SEDIMENT CONTROL FENCE
EROSION AND SEDIMENT CONTROL PLAN
1:400 UNREDUCED AT A3
1:200 UNREDUCED AT A1
EROSION AND SEDIMENT CONTROL :
OBJECTIVES:
1. THESE DRAWINGS ARE PROVIDED FOR GUIDANCE ONLY. THE CONTRACTOR SHALL ASSESS WHAT
MEASURES ARE REQUIRED TO SUIT THE PROPOSED CONSTRUCTION METHODOLOGY AND STAGING.
2. THE CONTRACTOR SHALL COMPLY WITH ALL STATUTORY REGULATIONS DURING THE CONSTRUCTION
PHASE AND MAINTENANCE PERIOD.
3. EROSION AND SEDIMENTATION CONTROL MAY BE AIDED BY MINIMISING THE AREA OF DISBURBANCE.
MANAGEMENT PRINCIPLES:
4. THE MANAGEMENT PRINCIPLES EMPLOYED IN THIS PLAN ARE IN ACCORDANCE WITH THE 'BEST
PRACTICE EROSION AND SEDIMENT CONTROL' MANUAL, PUBLISHED BY THE INTERNATIONAL EROSION
CONTROL ASSOCIATION (IECA). THE BASIC PRINCIPLES ARE TO:
MINIMISE THE AREA OF DISTURBANCE;
CONTROL DRAINAGE PATHS UPSTREAM OF SITE AND AT OUTLETS FROM SITE;
MINIMISE EROSION;
MINIMISE SEDIMENTATION;
2000 MAX
PROGRESSIVELY REVEGETATE AND REHABILITATE THE SITE.
DISTURBED AREA
SITE INSPECTION AND MONITORING:
DIRECTION 5. CONTRACTOR SHALL NOMINATE A PERSON RESPONSIBLE FOR INSTALLATION, MONITORING AND
OF FLOW STAR PICKETS MAINTENANCE OF CONTROL MEASURES (E.G. SITE FOREMAN).
WIRE OR DRIVEN 600mm
STEEL MESH INTO GROUND 6. ALL EROSION AND SEDIMENT CONTROL MEASURES SHOULD BE INSPECTED:
AT LEAST DAILY WHEN RAIN IS OCCURING;
GEOTEXTILE FILTER AT LEAST WEEKLY (EVEN IF WORK IS NOT OCCURING ON-SITE);
FABRIC
WITHIN 24 HOURS PRIOR TO EXPECTED RAINFALL;
SEDIMENT CONTROL :
UNDISTURBED AREA WITHIN 18 HOURS OF A RAINFALL EVENT.
700mm PROVIDE SEDIMENT CONTROL TO THE BOUNDARIES
MAX 7. CONTRACTOR TO CHECK AFTER RAINFALL FOR PERFORMANCE INDICATORS SUCH AS EVIDENCE OF
BY WAY OF SEDIMENT FENCES.
EXCESSIVE FLOW CONCENTRATIONS, EROSION PATHS DEVELOPING, SILT AND SEDIMENT
FENCES TO BE ERECTED BEFORE COMMENCEMENT ACCUMULATION.
OF EARTHWORKS, AND SHALL BE MAINTAINED UNTIL
GRASS COVER AND LANDSCAPING IS ESTABLISHED. 8. CONTRACTOR TO CHECK DURING RAIN THAT FLOWS ARE NOT BYPASSING CONTROL MEASURES.
DURING WORKS, ALL CONSTRUCTION RUBBISH TO BE 9. WHEN A SITE INSPECTION DETECTS A NOTABLE FAILURE IN THE ADOPTED MEASURES, THE SOURCE OF
SEDIMENT CONTROL FENCE CONTAINED WITHIN AN APPROVED BIN. THIS FAILURE MUST BE INVESTIGATED AND THE APPROPRIATE AMENDMENTS MADE TO THE SITE
CONTROLS.
NOT TO SCALE
THE CONTRACTOR SHALL MAINTAIN A WRITTEN RECORD OF DATES OF ALL INSPECTIONS INCLUDING ANY
CORRECTIVE ACTIONS TAKEN.
COPYRIGHT © Associated Consultants Client Drawn Verified Project Drawing Title Scale Sheet Size
This drawing is subject to
copyright in accordance with the Brisbane address
GROUND LEVEL
UNIVERSAL PROPERTY A. VENESS
Designed
S. PRYSTUPA
Verified
PROPOSED NEW RESIDENCE AT EROSION AND SEDIMENT AS SHOWN A1
agreement between Tod 283 ELIZABETH ST
Consulting pty ltd (tc) and tc's
client. This drawing shall only be
BRISBANE 4000
AUSTRALIA
COMPANY H. GRAY S. PRYSTUPA 71 SEAVIEW TCE, SUNSHINE BEACH CONTROL Drawing Number
architects
ESTABLISHMENT 14517-OP33
postal address
used for this specific project. GPO BOX 353 Approved RPEQ No
planners BRISBANE RDP RP197117
interiors QUEENSLAND 4001
AUSTRALIA
Noosa: 07 5449 9600 S. PRYSTUPA 1137 LOCAL AUTHORITY NOOSA
This drawing shall not be used B 30.3.16 ISSUED FOR CONSTRUCTION A.V.
for construction until marked as Noel Robinson Architects Pty Ltd
tel +61(0)7 3229 5266
fax +61(0)7 3221 0796
Sunshine Coast: 07 5329 3190 Mackay: 07 4840 2337
Signed Date MCU APPROVAL 14/0084 HORIZ DATUM 0 10 20 30 40 50 60 Sheet Revision
ABN 62 323 175 502 [email protected] PO Box 61, Noosaville, QLD 4566
A 27.1.16 OPERATIONAL WORKS APPROVAL A.V. ROL APPROVAL VERT DATUM AHD
12 of 12 B
www.nrarc.com
'issued for construction' in the [email protected] www.todconsulting.com
DECEMBER 2015
ACN 010 011 720
revision description. Rev Date Revision Description Drawn ABN 39 128 805 336
OPW APPROVAL RL 41.410 MEASUREMENT BAR - INCREMENTS IN mm
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2014022_71_SeaviewTce_SWMP-revC_full.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.