2014022_71_SeaviewTce_SWMP-revC_full · OPW16/0021
From the archive OPW16/0021- Response - Civil Plans. File date in the archive: 2016-05-16 04:05.
Very large file (14.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
!
!
!
!
!
FIGURES!
!
Figure!1:!Locality!Plan! 3!
Figure!2:!Development!Layout! 4!
Figure!3:!Conceptual!Water!Quality!Treatment!Train! 7!
Figure!4:!Model!Layout! 9!
Figure!5:!WSUD!Strategy! 12!
Figure!6:!Catchment!Plan! 20!
Figure!7:!Detention!Strategy! 21!
!
!
TABLES!
!
Table!1:!Site!stormwater!quality!objectives!(operational!phase)! 5!
Table!2:!Impervious!Percentage! 8!
Table!3:!Catchment!Areas! 9!
Table!4:!MUSIC!Rainwater!Tank!Parameters! 10!
Table!5:!Bioretention!Basin!Design!Parameters! 11!
Table!6:!MUSIC!Results!–!LoadbBased!Pollutant!Outputs! 13!
Table!7:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Existing!Scenario! 15!
Table!8:!!Existing!Scenario!WBNM!Outlet!Peak!Flows! 15!
Table!9:!Rational!Method!Calibration!Summary!(Total!Catchment)! 16!
Table!10:!Rational!Method!Peak!Flows!Versus!WBNM!Peak!Flows! 16!
Table!11:!!WBNM!SubbCatchment!Fraction!Impervious!Values!–!Developed!Scenario! 17!
Table!12:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!1! 17!
Table!13:!!Developed!Scenario!WBNM!Outlet!Peak!Flows!–!Outlet!2! 18!
Table!14:!Storage!and!Outlet!Details!of!Detention!System! 18!
Table!15:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!1! 19!
Table!16:!!Comparison!of!WBNM!Outlet!Peak!Flows!–!Outlet!2! 19!
Table!17:!!Level!Spreader!Calculations! 22!
!
!
!
[OCR of page images]
FIGURES
Figure 1: Locality Plan
Figure 2: Development Layout
Figure 3: Conceptual Water Quality Treatment Train
Figure 4: Model Layout
Figure 5: WSUD Strategy
Figure 6: Catchment Plan
Figure 7: Detention Strategy
TABLES
Table 1: Site stormwater quality objectives (operational phase)
Table 2: Impervious Percentage
Table 3: Catchment Areas
Table 4: MUSIC Rainwater Tank Parameters
Table 5: Bioretention Basin Design Parameters
Table 6: MUSIC Results — Load-Based Pollutant Outputs
Table 7: WBNM Sub-Catchment Fraction Impervious Values — Existing Scenario
Table 8: Existing Scenario WBNM Outlet Peak Flows
Table 9: Rational Method Calibration Summary (Total Catchment)
Table 10: Rational Method Peak Flows Versus WBNM Peak Flows
Table 11: WBNM Sub-Catchment Fraction Impervious Values — Developed Scenario
Table 12: Developed Scenario WBNM Outlet Peak Flows — Outlet 1
Table 13: Developed Scenario WBNM Outlet Peak Flows — Outlet 2
Table 14: Storage and Outlet Details of Detention System
Table 15: Comparison of WBNM Outlet Peak Flows — Outlet 1
Table 16: Comparison of WBNM Outlet Peak Flows — Outlet 2
Table 17: Level Spreader Calculations
aqua
on bw
12
20
21
wou
10
11
13
15
15
16
16
17
17
18
18
19
19
22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2014022_71_SeaviewTce_SWMP-revC_full.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.5 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.