Figure!7:!Detention!Strategy!
! !
! ! ! 21!
[OCR of page images]
aquaintel
Hard Roof Driveway External
Catchment
Grassed and Pool Area Green Roof Sth [Green RoofNth | > \
Bio Basin
Design by (5 m?— 300 mm ED;
others 400 mm filter media;
onan fawa Nitti Lower Lawn Nth } 100 mm dia. outlet) }
T
1
1
1
1
1
1
1
! Design by Design by I
' jj others ¥ others \ 1
1 Rainwater Tank \ '
1 25 m' volume — \
Bio Basin 1 2x 225mm; | sag Liday reuse) \ !
(12 m?-300mmED {A R775 AL \ '
above finished surface; }1 ‘ 1
400 mm filter media;) 3% \ 1
No Detention ! \ 1
1 1
1.x 100 mm dia; 1 1x50 mm; IL 0.0 RL from base return to sheet" ! '
IL -0.4 RL from 1 1x 100 mm dia; IL 0.9 RL from base flow prior to 1 I
finished surface 1 Outlet down hill environmental line \ ' 1
Outlet down hill ¥ , ¥ 4 v
Outlet 2 (Sth) Outlet 1(Nth)
Receiving Environment
Figure 7: Detention Strategy
21
Intelligent Water Management Solutions
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2014022_71_SeaviewTce_SWMP-revC_full.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.