       Operational!
Water! quality! monitoring! of! the! bioretention! system! is! not! proposed! for! the!
operational! phase.! ! The! “Maintaining! Vegetated! Asset”! guideline! highlights! that!
water! quality! monitoring! is! not! recommended! to! determine! the! performance! of!
every! vegetated! stormwater! asset,! as! it! is! a! specialized! field! that! is! complex! and!
costly.!!In!line!with!this!guideline!the!onTgoing!monitoring!of!water!quality!from!this!
device!is!not!considered!necessary!considering!the!small!size!of!the!development.!


!                                                 !                                            ! 24!

Page 31

!


7 Conclusions!
It! can! be! seen! from! the! results! presented! in! Table! 6! that! the! treatment! train!
proposed! for! the! development! achieves! the! performance! criteria! set! by! the! NSC.!!
Annual! Load! Reductions! of! Total! Suspended! Solids! (TSS),! Total! Nitrogen! (TN)! and!
Gross!Pollutants!(GP)!have!been!met.!!
A! detention! system! consisting! of! a! Stormwater! Tank! and! a! detention! basin! is!
proposed!on!the!site!in!order!to!achieve!Council’s!nonTworsening!criteria.!Table!15!
and!Table!16!provides!a!comparison!of!the!peak!existing,!developed!and!mitigated!
flows.!!It!can!be!seen!that!whilst!peaks!flows!increase!under!the!developed!scenario!
in! Catchment! 2,! the! modelled! detention! tank! ensures! nonTworsening! is! achieved.!!
Similarly! the! inclusion! of! the! small! detention! basin! at! the! northern! end! of! the!
driveway! ensures! that! the! peak! flows! within! Catchment! 1! are! mitigated! to! preT
development!condtions.!
This! plan! demonstrates! that! effective! treatment! of! stormwater! generated! by! the!
proposed!development!can!be!achieved!through!the!integration!of!Water!Sensitive!
Urban! Design! (WSUD)! principles.! ! Through! the! incorporation! of! bioretention!
gardens,!reuse!and!detention!system,!the!plan!successfully!demonstrates:!
    •   Compliance!with!the!requirements!of!NSC’s!Water!Quality!Objectives;!
    •   Ecological!sustainability!in!terms!of!the!development’s!impact!upon!receiving!
        waters;!!
    •   Compliance!with!NSC!nonTworsening!of!peak!flows!in!the!2,!5,!10,!20,!50!and!
        100!year!ARI!storm!events!(Development!Condition!28a);!and!!
    •   Addresses!concerns!raised!in!the!NSC!RFI!(dated!5!April!2016).!

!
!
!                              !




!                                              !                                           ! 25!

Page 32

!


8 References!
!
!
1.   WaterbyDesign!(2012),!“Maintaining!Vegetated!Assets”.!
     !
2.   WaterbyDesign!(2012),!“Bioretention!Technical!Design!Guidelines”.!
     !
3.   WaterbyDesign!(2010),!“MUSIC!Modelling!Guidelines”.!
     !
4.   Sunshine!Coast!Council!(2008),!“Manual!for!Erosion!and!Sediment!Control!–!
     Maroon!Manual”.!
!
5.   Noosa!Council!Council!(2006),!“The!Noosa!Plan”.!
!
6.   Healthy! Waterways! (June! 2006),! “Water! Sensitive! Urban! Design! Technical!
     Design!Guidelines!for!South!East!Queensland”.!
!
7.   Queensland! Government! –! Natural! Resources! and! Water! (2007),!
     “Queensland!Urban!Drainage!Manual!–!Volume!1!2nd!Edition”.!
!
8.   Queensland!Government!(2014),!State!Planning!Policy!
     !
     !
!
!




!                                         !                                        ! 26!


[OCR of page images]
we

aquaintel

References

WaterbyDesign (2012), “Maintaining Vegetated Assets”.
WaterbyDesign (2012), “Bioretention Technical Design Guidelines”.

WaterbyDesign (2010), “MUSIC Modelling Guidelines”.

Sunshine Coast Council (2008), “Manual for Erosion and Sediment Control —
Maroon Manual”.

Noosa Council Council (2006), “The Noosa Plan”.

Healthy Waterways (June 2006), “Water Sensitive Urban Design Technical
Design Guidelines for South East Queensland”.

Queensland Government -— Natural Resources and Water (2007),
“Queensland Urban Drainage Manual - Volume 1 2"4 Edition’.

Queensland Government (2014), State Planning Policy

26

Page 33

!


!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
Appendix!1:!OPW!Drawings!
!
!
!                  !




!                           !   !   !


[OCR of page images]
7

aquaintel

Appendix 1: OPW Drawings

Intelligent Water Management Solutions

Page 34

                                                                                                                                                                                                   INSTALL URETEK GROUT ALONG THIS BOUNDARY TO A DEPTH OF 2.5m BELOW THE EXISTING SURFACE




                                                                                       290 BLOCKWORK RETAINING WALL ON
                                                                                       FOOTINGS SUPPORTED BY SCREW PILES
                                                                                       AS SHOWN. REFER DETAILS ON
                                                                                       STRUCTURAL DRAWING SET SHEET S21.

                                                     RV1                                                                                                                                                                                                                                                                                                                                                                                                                    INSTALL CONCRETE PILES
                                                                                                                                                                                                                                                                                                                                                                                                                          PILING RIG                                        TO RL 51.00
                                                                                                                                                                               SITE TEMPORARY ACCESS :
                                     A                                                                                                                                            ESTABLISH SITE SURVEY MONITORING                                                                                                   290 BLOCKWORK RETAINING
                                     -         RV1
                                                                                                                                                                                   POINTS AND ISSUE SURVEY TO ENGINEER.
                                                                                                                                                                                  COMPLETE PRE CONSTRUCTION
                                                                                                                                                                                                                                                                                                                      WALL ON FOOTINGS
                                             RV1                                                                                                                                   INSPECTIONS AND DILAPIDATION REPORTS                                                                                               SUPPORTED BY SCREW                       ROOF RL 52.55

                                                           RT
                                                                                                                                                                                   FOR ADJACENT STRUCTURES, POOLS,                                                                                                    PILES AS SHOWN.
                                     RV1                                                              FILL WORKING
                                                                                                                                                                                   FENCES AND PATHS.
                                                                      RT                              PLATFORM TO RL 49.30                                                                                                          ROOF RL 52.55
                                                            RV1                                                                                                                STAGE 1 PROCEDURE :




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 2.5m MIN
                                                                                                      AFTER WALL




                                                                                                                                                                                                                                                                                                                                                                                                                                                                 URETEK
                                                                                                                                                                                  STRIP AND LEVEL AT SITE ENTRANCE TO
                                                                                                      INSTALLATION                                                                 FORM TEMPORARY TRACK                                                                                                                                                        LEVEL 2 RL 49.55
                                     RV1                                                                                                                                          INSTALL BOTH VERTICAL AND RAKING
                                                                                                                                                                                   SCREW PILES                                                                                                                        FILL WORKING
                                                                                                                                                                                  INSTALL 290 BLOCK RETAINING WALL AND                                                                                                                                                                                                                                                     WORKING PLATFORM STEEL
                                                                                                                                                                                   FILL TO FORM A WORKING PLATFORM.                 LEVEL 2 RL 49.55                                                                  PLATFORM TO RL 49.30
                                                                                                                                                                                  LOCALLY STABILISE ADJACENT FOOTINGS                                                                                                AFTER WALL                                                                                                                                            PLATES SUPPORTED ON
                                                                                                      MAXIMUM 1:2 BATTER                                                           TO BLOCK WALLS AND FENCES. MONITOR                                                                                                 INSTALLATION                                                                                                                                          STEEL BEAMS AS REQUIRED,
                                                                                                      SLOPE.                                                                       ADJACENT STRUCTURES, WALLS AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            SPANNING BETWEEN
                                                                                                                                                                                   GROUND LEVELS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            SCREW PILES.
                                                                                                                                                                                                                                                                                                                                                                LEVEL 1 RL 45.00


                                                                                                                                                                                                                                                                                                                      MAXIMUM 1:2 BATTER                                                                                                                                    RL VARIES. REFER PLAN
                                                                                                                                                                                                                                     LEVEL 1 RL 45.00                                                                 SLOPE.                                 INSTALL CONCRETE
                                                                                                                                                                                                                                                                                                                                                             PILES TO RL 49.10


                                               EARTHWORKS - STAGE 1                                                                                SCREW PILES :                                                                                                                                                                                               BASEMENT RL 40.80
                                                            1:200 UNREDUCED AT A3
                                                            1:100 UNREDUCED AT A1                                                                  RV1          219 x 8.2 GALV AND EPOXY PAINTED SCREW PILE
                                                                                                                                                              MINIMUM 8m DEEP 30T SWL. CONC. FILL (25 MPa)
                                                                                                                                                                                                                                                                                                                                                                                   RL 40.00
                                                                                                                                                   RV2          219 x 12.7 GALV AND EPOXY PAINTED SCREW PILE
                                                                                                                                                              MINIMUM 6m DEEP 60T SWL. CONC. FILL (25 MPA)                                                                 SECTION                     A   STAGE 1
                                                                 WORKING PLATFORM STEEL
                                                                                                                                                                                                                                                                           1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                       -
                                                                                                                                                   RT          RAKING AT 1 IN 2.75 - 219 x 8.2 GALV AND EPOXY PAINTED SCREW PILE                                           1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                                                                              SECTION                      B           STAGE 2
                                                                 PLATES SUPPORTED ON                                                                          MINIMUM 12m LONG SWL = 60T TENSION. CONC. FILL (25 MPA)
                                                                 STEEL BEAMS AS REQUIRED,
                                                                                                                                                                                                                                                                                                                                                                                              1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                                                                                              1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                                                                                                            -
                                                                 SPANNING BETWEEN                                                                                                                                                                                 B
                                                                 SCREW PILES.                                                                                                                                                                                     -
                                                                                                                                                                                                                                                                                                                                                                               TOP CONCRETE PILES DIMINISHES                                           TOP CONCRETE PILES DIMINISHES
                                                                                                                                           TOP CONCRETE PILES RL 51.00                                                                                                    TOP CONCRETE PILES RL 51.00                  TOP CONCRETE PILES RL 51.00                                 WITH NATURAL SURFACE                                                    WITH NATURAL SURFACE
                                                                                                                                                                   TOE AT RL 45.00                                                                                                    TOE AT RL 44.00                         TOE AT RL 42.00                                          TOE AT RL 41.00                                                         TOE AT RL 42.00




                                                                                                                                                                                                                                                                                                                                                                                              3.0m
                                                                                                                                    2.5m




                                                                                                                                                                                           2.5m




                                                                                                                                                                                                                                                                                                                           TOP CONCRETE                 TOP CONCRETE
                                                                                                                                                                                                                                                                                                                            PILES RL 49.10               PILES RL 49.10
                                                                                                                                    TOP CONCRETE                                                                                                                                                                                                                                                             TOP CONCRETE
                                                                                                                                     PILES RL 49.10                                                                                                                                                                        TOE AT RL 41.00              TOE AT RL 42.00                                       PILES RL 46.50
                                                                                                                                                                                                     TOP CONCRETE PILES RL 49.10
                                                                               10
                                                                               9.




                                                                                                                                    TOE AT RL 38.00                                                          TOE AT RL 40.00                                                                                                                                                                                 TOE AT RL 42.00
                                                                       .00 L 4
                                                                           R
                                                                RL LES




                                                                                                                                                                                                                                                         EARTHWORKS - STAGE 2                                                                            STAGE 2 PROCEDURE :
                                                              AT E PI
                                                                    40




                                                                                                                                                                                                                                                                              1:200 UNREDUCED AT A3
                                                                  T




                                                                                                                                                                                                                                                                              1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                                            INSTALL URETEK GROUT ALONG TOP BOUNDARY TO A DEPTH OF 2.5m MIN
                                                               RE




                                                                                                                                                                                                                                                                                                                                                            GRADUALLY INSTALL TEMPORARY SCREW PILES AND CONSTRUCTION PLATFORM OR A SUITABLE LEVELED PLATFORM FOR
                                                            NC




                                                                                                                                                                                                                                                                                                                                                             CFA PILE RIG.
                                                            E




                                                                                                                                                                                                                                                                                                                                                         
                                                           CO
                                                                TO




                                                                                                                                                                                                                                                                                                                                                             LOCALLY STABILISE ADJACENT FOOTINGS TO BLOCK WALLS AND FENCES. MONITOR ADJACENT STRUCTURES, WALLS AND
                                                                                                                                                                                                                                                                                                                                                             GROUND LEVELS.
                                                        P




                                                                                                                                                                                                                                                                                                                                                            INSTALL 450mm DIAMETER CONTIGUOUS CFA GROUT PILED WALLS AS INDICATED ON PLAN.
                                                      TO




                                                                                                                                                                                                                                                                                                                                                            FORM TABLE DRAIN ALONG WESTERN BOUNDARY TO COLLECT ANY CONCENTRATED STORMWATER FROM ABOVE AND
                                                                                                                                                                                                                                                                                                                                                             ACROSS SITE, DISCHARGING TO APPROVED LOCATION AFTER INSTALLATION OF SEDIMENT / EROSION CONTROL ALL AS
                                                                                                                                                                                                                                                                                                                                                             DETAILED ON THE STORMWATER MANAGEMENT PLAN.




     COPYRIGHT ©                                                                            Associated Consultants                                                    Client                                                                                                                Drawn          Verified         Project                                                                             Drawing Title                                                     Scale           Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                           Brisbane address
                                                                                                                                           GROUND LEVEL
                                                                                                                                                                     UNIVERSAL PROPERTY                                                                                                     A. VENESS
                                                                                                                                                                                                                                                                                            Designed
                                                                                                                                                                                                                                                                                                           S. PRYSTUPA
                                                                                                                                                                                                                                                                                                           Verified
                                                                                                                                                                                                                                                                                                                           PROPOSED NEW RESIDENCE AT                                                           EARTHWORKS PLANS                                                  AS SHOWN A1
agreement between Tod                                                                                                                      283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                           BRISBANE 4000
                                                                                                                                           AUSTRALIA
                                                                                                                                                                     COMPANY                                                                                                                H. GRAY        S. PRYSTUPA     71 SEAVIEW TCE, SUNSHINE BEACH                                                      STAGE 1 AND STAGE 2                                               Drawing Number
                                                                                                 architects
                                                                                                                                                                     ESTABLISHMENT                                                                                                                                                                                                                                                                                               14517-OP22
                                                                                                                                           postal address
used for this specific project.                                                                                                            GPO BOX 353                                                                                                                                      Approved       RPEQ No
                                                                                                 planners                                  BRISBANE                                                                                                                                                                        RDP               RP197117
                                                                                                 interiors                                 QUEENSLAND 4001
                                                                                                                                           AUSTRALIA
                                                                                                                                                                                                                                            Noosa: 07 5449 9600                             S. PRYSTUPA    1137            LOCAL AUTHORITY   NOOSA
This drawing shall not be used           B    30.3.16 ISSUED FOR CONSTRUCTION        A.V.
for construction until marked as                                                                 Noel Robinson Architects Pty Ltd
                                                                                                                                           tel +61(0)7 3229 5266
                                                                                                                                           fax +61(0)7 3221 0796
                                                                                                                                                                                                                            Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                                            Signed         Date            MCU APPROVAL      14/0084                  HORIZ DATUM                                          0      10     20    30     40    50       60          Sheet             Revision
                                                                                                 ABN 62 323 175 502                        [email protected]                                                                              PO Box 61, Noosaville, QLD 4566
                                         A    27.1.16 OPERATIONAL WORKS APPROVAL     A.V.                                                                                                                                                                                                                                  ROL APPROVAL                               VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                 1 of 12              B
                                                                                                                                           www.nrarc.com
'issued for construction' in the                                                                                                                                                                                          [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                                           DECEMBER 2015
                                                                                                 ACN 010 011 720

revision description.                Rev Date Revision Description                  Drawn                                                                                                                                                   ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                           OPW APPROVAL                               RL                  41.410                                MEASUREMENT BAR - INCREMENTS IN mm

Page 35

                                                                                                                                                                                               C
                                                                                                                                                                                                -




                                                                                                                                                                                                                                                                                                                       5
                                                                                                                                                                                                                      0




                                                                                                                                                                                                                                                                                                                     .2
                                                                                                                                                                                                                   .3
                                                                                                                                                                               5
                                                                                     0




                                                                                                                                                                            .3




                                                                                                                                                                                                                                                                                                                   49




                                                                                                                                                                                                                                                                                                                                                                                                                                               RL 46.50
                                                                                                                                                                                                                  49
                                                                                   .4




                                                                                                                                                                       49
                                                                                                                                                                                                                                                                                                                                                               CONSTRUCT AN EARTH RAMP




                                                                                 49
                                                                                               CONSTRUCT A 300 THICK                                                                                                                                                                                                                                           DOWN BETWEEN PILE ROWS
                                                                                               PILE RESTRAINT SLAB




                                                                                                                                                                                                                                                                                                                                                                                                                                                                  REFER BELOW FOR CONTINUATION
                                                                                               REFER STRUCTURAL DRAWING
                                                                                               SET FOR INFORMATION.




                                                                                                                                                                                                                                                                                                               5
                                                                        5




                                                                                                                                                                                                          5




                                                                                                                                                                                                                                                                                                                        25
                                                                                                                                                                                                                                                                                                           2
                                                                     .3




                                                                                                                                                                                                         2




                                                                                                                                                                                                                                                                                                        .4
                                                                                                                                                                                                      .4




                                                                                                                                                                                                                                                                                                                      .4
                                                                   49




                                                                                                                                                                                                                                                                                                     49
                                                                                                                                                                                                     49




                                                                                                                                                                                                                                                                                                                    49
                                                                                             25
                                                                                          .4
                                                                                        49
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                STAGE 3 PROCEDURE :
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        PROGRESSIVELY REMOVE TEMPORARY
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CONSTRUCTION PLATFORM AND
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         CONSTRUCT REINFORCED CONCRETE WALL




                                                                                                                                                                                                                                                                                                                                                                                                                                    RL 46.50
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         HEAD BEAM PILE CAP, ON DOWN HILL SIDE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         OF ACCESS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                
                                                  0




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         INSTALL NEW PILE RESTRAINT SLAB
                                               .3




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        REINSTATE SURFACE PROTECTION AND
                                            49




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SURFACE DRAINAGE TO SOILS BETWEEN
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         BOUNDARY AND NEW WALL, TO AVOID
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         EROSION AND LOCAL SURFACE SAND SLIP.
                                                                     5
                                                                  .3




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        MONITOR ADJACENT STRUCTURES, WALLS,
                                                                49




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         GROUND LEVELS AND SITE MONITORING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SURVEY POINTS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        EXCAVATE BEYOND THE PILE RESTRAINT
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         SLAB TO FORM THE RAMP DOWN TO THE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         LOWER TURNAROUND PLATFORM.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        CUT/FILL PLATFORM AREA AND USE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         TEMPORARY SANDBAG RETAINING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         STRUCTURES TO RETAIN FILL.




                                                                                                                                                                                                                                                         EARTHWORKS - STAGE 3




                                                                                                                                                                                                                                                                                                                                                0
                                                                                                                                                                                                                                                                                                                                              .5
                                                                                                                                                                                                                                                                                                                                            49
                                                                                                                                                                                                                                                                              1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                              1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                                       DENOTES FINISHED CONCRETE SURFACE LEVEL.
                                                   CONSTRUCT A
                                                   300 THICK PILE
                                                   RESTRAINT SLAB


                                                   ROOF RL 52.55




                                                                                                                                                                                                                                                           CONSTRUCT AN EARTH RAMP




                                                                                                                                                                                                                                                                                                                                 RL 46.50
                                                   LEVEL 2 RL 49.55
                                                                                                                                                                                                                                                           DOWN BETWEEN PILE ROWS
                                                                                                                                                                                                                                                                                                                                                        TURNAROUND PLATFORM


                                                                                                                                                                                                                                                                                                                                                                                  CUT
                                                                                                                                                                                            SCREW PILES FROM                                                                                                                                                                             FILL
                                                                                                                                                                                            CONSTRUCTION
                                                                                                                                                                                            PLATFORM TO REMAIN.
                                                                                                                                                                                                                       REFER ABOVE FOR CONTINUATION




                                                   LEVEL 1 RL 45.00


                                                                                                                                                                                       RL VARIES. REFER PLAN




                                                                                                                                                                                                                                                                                                                           RL 46.50
                                                                                                                                                                                                                                                                                                                                                                                                    TEMPORARY RETAINING
                                                                                                                                                                                                                                                                                                                                                                                                    STRUCTURE. VARIES BETWEEN
                                                                                                                                                                                                                                                                                                                                                                                                    1.0m AND 2.0m HIGH. REFER
                                                                                                                                                                                                                                                                                                                                                                                                    DETAIL ON OP30.
                                                   BASEMENT RL 40.80




                                                                      RL 38.00
                                                   POOL PLANT RL 37.25




                                                                                 SECTION                    C                STAGE 3
                                                                                 1:200 UNREDUCED AT A3
                                                                                 1:100 UNREDUCED AT A1
                                                                                                            -                                                                                                                                                                                                         EARTHWORKS - STAGE 3 - CONTINUED
                                                                                                                                                                                                                                                                                                                                                        1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                                                        1:100 UNREDUCED AT A1




     COPYRIGHT ©                                                                                            Associated Consultants                                                 Client                                                                                                                            Drawn                  Verified                    Project                                                     Drawing Title                                                                                       Scale              Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                                    Brisbane address
                                                                                                                                                    GROUND LEVEL
                                                                                                                                                                               UNIVERSAL PROPERTY                                                                                                                    A. VENESS
                                                                                                                                                                                                                                                                                                                     Designed
                                                                                                                                                                                                                                                                                                                                            S. PRYSTUPA
                                                                                                                                                                                                                                                                                                                                            Verified
                                                                                                                                                                                                                                                                                                                                                                       PROPOSED NEW RESIDENCE AT                                    EARTHWORKS PLAN                                                                                     AS SHOWN A1
agreement between Tod                                                                                                                               283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                                    BRISBANE 4000
                                                                                                                                                    AUSTRALIA
                                                                                                                                                                               COMPANY                                                                                                                               H. GRAY                S. PRYSTUPA                71 SEAVIEW TCE, SUNSHINE BEACH                               STAGE 3                                                                                             Drawing Number
                                                                                                                 architects
                                                                                                                                                                               ESTABLISHMENT                                                                                                                                                                                                                                                                                                                                            14517-OP23
                                                                                                                                                    postal address
used for this specific project.                                                                                                                     GPO BOX 353                                                                                                                                                      Approved               RPEQ No
                                                                                                                 planners                           BRISBANE                                                                                                                                                                                                           RDP               RP197117
                                      C   4.5.16     AMENDED AS CLOUDED                              A.V.        interiors                          QUEENSLAND 4001
                                                                                                                                                                                                                                                                                                                     S. PRYSTUPA            1137
This drawing shall not be used
                                                                                                                                                    AUSTRALIA
                                                                                                                                                                                                                                                                        Noosa: 07 5449 9600                                                                            LOCAL AUTHORITY   NOOSA
                                      B   30.3.16 ISSUED FOR CONSTRUCTION                            A.V.                                           tel +61(0)7 3229 5266                                                                               Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                                                                     Signed                 Date                                                                                                          0     10                               20   30   40       50      60          Sheet               Revision
for construction until marked as                                                                                 Noel Robinson Architects Pty Ltd   fax +61(0)7 3221 0796
                                                                                                                                                    [email protected]                                                                                                 PO Box 61, Noosaville, QLD 4566                                                                       MCU APPROVAL      14/0084          HORIZ DATUM
                                                                                                                 ABN 62 323 175 502
                                      A   27.1.16 OPERATIONAL WORKS APPROVAL                         A.V.                                                                                                                                                                                                                                                              ROL APPROVAL                       VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                        2 of 12                  C
                                                                                                                                                    www.nrarc.com
'issued for construction' in the                                                                                                                                                                                                                      [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                                                                            DECEMBER 2015
                                                                                                                 ACN 010 011 720

revision description.                Rev Date Revision Description                                Drawn                                                                                                                                                                 ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                                                                       OPW APPROVAL                       RL               41.410                             MEASUREMENT BAR - INCREMENTS IN mm

Page 36

                                                                                                                                                          DRIVEWAY RESTRAINING SLAB




                                                                                                                                                                                                                                                                                                                                          CONSTRUCT AN EARTH RAMP




                                                                                                                                                                                                                                                                                                                                                                                                                 RL 46.50
                                                                                                                                                                                                                                                                                                                                          DOWN BETWEEN WORKING
                                                                                                                                                                                                                                                                                                                                          PLATFORMS
                                                                                                                                                                                                                                               WORKING PLATFORM AT RL 44.50




                                                                                                                                                                                                                                                                                                               RL 44.50
                                              E
                                             OP25
                                                                 RL UR OW
                                                                     .00 CE
                                                            E RA FO TE




                                                                                         WORKING PLATFORM AT RL 44.50
                                                          TO TU TO CRE


                                                                   40 FA
                                                             AT L S LL




                                                                                                                                                                                                                                                                                     43.00
                                                           NA LES ON
                                                            PI P C




                                                                                                                                                                                                 TOP CONCRE
                                                                                                                                                                                                                    TE PILES RL
                                                                                                                                                                                                                                44.40




                                                                                                                                                                                                                                                                         TE PILES RL
                                                              TO




                                                                                                                                                                                                               TOE AT RL 36
                                                                                                                                                                                                                            .50




                                                                                                                                                                                                                                                                                 .50
                                                                                                                                                                                                                                                                    TOE AT RL 36
                                                 RL 4.3 E
                                               AT L 4 RET




                                                                                                             .40
                                                      .00
                                                    35 0




                                                                                                        RL 44
                                                                                                  PILES
                                                 R C




                                                                                               E
                                          TO ES ON




                                                                                            E T
                                                                                       ONCR          36.50




                                                                                                                                                                                                                                                                 TOP CONCRE
                                                                                                                                                                    ADDITIONAL STAND ALONE
                                                                                 TOP C          T RL
                                           PI P C




                                                                                         TOE A                                                                      PILE TOP RL 44.40
                                             TO




                                                                                                                                                                    TOE AT RL 36.50
                                             L
                                            E




                                                                                                                                                                                                                                                                                                                                                                                             1:2 MAXIMUM BATTER
                                                                                           WORKING PLATFORM AT RL 44.50




                                            STABILISE EMBANKMENT




                                                                                                                                                                                                EARTHWORKS - STAGE 4
                                                                                                                                                                                                                     1:200 UNREDUCED AT A3
                                                                                                                                                                                                                     1:100 UNREDUCED AT A1




                                                                                                                                                                                                    STAGE 4 PROCEDURE :
                                                                                                                                                                                                         EXCAVATE TO FORM THE RAMP DOWN TO
                                                                                                                                                                                                          THE NEXT WORKING PLATFORM AT RL 44.50.
                                                                                                                                                                                                         CUT FOR PLATFORM AREA ALONG
                                                                                                                                                                                                          PREVIOUSLY INSTALLED PILED WALL.
                                                                                                                                                                                                         INSTALL PROPOSED PILES AT THIS LEVEL
                                                                                                                                                                                                          AS INDICATED ON THE PLAN
                                                                                                                                                                                                         STABILISE CUT BANKS WITH URETEK OR
                                                                                                                                                                                                          APPROVED SIMILAR.




     COPYRIGHT ©                                                                          Associated Consultants                                          Client                                                                                      Drawn                                  Verified        Project                                                       Drawing Title                                              Scale            Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                  Brisbane address
                                                                                                                                  GROUND LEVEL
                                                                                                                                                          UNIVERSAL PROPERTY                                                                          A. VENESS
                                                                                                                                                                                                                                                      Designed
                                                                                                                                                                                                                                                                                             S. PRYSTUPA
                                                                                                                                                                                                                                                                                             Verified
                                                                                                                                                                                                                                                                                                             PROPOSED NEW RESIDENCE AT                                     EARTHWORKS PLAN                                            AS SHOWN A1
agreement between Tod                                                                                                             283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                  BRISBANE 4000
                                                                                                                                  AUSTRALIA
                                                                                                                                                          COMPANY                                                                                     H. GRAY                                S. PRYSTUPA     71 SEAVIEW TCE, SUNSHINE BEACH                                STAGE 4                                                    Drawing Number
                                                                                               architects
                                                                                                                                                          ESTABLISHMENT                                                                                                                                                                                                                                                               14517-OP24
                                                                                                                                  postal address
used for this specific project.                                                                                                   GPO BOX 353                                                                                                         Approved                               RPEQ No
                                                                                               planners                           BRISBANE                                                                                                                                                                   RDP               RP197117
                                                                                               interiors                          QUEENSLAND 4001
                                                                                                                                  AUSTRALIA
                                                                                                                                                                                                               Noosa: 07 5449 9600                    S. PRYSTUPA                            1137            LOCAL AUTHORITY   NOOSA
This drawing shall not be used        B     30.3.16 ISSUED FOR CONSTRUCTION       A.V.
for construction until marked as                                                               Noel Robinson Architects Pty Ltd
                                                                                                                                  tel +61(0)7 3229 5266
                                                                                                                                  fax +61(0)7 3221 0796
                                                                                                                                                                                               Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                      Signed                                 Date            MCU APPROVAL      14/0084           HORIZ DATUM                          0      10     20    30     40         50   60   Sheet             Revision
                                                                                               ABN 62 323 175 502                 [email protected]                                                          PO Box 61, Noosaville, QLD 4566
                                      A     27.1.16 OPERATIONAL WORKS APPROVAL    A.V.                                                                                                                                                                                                                       ROL APPROVAL                        VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                      3 of 12              B
                                                                                                                                  www.nrarc.com
'issued for construction' in the                                                                                                                                                             [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                             DECEMBER 2015
                                                                                               ACN 010 011 720

revision description.                Rev Date Revision Description               Drawn                                                                                                                         ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                             OPW APPROVAL                        RL               41.410                   MEASUREMENT BAR - INCREMENTS IN mm

Page 37

                                                                                                                                                                                               D
                                                                                                                                                                                               -




                                                                                                                                                                         POUR 450 DEEP LEVEL 1
                                                                                                                                                                         BEAM FOR PILE                                 DRIVEWAY RESTRAINING SLAB
                                                                                                                                                                         RESTRAINT AT RL 45.00
                                                                                                                                                                         REFER STRUCTURAL DRAWING
                                                                                                                                                                         SET FOR INFORMATION.




                                                                                                                                                     RV1                     RV1




                                                                                                                             RV1
                                                                                                                                                    RV1
                                        E                                                                                                                                 RV1
                                         -

                                                                                                        RV1



                                                                                                                                      RV1                 RV1
                                                                                                  RV1



                                                                                                                         RV1
                                                                                         RV1
                                                                                                                                                                                                      WORKING PLATFORM AT RL 44.50




                                                                                                                                                                         POUR LEVEL 1 SLAB FOR
                                                                                                                                                                         PILE RESTRAINT AT RL 45.00
                                                                                                                                                                         REFER STRUCTURAL DRAWING
                                                                                                                                                                         SET FOR INFORMATION.




                                                                                                                                                                                                                                                                                                                                                                                EARTHWORKS - STAGE 5
                                                                                                                                                                                                                                                                                                                                                                                             1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                                                                                             1:100 UNREDUCED AT A1




                                                                                                                                                                                                              STAGE 5 PROCEDURE :
                                                                                                                                                                                                                  INSTALL SCREW PILES AS SHOWN ON THE
                                                                                                                                                                                                                   PLAN IN ACCORDANCE WITH THE
                                                                                                                                                                                                                   SPECIFICATION AND TO THE CONTRACTORS
                                                                                                                                                                                                                   DETAILS.
                                                                                                                                                                                                                  POUR BEAM AND LEVEL 1 SLAB AS SHOWN                                                                                                                                         SCREW PILES :
                                                                                                                                                                                                                   ON THE PLAN, REFERRING TO THE
                                   ROOF RL 52.55                                                                                                                                                                   STRUCTURAL DRAWINGS FOR THE                                        ROOF RL 52.55
                                                                                                                                                                                                                                                                                                                                                                                               RV1      219 x 8.2 GALV AND EPOXY PAINTED SCREW PILE
                                                                                                                                                                                                                   REQUIRED DETAILS.                                                                                                                                                                  MINIMUM 8m DEEP 30T SWL. CONC. FILL (25 MPa)
                                                                                                                                                                                                                                                                                                                                                                                               RV2      219 x 12.7 GALV AND EPOXY PAINTED SCREW PILE
                                                                                                                                                                                                                                                                                                                                                                                                      MINIMUM 6m DEEP 60T SWL. CONC. FILL (25 MPA)

                                                                                                                                                                                                                                                                                                                                                                                               RT      RAKING AT 1 IN 2.75 - 219 x 8.2 GALV AND EPOXY PAINTED SCREW PILE
                                   LEVEL 2 RL 49.55                                                                                                                                                                                                                                   LEVEL 2 RL 49.55
                                                                                                                                                                                                                                                                                                                                                                                                      MINIMUM 12m LONG SWL = 60T TENSION. CONC. FILL (25 MPA)


                                                                                                                                                                                                                                                                                                                        EXISTING
                                                                                                                                                                                                                                                                                                                        SURFACE                                   BACKFILL AS PER THE
                                                                                                                                                                                                                                                                                                                                                                  ARCHITECT AND
                                                                                                                                                                                                                                                                                                                                                                  LANDSCAPE
                                                                                                                                                                                                       SCREW PILES FROM                                                                                                                                           ARCHITECTS DRAWINGS
                                                                                    POUR BEAM FOR PILE                                                                                                 CONSTRUCTION
                                   LEVEL 1 RL 45.00
                                                                                    RESTRAINT                                                                                                          PLATFORM TO REMAIN.                                                            LEVEL 1 RL 45.00


                                                                                                                                                                                                       RL VARIES. REFER PLAN
                                                                                                                                                                                                                                                                                                                                                                                                     ALL VERTICAL AND RAKING SCREW PILES SHALL FOUND AT LEAST 5m
                                                                                                                                                                                                                                                                                                                                                                                                     BELOW  A  27°  LIINE  PROJECTED  FROM  THE  BASE  OF  THE  SLOPE,  AND
                               POUR SLAB (BEYOND)                                                                                                                                                                                                                                                                                                                                                    AT LEAST 7.0m BELOW ORIGINAL GROUND LEVEL.
                               FOR PILE RESTRAINT
                                                                                                                                                                                                                                                                                                                                                                                                     THE SCREW PILING CONTRACTOR MUST ALLOW FOR PRE-BORING
                               AT RL 45.00                                                                                                                                                                                                                                                                                                                                                           WHERE NECESSARY TO PENETRATE WEATHERED SANDSTONE
                                   BASEMENT RL 40.80                                                                                                                                                                                                                                  BASEMENT RL 40.80                                                                                              LAYERS.

                                                                                                                                                                                                                                                                                                                    RL 40.00                                                                         SCREW PILES ARE TO BE DESIGNED AND INSTALLED BY THE
                                                                                                                                                                                                                                                                                                                                                                                                     CONTRACTOR TO SAFELY WITHSTAND THE SPECIFIED SAFE WORKING
                                                                                                                                                                                                                                                                                                                                                                                                     LOADS, AND CERTIFIED BY AN EXPERIENCED RPEQ ENGINEER, WHO
                                                                                                                                                                                                                                                                                                                                                                                                     SHALL PROVIDE APPROPRIATE FORM 15 AND FORM 16
                                                                                                        RL 38.00
                                     POOL PLANT RL 37.25                                                                                                                                                                                                                              POOL PLANT RL 37.25

                                     RL 36.50




                                                                          SECTION                       D                  STAGE 5                                                                                                                                                                                   SECTION                   E
                                                                          1:200 UNREDUCED AT A3
                                                                          1:100 UNREDUCED AT A1
                                                                                                         -                                                                                                                                                                                                           1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                     1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                               -


     COPYRIGHT ©                                                                                        Associated Consultants                                             Client                                                                                          Drawn                         Verified                    Project                                                                  Drawing Title                                             Scale            Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                                 Brisbane address
                                                                                                                                                 GROUND LEVEL
                                                                                                                                                                          UNIVERSAL PROPERTY                                                                               A. VENESS
                                                                                                                                                                                                                                                                           Designed
                                                                                                                                                                                                                                                                                                         S. PRYSTUPA
                                                                                                                                                                                                                                                                                                         Verified
                                                                                                                                                                                                                                                                                                                                    PROPOSED NEW RESIDENCE AT                                                EARTHWORKS PLAN                                            AS SHOWN A1
agreement between Tod                                                                                                                            283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                                 BRISBANE 4000
                                                                                                                                                 AUSTRALIA
                                                                                                                                                                          COMPANY                                                                                          H. GRAY                       S. PRYSTUPA                71 SEAVIEW TCE, SUNSHINE BEACH                                           STAGE 5                                                    Drawing Number
                                                                                                              architects
                                                                                                                                                                          ESTABLISHMENT                                                                                                                                                                                                                                                                                 14517-OP25
                                                                                                                                                 postal address
used for this specific project.                                                                                                                  GPO BOX 353                                                                                                               Approved                      RPEQ No
                                                                                                              planners                           BRISBANE                                                                                                                                                                            RDP               RP197117
                                                                                                              interiors                          QUEENSLAND 4001
                                                                                                                                                 AUSTRALIA
                                                                                                                                                                                                                                    Noosa: 07 5449 9600                    S. PRYSTUPA                   1137                        LOCAL AUTHORITY   NOOSA
This drawing shall not be used          B       30.3.16 ISSUED FOR CONSTRUCTION               A.V.
for construction until marked as                                                                              Noel Robinson Architects Pty Ltd
                                                                                                                                                 tel +61(0)7 3229 5266
                                                                                                                                                 fax +61(0)7 3221 0796
                                                                                                                                                                                                                    Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                           Signed                        Date                        MCU APPROVAL      14/0084             HORIZ DATUM                                   0      10     20    30     40    50       60   Sheet             Revision
                                                                                                              ABN 62 323 175 502                 [email protected]                                                                PO Box 61, Noosaville, QLD 4566
                                        A       27.1.16 OPERATIONAL WORKS APPROVAL            A.V.                                                                                                                                                                                                                                   ROL APPROVAL                          VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                        4 of 12              B
                                                                                                                                                 www.nrarc.com
'issued for construction' in the                                                                                                                                                                                  [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                                         DECEMBER 2015
                                                                                                              ACN 010 011 720

revision description.                 Rev Date Revision Description                        Drawn                                                                                                                                    ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                                     OPW APPROVAL                          RL               41.410                            MEASUREMENT BAR - INCREMENTS IN mm

Page 38

     STAGE 6 PROCEDURE :
          EXCAVATE BEYOND THE LEVEL 1 WORKING
                                                                                                                                                                                                                                                                                                                                                                                                       20mm PLATE WALINGS WITH 3 x 150 UB
           PLATFORM TO FORM THE RAMP DOWN TO A                                                                                                                                                                                                                                                                                                                                                         STRONG BACKS WELDED TO PILES AS SHOWN.
           LOWER TURNAROUND PLATFORM AT RL 41.00.
          EXCAVATE TO FORM ANOTHER RAMP DOWN
           TO THE POOL LEVEL WORKING PLATFORM
                                                                                                                                                                                                                                                                                                                                                                                                                                                                            .
          CUT/FILL PLATFORM AREA AND USE                                                                                                                                                                                                                                                                                                                                                                                                                                AX




                                                                                                                                                                                                                                                                                                                                                                                                                                                                                               SCREW PILE
           TEMPORARY SANDBAG RETAINING
                                                                                                                                                                                                                                                                                                                                                                                                                                                                 . 0 m  M .
                                                                                                                                                                                                                                                                                                                                                                                                                                                               2        G
                                                                                                                                                                                                                                                                                                                                                                                                                                                          AT LON
           STRUCTURES TO RETAIN FILL.
          STABILISE CUT BANKS WITH URETEK OR                                                                                                                                                          DRIVEWAY RESTRAINING SLAB                                                                                                                                                                                                                     ES
           APPROVED SIMILAR AS REQUIRED.                                                                                                                                                                                                                                                                                                                                                                                                          PIL 6.0m
                                                                                                                                                                                                                                                                                                                                                                                                                                             W        E
                                                                                                                                                                                                                                                                                                                                                                                                                                           RE TO B
                                                                                                                                                                                                                                                                                                                                                                                                                                         SC
                                                                                                                                                                                                                                                                                                                                                                                                                                   2 19   ILES
                                                                                                                                                                                                                                                                                                                                                                                                                                  Ø S. P
                                                                                                                                                                                                                                                                                                                                                                                                                                   CR




                                                                                                                                                                                                                                                                                                                                                                                                                     SCREW PILE
                                                                                                                                                                                                                                    LEVEL 1 BEAM AT RL 45.00

                                                                                                                                                                                                                                                                                                               TEMPORARY RETAINING
                                                                                                                                                                                                                                                                                                               STRUCTURE. VARIES BETWEEN                                                                                                                                       C   K
                                                                                                                                                                                                                                                                                                               1.0m AND 2.0m HIGH.                                                                                                                                      G   BA
                                                                                           E
                                                                                                                                                                                                                                                                                                                                                                                                                                                               R     ON
                                                                                         OP25                                                                                                                                                                                                                                                                                                                                                            ST
                                                                                                                                                                                                                                                                                                                                                                                                                                                   UB
                                                                                                                                                                                                                                                                                                                                                                                                                                             150                                K
                                                                                                                                                                                                                                                                                                                                                                                                                                                                               C
                                                                                                                                                                        LEVEL 1 SLAB AT RL 45.00                                                                                                                                                                                                                                                                            BA
                                                                                                                                                                                                                                                                                                                                                                                                                                                                NG
                                                                                                                                                                                                                                                                                                                                                                                                                                                          T   RO
                                                                                                                                                                                                                                                                                                                                                                                                                                                      S
                                                                                                                                                                                                                                                                                                                                                                                                                                                   UB                         AC
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                K
                             EARTHWORKS - STAGE 6                                                                                                                                                                                                                                                                                                                                                                                            150                        GB




                                                                                                                                                                                                                                                                                                                                                                                                               600
                                                                                                                                                                                                                                                                                                                                                                                                                                                         ON
                                                                                                                                                                                                                                                                                                                                                                                                                                                       TR
                                                                                                                                                                                                                                                                                                                                                                                                                                                     BS
                                             1:200 UNREDUCED AT A3
                                             1:100 UNREDUCED AT A1                                                                                                                                                                                                                                                                                                                                                                                 U                 G
                                                                                                                                                                                                                                                                                                                                                                                                                                             150                 KIN




                                                                                                                                                                                                                                                                                                                         RL 43.00
                                                                                                                                                                                                                                                                                                                                                                                                                                                               OR 37.00




                                                                                                                                                                                                                                                               RL 44.50
                                                                                                                                                                                                                                                                                                                                                                                                                                                             W




                                                                                                                                                                                                                                                                                                                                                                                                               400
                                                                                                                                                                                                                                                                                                                                                                                     0
                                                                                                                                                                                                                                                                                                                                                                                                                                                           L
                                                                                                                                                                                                                                                                                                                                                                                                                                                         VE AT RL




                                                                                                                                                                                                                                                                                                                                                                              RL 41.0
                                                                                                                                                                                                                                                                                                                                                                                                                                                      LE
                                                                                                                                                                                                                                                                                                                                                                                                                                                 O OL ORM




                                                                                                                                                                                                                                                                                                                                                                                                           200
                                                                                                                                                                                                                                                                                                                                                                                                                                               P      F
                                                                                                                                                                                                                                                                                                                                                                                                                                                   AT
                                                                                                                                                                                                                                                                                                                                                                                                                                                PL
                                                                                                                                                                                              LEVEL 1 WORKING
                                                                                                                                                                                              PLATFORM AT RL 44.50




                                                                                                                                                                                                                                                                                                                                                                                        00
                                                                                                                                                                                                                                                                                                                                                                                    41.
                                                                                                                                                                                                   .50




                                                                                                                                                                                                                                                                                                                                                                                 RL
                                                                                                                                                                                              RL 44
                                                                                                                                                                                       4.00
                                                                                                                                                                                   RL 4                 0
                                                                                                                                                                                                 RL 43.0

                                                                                                                                                                                             0
                                                                                                                                                                                                                                                                                                                                                                                                                                       TEMPORARY RETAINING
                                                                                                                                       ESHAP
                                                                                                                                             E                                       RL 42.0
                                                                                                                                AND R                                                                                                                                                                                                                                                                                                    STRUCTURE DETAIL
                                                                                                                 O S T A BILISE    LA TF ORMS
                                                                                                           ETE T            KING P                                                                       .0    0                                                                                                                                                                                                                                         1:50 UNREDUCED AT A3
                                                                                                     HOTCR         Y WOR                                                                           RL 41
                                                                                               75mm S R TEMPORAR
                                                                                                                                                                                                                                                                                                                                                                                                                                                         1:25 UNREDUCED AT A1


                                                                                                    FO
                                                                                               BANK
                                                                                                                                                                                         0.00
                                                                                                                                                                                     RL 4
                                                                                                                                                                                                                                                                                                            PROVIDE 4 x RV2 SCREW PILES
                                                                                                                                                                                                                                                                                                            UNDER RAINWATER TANK




                                                                                                               G
                                                                                                         AININ
                                                                                                    Y RET HIGH.
                                                                                               ORAR
                                                                                           TEMP TURE. 2.0m
                                                                                                C
                                                                                           STRU
                                                                                                                                                                                            00
                                                                                                                                                                                            37.



                                                                                                                                                                                                                                                            PROVIDE 4 x RV2 SCREW PILES
                                                                                                                                  20mm PLATE WALINGS WITH 3 x 150 UB                                                                                        UNDER STORMWATER TANK
                                                                                                                                                                                              RL




                                                                                                                                  STRONG BACKS WELDED TO PILES AS
                                                                                                                                  SHOWN ON THE ADJACENT DETAIL.
                                                                                                                                                                                                                                                                                                            75mm SHOTCRETE TO STABILISE AND
                                                                                                                                                                                                                                                                                                            RESHAPE BANK FOR TEMPORARY
                                                                          Ø219  SCREW  PILES  AT  2.0m  MAX.                                                                                                                                                                                                WORKING PLATFORMS
                                                                          CRS. PILES TO BE 6.0m LONG.
                                                                                                                                                                                                                                                                                                                                                                                   1




                                                                                                                                                                                                                                                                                                                                                                                                                                                          BOUNDARY
                                                                                                                                                                                                                                                                                                                                                                             1
                                                                                 POOL LEVEL WORKING                                                                                                                                                                                                                                                                                                         30°  SLIPLINE
                                                                                 PLATFORM AT RL 37.00




                                                                                                                                                                                                                                                                                                                                                                                         30°0
                                                                                                                                                                                                                 TEMPORARY RETAINING




                                                                                                                                                                                                                                                                                                                                                                                          '0"
                                                                                                                                                                                                                 STRUCTURE. VARIES BETWEEN                                                                  E
                                                                                                                                                                                                                                                                                                         FAC
                                                                                                                                                                                                                 1.0m AND 2.0m HIGH.                                                               L SUR
                                                                                                                                                                                                                                                                                                 A
                                                                                                                                                                                                                                                                                              UR




                                                                                                                                                                                                                                                                                                                                    2.0m MAX.
                                                                                                   INE                                                                                                                                                                                    NAT
                                                                                           TL                                                                                                                                                                                                     POOL LEVEL WORKING                                      TEMPORARY RETAINING
                                                                                         CU
                                                                                                                                                                                                                                                                                                  PLATFORM AT RL 37.00                                    STRUCTURE. VARIES
                                                                                                                                                                                                                                                                                                                                                          BETWEEN 1.0m AND
                                                                                                                                                                                                                                                                                                                                                     1    2.0m HIGH.




                                                                                                                                                                                                                                                                                                                                    4.0m MIN.
                                                                                                                                                                                                                                                                                                                                                10

                                                                                                                                  F
                                                                                                                                  -



                                                                                                                                                                                                                                                                                                                                                                   SECTION                        F
                                                                        TEMPORARY RETAINING                                                                                                                                                                                                                                                                        1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                                                                                                   -
                                                                                                                                                                                                                                                                                                                                                                   1:100 UNREDUCED AT A1
                                                                        STRUCTURE. VARIES BETWEEN
                                                                        1.0m AND 2.0m HIGH.


     COPYRIGHT ©                                                                         Associated Consultants                                               Client                                                                                        Drawn              Verified           Project                                                                                       Drawing Title                                                                          Scale                Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                      Brisbane address
                                                                                                                                      GROUND LEVEL
                                                                                                                                                              UNIVERSAL PROPERTY                                                                            A. VENESS
                                                                                                                                                                                                                                                            Designed
                                                                                                                                                                                                                                                                               S. PRYSTUPA
                                                                                                                                                                                                                                                                               Verified
                                                                                                                                                                                                                                                                                                  PROPOSED NEW RESIDENCE AT                                                                     EARTHWORKS PLAN                                                                    AS SHOWN A1
agreement between Tod                                                                                                                 283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                      BRISBANE 4000
                                                                                                                                      AUSTRALIA
                                                                                                                                                              COMPANY                                                                                       H. GRAY            S. PRYSTUPA        71 SEAVIEW TCE, SUNSHINE BEACH                                                                STAGE 6                                                                             Drawing Number
                                                                                               architects
                                                                                                                                                              ESTABLISHMENT                                                                                                                                                                                                                                                                                                        14517-OP26
                                                                                                                                      postal address
used for this specific project.                                                                                                       GPO BOX 353                                                                                                           Approved           RPEQ No
                                                                                               planners                               BRISBANE                                                                                                                                                    RDP                 RP197117
                                      C   4.5.16   AMENDED AS CLOUDED             A.V.         interiors                              QUEENSLAND 4001
                                                                                                                                                                                                                                                            S. PRYSTUPA        1137
This drawing shall not be used
                                                                                                                                      AUSTRALIA
                                                                                                                                                                                                                     Noosa: 07 5449 9600                                                          LOCAL AUTHORITY     NOOSA
                                      B   30.3.16 ISSUED FOR CONSTRUCTION         A.V.                                                tel +61(0)7 3229 5266                                          Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                            Signed             Date                                                                                                                        0            10        20    30    40    50          60                  Sheet                    Revision
for construction until marked as                                                               Noel Robinson Architects Pty Ltd       fax +61(0)7 3221 0796
                                                                                                                                      [email protected]                                                            PO Box 61, Noosaville, QLD 4566                                                     MCU APPROVAL        14/0084                            HORIZ DATUM
                                                                                               ABN 62 323 175 502
                                      A   27.1.16 OPERATIONAL WORKS APPROVAL      A.V.                                                                                                                                                                                                            ROL APPROVAL                                           VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                    5 of 12                     C
                                                                                                                                      www.nrarc.com
'issued for construction' in the                                                                                                                                                                   [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                               DECEMBER 2015
                                                                                               ACN 010 011 720

revision description.                Rev Date Revision Description              Drawn                                                                                                                                ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                  OPW APPROVAL                                           RL                41.410                                MEASUREMENT BAR - INCREMENTS IN mm

Page 39

                                                                                                                                                                    G          SMALL VEHICLE TURNAROUND AREA
                                                                                                                                                                    -



                                                                                                                                                                                                                                                                                                                                                                                                                       PREVIOUS DRIVEWAY POUR



                                                                                                                                                                                                                                                                                                                                                                                                                                                   ROOF RL 52.55




                                                                                                                                                                                                        PREVIOUS DRIVEWAY RESTRAINING SLAB POUR
                                                                                                                                                                                                                                                                                                                                                PARTIAL LEVEL 2 POUR FOR WORKING
                                                                                                                                                                                                                                                                                                                                                PLATFORM/TURN AROUND AREA                                                                        LEVEL 2 RL 49.55




                                                                                                                                                                                                                                                                                                                                                PREVIOUS LEVEL 1 POUR                                                                            LEVEL 1 RL 45.00


                                                  E                                                                                                                                                                                                                                                                                                                                                                                                  RL VARIES.
                                                 OP25
                                                                                                                                                                                                                                                                                                                                                                                                                                                    REFER PLAN




                                                                                                                                  .55
                                                                                                                                                                                                                                                                                                                                                                                                                                              SCREW PILES FROM

                                                                                                                               49
                                                                                                                                                                                                                                                                                                                                                                                                                                              CONSTRUCTION
                                                                                                                      RL                                                                                                                                                                                                                                                                                                                      PLATFORM TO REMAIN.
                                                                                                                AT

                                                                                                                                                                                                                                                                                                                                                                                                                                              BASEMENT RL 40.80
                                                                                                         AB



                                                                                                                                                                                    PARTIAL LEVEL 2 POUR FOR WORKING
                                                                                                     SL




                                                                                                                                                                                    PLATFORM/TURN AROUND AREA
                                                                                                                                                                                    REFER STRUCTURAL DRAWING SET FOR INFORMATION.




                                                                                                                                                                                                                                                                                                                                                                                                                                             POOL PLANT RL 37.25


                                                                                                                                                                                    CONSTRUCT  Ø450  R.C.  COLUMN  UP  FROM                                                                                                          RL 36.50
                                                                                                                                                                                    PREVIOUSLY CONSTRUCTED ISOLATED
                                                                                                                                                                                    PILE BELOW.
                                                                                                                                                                                    REFER STRUCTURAL DRAWING SET FOR INFORMATION.




                                                                                                                                                                                                                                                                                                                                                                     SECTION                       G          STAGE 7
                                                                                                                                                                                                                                                                                                                                                                     1:200 UNREDUCED AT A3
                                                                                                                                                                                                                                                                                                                                                                     1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                                                                                                                                                    -


                                                                                                                                                                    EARTHWORKS - STAGE 7
                                                                                                                                                                         1:200 UNREDUCED AT A3
                                                                                                                                                                         1:100 UNREDUCED AT A1
                                                                                                                                                                                                                                                                 STAGE 7 PROCEDURE :
                                                                                                                                                                                                                                                                    POUR COLUMN AND PART LEVEL 2 SLAB AS
                                                                                                                                                                                                                                                                     SHOWN ON THE PLAN, REFERRING TO THE
                                                                                                                                                                                                                                                                     STRUCTURAL DRAWINGS FOR THE
                                                                                                                                                                                                                                                                     REQUIRED DETAILS.




     COPYRIGHT ©                                                                       Associated Consultants                                              Client                                                                                                Drawn               Verified               Project                                                                Drawing Title                                                  Scale             Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                   Brisbane address
                                                                                                                                   GROUND LEVEL
                                                                                                                                                           UNIVERSAL PROPERTY                                                                                    A. VENESS
                                                                                                                                                                                                                                                                 Designed
                                                                                                                                                                                                                                                                                     S. PRYSTUPA
                                                                                                                                                                                                                                                                                     Verified
                                                                                                                                                                                                                                                                                                        PROPOSED NEW RESIDENCE AT                                                  EARTHWORKS PLAN                                               AS SHOWN A1
agreement between Tod                                                                                                              283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                   BRISBANE 4000
                                                                                                                                   AUSTRALIA
                                                                                                                                                           COMPANY                                                                                               H. GRAY             S. PRYSTUPA        71 SEAVIEW TCE, SUNSHINE BEACH                                             STAGE 7                                                       Drawing Number
                                                                                            architects
                                                                                                                                                           ESTABLISHMENT                                                                                                                                                                                                                                                                         14517-OP27
                                                                                                                                   postal address
used for this specific project.                                                                                                    GPO BOX 353                                                                                                                   Approved            RPEQ No
                                                                                            planners                               BRISBANE                                                                                                                                                             RDP               RP197117
                                                                                            interiors                              QUEENSLAND 4001
                                                                                                                                   AUSTRALIA
                                                                                                                                                                                                                          Noosa: 07 5449 9600                    S. PRYSTUPA         1137               LOCAL AUTHORITY   NOOSA
This drawing shall not be used        B   30.3.16 ISSUED FOR CONSTRUCTION       A.V.
for construction until marked as                                                            Noel Robinson Architects Pty Ltd
                                                                                                                                   tel +61(0)7 3229 5266
                                                                                                                                   fax +61(0)7 3221 0796
                                                                                                                                                                                                          Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                 Signed              Date               MCU APPROVAL      14/0084                HORIZ DATUM                                  0         10   20   30     40    50       60       Sheet               Revision
                                                                                            ABN 62 323 175 502                     [email protected]                                                                    PO Box 61, Noosaville, QLD 4566
                                      A   27.1.16 OPERATIONAL WORKS APPROVAL    A.V.                                                                                                                                                                                                                    ROL APPROVAL                             VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                 6 of 12                B
                                                                                                                                   www.nrarc.com
'issued for construction' in the                                                                                                                                                                        [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                     DECEMBER 2015
                                                                                            ACN 010 011 720

revision description.                Rev Date Revision Description             Drawn                                                                                                                                      ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                        OPW APPROVAL                             RL               41.410                           MEASUREMENT BAR - INCREMENTS IN mm

Page 40

                                                                                                                                                                                                                                                                                                                                                                                             SPREAD WATER FROM TABLE DRAIN AND OVERLAND FLOW OVER
                                                                                                   TABLE DRAIN PLACED BEHIND PILING ARRANGEMENT TO COLLECT ADJACENT OVERLAND FLOW. DIRECT OUT PAST LINE OF PROPOSED SERVICE STRUCTURE.                                                                                                                                                       PILE CAP. CONSTRUCT PILE CAP AT NATURAL SURFACE LEVEL.



                                                                                                                                     X                                                               Y                                                                                                600 SQ x 500 DEEP SUMP PIPED TO OSD
                                                                                                                                 OP29                                                               OP29



                                                                                                                                                TABLE DRAIN                                                                                                   TABLE DRAIN                                                                        TABLE DRAIN



                                                                     OPEN DRAIN                                                                 OPEN DRAIN                                                 OPEN DRAIN                                                                                                                     Ø225           SERVICE STRUCTURE.
                                                                                                                                                                                                                                                                                    OPEN DRAIN                                                   u
                                                                                                                                                                                                                                                                                                                                          TO O PVC  PIPE
                                               N
                                                                                                                                                                                                                                                                       5                                                                                       RL 49.50




                                                                                                                   5




                                                                                                                                                                                                0
                                             AI

                                                                                                                                                                                                                                                                     .3                                                                       SD




                                                                                                                .4




                                                                                                                                                                                             .4
                                                         0                                                                                                                                                                                                        49
                                           DR




                                                                                                             49




                                                                                                                                                                                            49
                                                      .5
                                                     49
                                       ED




                                                                                                                                                                                                                                                                                                                                                 49.




                                                                                                                                                                                                                                                                                                                               0
                                                                                                                                                                                                                                                                                                                                                    25




                                                                                                                                                                                                                                                                                                                            .3
                                     AT




                                                                                                                                                                                                                                                                                                                        49
                                   GR




                                                                                   SURFACE WATER                                                                                                                                                                           5




                                                                                                                                                                                                                                                5
                                                                                                                                                                                                                                                                        52                                       49.




                                                                                                                                                                             5




                                                                                                                                                                                                                                               2
                                                                                                                                                                                   SURFACE WATER




                                                                                                                                                                            2
                                                                                                                                                                                                                                                                       .                                            525




                                                                                                                                                                                                                                            .5
                                                                                                                                                                         .5
                                             5




                                                                                   OVERLAND FLOW PATH                                                                                                                                                              49
                                          .4




                                                                                                                                                                                                                                         49
                                                                                                                                                                        49
                                                                                                                                                                                   OVERLAND FLOW PATH
                                     49




                                                               5



                                                                                                                                                                                                                                                                                                                                                                                                                                     RIP RAP ROCK PROTECTION. USE
                                                                2
                                                             .5




                                                                                                                                                                                                                                                                                                                                                         49.
                                                          49




                                                                                                                                                                                                                                                                                                                                                            525                                                                      400-500mm GRANITE BOULDERS TO FORM
                                                                                                                                                                                                                                                                                                                                                                                                                                     SPILLWAY ANTI-SCOUR PROTECTION.
                                                                                                                                                                                                                                                                                                                                                       OSD AND BIO-RETENTION.
                                                                                                                                                                                                                                                                                                                                                       REFER SHEETS OP31 AND OP32
                                                                                                                                                                                             GARAGE                                                                                                                                                                                                               SURFACE WATER OVERLAND FLOW PATH
                                                                                                                                                                                                                                                                               CARPARKING                                          WORKSHOP
                    0




                                                                                                                                                                                                                                                                                                                                     RL 49.55
                 .4
              49




                                                                                        MAIN RESIDENCE ENTRY                                                                                                          49.
                                                                                                                                                                                                                         5   5




                                                                                                                                                                                                                                               5
                                                                                                                                                                                       5




                                                                                                                                                                                                                                            .5
                                                                                                  RL 49.55




                                                                                                                                                                                    .5
                                                                                                                                                                                                                                                                                                      49.
                                      5




                                                                                                                                                                                                                                         49
                                   .4




                                                                                                                                                                                   49
                                                                                                                                                                                                                                                                                                            55
                              49




                                                                                                                                                                                    49.
                                                                                                                                                                                       55




                                                                                                                                                                                                                                        DRIVEWAY PLAN
                                                                                                                                                                                                                                                    1:200 UNREDUCED AT A3
                                                                                                                                                                                                                 50                                 1:100 UNREDUCED AT A1

                                                                                                                                                                                                              49.
                                                                                                                                                                                                                      DENOTES FINISHED CONCRETE SURFACE LEVEL.



                                                               WEBFORGE STEEL GRATING
                                                               OR APPROVED SIMILAR


                                                                                   R.L. AS SHOWN




                                                                                        PIPE             SL82 MESH PLACED
                                                                                                         CENTRALLY 225 LAPS
                                                                      I.L.
                                                               150




                                                                             150   600 x 600    150



                                                             TYPICAL GRATED PIT DETAIL
                                                       PROPRIETARY PRECAST PITS AND GRATES MAY BE USED IN PLACE OF
                                                       THOSE SHOWN, SO LONG AS THEY ARE APPROVED IN ADVANCE BY THE
                                                       ENGINEER ALL GRATES ARE TO BE OF CYCLE SAFE DESIGN, HEAVY DUTY
                                                       TYPE MANUFACTURED TO AS 3996 - LOAD CLASS C IF CONSTRUCTED OF
                                                       MILD STEEL, GRATES ARE TO BE HOT DIPPED GALVANISED AFTER
                                                       FABRICATION




     COPYRIGHT ©                                                                                       Associated Consultants                                             Client                                                                                                           Drawn                 Verified              Project                                                        Drawing Title                                             Scale            Sheet Size
This drawing is subject to
copyright in accordance with the                                                                                                                Brisbane address
                                                                                                                                                GROUND LEVEL
                                                                                                                                                                         UNIVERSAL PROPERTY                                                                                                A. VENESS
                                                                                                                                                                                                                                                                                           Designed
                                                                                                                                                                                                                                                                                                                 S. PRYSTUPA
                                                                                                                                                                                                                                                                                                                 Verified
                                                                                                                                                                                                                                                                                                                                      PROPOSED NEW RESIDENCE AT                                       DRIVEWAY AND OVERLAND                                     AS SHOWN A1
agreement between Tod                                                                                                                           283 ELIZABETH ST

Consulting pty ltd (tc) and tc's
client. This drawing shall only be
                                                                                                                                                BRISBANE 4000
                                                                                                                                                AUSTRALIA
                                                                                                                                                                         COMPANY                                                                                                           H. GRAY               S. PRYSTUPA          71 SEAVIEW TCE, SUNSHINE BEACH                                  FLOW PATH DETAILS                                         Drawing Number
                                                                                                             architects
                                                                                                                                                                         ESTABLISHMENT                                                                                                                                                                                                                                                                          14517-OP28
                                                                                                                                                postal address
used for this specific project.                                                                                                                 GPO BOX 353                                                                                                                                Approved              RPEQ No
                                                                                                             planners                           BRISBANE                                                                                                                                                                              RDP                      RP197117
                                      C     4.5.16   AMENDED AS CLOUDED                         A.V.         interiors                          QUEENSLAND 4001
                                                                                                                                                                                                                                                                                           S. PRYSTUPA           1137
This drawing shall not be used
                                                                                                                                                AUSTRALIA
                                                                                                                                                                                                                                                   Noosa: 07 5449 9600                                                                LOCAL AUTHORITY          NOOSA
                                      B     30.3.16 ISSUED FOR CONSTRUCTION                     A.V.                                            tel +61(0)7 3229 5266                                                              Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
                                                                                                                                                                                                                                                                                           Signed                Date                                                                                            0      10     20    30     40    50       60   Sheet             Revision
for construction until marked as                                                                             Noel Robinson Architects Pty Ltd   fax +61(0)7 3221 0796
                                                                                                                                                [email protected]                                                                                PO Box 61, Noosaville, QLD 4566                                                           MCU APPROVAL             14/0084      HORIZ DATUM
                                                                                                             ABN 62 323 175 502
                                      A     27.1.16 OPERATIONAL WORKS APPROVAL                  A.V.                                                                                                                                                                                                                                  ROL APPROVAL                          VERT DATUM AHD
                                                                                                                                                                                                                                                                                                                                                                                                                                                                7 of 12              C
                                                                                                                                                www.nrarc.com
'issued for construction' in the                                                                                                                                                                                                 [email protected]      www.todconsulting.com
                                                                                                                                                                                                                                                                                                                 DECEMBER 2015
                                                                                                             ACN 010 011 720

revision description.                Rev Date Revision Description                             Drawn                                                                                                                                               ABN 39 128 805 336
                                                                                                                                                                                                                                                                                                                                      OPW APPROVAL                          RL               41.410                   MEASUREMENT BAR - INCREMENTS IN mm

The text continues on page 41.

Used in these records

About this file

File size
14.5 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2014022_71_SeaviewTce_SWMP-revC_full.pdf · 14.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.