Council archive · source document
Amended Site-Based Stormwate Management Plan · RAL18/0023
Plans and drawings: the text below has words only, no drawings.
2.975 Ha
H
O
FM
A
N
N
D
R
IV
E
CATCHMENT C2
AREA=0.2545 Ha
LOT 4
2365m²
CATCHMENT DRIVEWAY & RESERVE
HO
AREA=0.227 Ha
FM
AN
N
DR
IV
CATCHMENT C3
E
AREA=0.1250 Ha LOT 5
2307m²
LOT 6 LOT 8
2473m² 3257m²
LOT 15
4247m² LOT 9
3274m²
RIVE
ANN D
HOFM RO
AD R
A D
Y
A
H
CATCHMENT C1 R
E
AREA=0.1150 Ha LT
A
W
ROAD B
LOT 16
4525m²
LOT 14
4005m² B
CATCHMENT ROAD A
AD
AREA=0.2265 Ha
LEGEND - NEW WORKS EXTENT
RO
CATCHMENT ROAD B
AREA=0.407 Ha
EXTENT OF AC SEAL
LOT 10
4733m²
EXTENT OF CUT EARTHWORKS
EXISTING KERB & CHANNEL (B1 TYPE 450mm CHANNEL)
ROUNDABOUT
EXTENT OF 2m WIDE CONCRETE FOOTPATH
EXTENT OF COMMERICAL DRIVEWAY
LOT 13 ROAD CENTRELINE
LOT 11
4117m² CATCHMENT AREA
4999m²
PROJECT: JOB NUMBER
REV DATE DESCRIPTION BY CHKD DRAWN
I GDETAL
IS SCALE APPROVED PROPOSED SUBDIVISION 1856
AT WALTER HAY DRIVE, NOOSAVILLE
DATUM AHD SHEET: OF
DESIGN MM
0 10 20 30 40 50m ................. FOR STOCKWELL PTY LTD
8 8
Director: CAMERON LANDRETH DRAWING TITLE: DRAWING NUMBER REV
DRAWN MM
(RPEQ 19358)
DESIGN CHECK CL
SCALE 1:1000 A3 p 07 5443 8285 STORMWATER CATCHMENT PLAN SW08
DRAWING STATUS e [email protected] w www.barlowshelley.com.au
This drawing is not to be copied or amended without written permission from
DATE 21-02-19 FOR APPROVAL a PO Box 899, Maroochydore,4558 ABN 89 215 591 077
Barlow Shelley Consulting Engineers
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Amended Site-Based Stormwate Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 4.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.