Council archive · source document
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Not Properly Made) [As Published] · 142008.1704
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
[MAJOR HAZARD FACILITY ]
24 Is the proposed use a major hazard facility or possible major hazard facility under the Dangerous Goods Safety Management Act
2001?
X No - Goo. 02.5 O Yes - (Complete Form 1, Part L) This application requires assessment by the Department of E mergency Services
(DES), if DES is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
I ten 4 iP Regulauon, 3
IPA schedule &, part 1, tat
[CONTAMINATED LAND-REGISTEREDLAND . , . we |
2.5 Is any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the
Environmental Protection Act 1994?
[XJ No -Gotoaz6 [_] Yes
IPA, schedule 8. part 1. table 2. dem 3: 1F Regulation. schedule 2, lable 2. tent 22
(CONTAMINATED LAND - NOTIFIABLE ACTIVITY 7 © eR BR ae owed
26 {s any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for
a notifiable activity?
[EX] No -Gowoa2z7 [_] Yes
IPA, schoitule 8, part 1, lable 2. item 6? Regulation, schedule 2. oth: 2. tem 22
(CONTAMINATED LAND - INDUSTRIAL ACTIVITY «
27 Is any part of the premises currently used for an industrial activity (other than for a mining activity or petroleum activity), or if there
is no existing use was it last used for an industrial activity (other than for a mining activity or petroleum activity)?
DX} No -Gowoazs [(} Yes
IPA, schedule 8, part 71, table 2, lem GIP Regulation, schedule 2. tatblo 2. ite 22
(CONTAMINATED LAND - AREA’ MANAGEMENT ADVICE (NATURAL MINERALISATION ( OR INDUSTRIAL ACTIVITY) - ra
28 Is any part of the premises in an area for which an area management advice has been given for natural mineralisation or industrial
activity (other than for a mining activity or petroleum activity)?
EX] No - Gotoa29
(1 Yes
IPA, sehodute 4, part 1, labia 2, hem 7 1P Regulation, schoduie 2.
‘AQUACU LTURE; WILD RIVER AREA’:
He 2, table 2, teri 7
J
2.9 ls the proposed use for aquaculture as defined under the Fisheries Act 1994?
EK] No -Gotoaz10 (] Yes
assessdble aguacultura), IP Regulation, schadule 2, ieahie 2, item 2?
aga
ee IVES
AGRICULTURAL AND ANIMAL HUSBANDRY ACTIVITIES IN A WILD RIVER AREA
2.10 ls any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
DX] No -Gotoa2.11 [_] Yes
IPA, schedule 8, part 1, able 2. it
|SEQ-REGIONAL PLAN
on Rg el
2.11A Is any part of the premises within the South East Queensland (SEQ) Regional Plan area?
DX] No -Gotoa2178 [7] Yes
SEQ Reg
nat Platt 2609-2026, Ammendinent 1. Regulatory Provisx
ision 2: HP Reguiauon, sc
(STATE PLANNING REGULATORY PROVISIONS (REGIONAL PLANS)*2...
8 2, table 3. kent 13 IPA, section 2.5A.12 G)
2.11B Is any part of the premises within a designated region under Schedule 1 of the draft regulatory provisions?
DX] No -Gotoa212 [_] Yes
22
Ste!
fate Planning Regulalory Provisions (Regional
1g Reguicslory Proyiga.
he drat regulatory provi
a
niet Plans)
Gotten LP Regulation, seticdks
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Not Properly Made) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.