Skip to the record
The gold standard in government transparency.

Council archive · source document

Amended Site-Based Stormwate Management Plan · RAL18/0023

of 47

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
4.3.5 MUSIC Treatment Node Parameters (Post Developed Site)

Bioretention Basins


Figure 4.3 and Figure 4.5 show the parameters for the bioretention basins.




                Figure 4.3 Bioretention node parameters Street Tree Pit West Hofmann Drive C1




                       Figure 4.4 Bioretention node parameters West Hofmann Drive C2




Site Based Stormwater Management Plan                                                           Page 12 of 20
1856-SBSMP-01_Version 3.0 (May 2019)

Used in these records

About this file

File size
4.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Amended Site-Based Stormwate Management Plan.pdf · 4.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.