Original source · versioned page text
Original Conditions December 1994
15.7 15.8 15.9 The applicant is to undertake a water quality monitoring programme for the site. Samples are to be taken from the two main discharge points into Lake Weyba, the groundwater system of the sedgeland area in the-southern eastern corner of the site and adjacent to the National Park boundary and analysed by an NATA registered laboratory for: “ge * suspended solids ~ (acceptable level < 100 mg/l) * organic nitrogen (acceptable level <0.8 mg/1) * inorganic nitrogen (acceptable level <0.4 mg/1) * total phosphorus (acceptable level <0.2 mg/1) * faecal coliforms (acceptable level <400 organisms/100 ml) Council may review the acceptable levels referred to above provided that it is satisfied such variation still provides for a satisfactory quality of water discharge. Single samples are to be taken prior to the commencement of construction works. Further samples are to be taken at not greater than 3 monthly intervals both throughout the construction period and thereafter during the operation of the development unless Council approves of other arrangements. Results of the tests are to be provided to the Noosa Council. Samples are not to be undertaken within two days of significant rainfall events, during significant creek flows or when the creek is not flowing. If levels considered to be unsatisfactory by Council are indicated by such analyses, the applicant is to undertake remedial action as determined by the Council and the Department of Environment and Heritage. The applicant may transfer in a manner satisfactory to the Shire Planner, the responsibility for compliance with this condition to a shared arrangement between a body corporate having responsibility for overall maintenance of the drainage of the site and the owner of the golf course The proposed means of fertilising the golf course both in the initial- construction stages and also for ongoing maintenance after establishment, shall be the subject of a separate submission to Council. Council may approve of the proposed means of fertilising the golf course, may require variations to such means and may refuse to grant its approval. No fertilising of the golf course site shall be carried out except in accordance with the necessary approval of Council and any conditions thereto. The means of fertilising shall be designed so as to minimise the potential for any increase in nutrient runoff to Lake Weyba or Weyba Creek. Council may also approve of variations to the approved means of fertilising upon application by the developer. The developer shall meet Council's ‘reasonable costs in assessing proposals under this condition. The golf course is required to be completed and operating to a minimum-standard of a 9 hole course to the satisfaction of the Shire Planner, prior to Council sealing plans for titling purposes, in excess of 180 dwelling units pursuant to this approval. :
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Original Conditions December 1994.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.