Council archive · source document
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Not Properly Made) [As Published] · 142008.1704
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
1.1B Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered in
a Local Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Goto Q1.2 O Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government against the [DAS
Code in the Queensland Heritage Regulation 2003. if the development involves building work and the local
government is nol the Assessment Manager for the application. the focal government has jurisdiction as Concurrence
Agency.
mn HA GPA, s.
[REMOVING QUARRY MATERIAL; WILD RIVER AREA _ oo / < * |
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
BI No-Gowoar3 [_] Yes
IPA, schedule
séction IHC. W
ion. schedule 2, table 2, tem 771: 1 Reyulauon, schedule 1. table §. der 2 (wild river area}; Water Act 2000,
" JENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVERAREA = = « : Lee , a |
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
No-Gotoan4 [[] Yes
,
IPA, schedute
TSAR pik vives
IWITHINTHE LIMITS OFAPORT. se
seen
14 ls any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
No - Goto Q1.5
(1 Yes
WP Roguls
‘DECLARED FISH HABITAT AREA® 6% wry ars
nH, sCheduie 2, table
ere
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
{J No - Gotoa1.6
(Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
JP Regulation, schedule 2. table
‘COMMUNITY INFRASTRUCTURE # ion oe Qu 8 aut oe hg ee a Se
1.6 ls any part of the premises designated for community infrastructure?
DJ No - Goto Q2.7
(Yes
4? Regulation, sche
[WASTE WATER MANAGEMENT «2:
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
DX] No -€ndof Section? {"] Yes
IP Reyulation, schexiute 2. table 3. iam 3
iPLANNING SCHEME...
2.1 ls the proposed use assessable under the planning scheme?
CU No- Gotwoa22 [X) Yes - Compiete Form 1, Part O and answer 02.1.1 - 2.1.13 below
If yes, does the application request that the proposal be assessed against a superseded planning scheme?
& No — ([J Yes- (Comptete Form 1 Atachment 1)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1704 - Operational Works - Prescribed Tidal Works - Transport Type 5 - Domestic Marine (Not Properly Made) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.