Original source · versioned page text
Original Conditions December 1994
21.3 21.4 ~ 21.5 21.6 21.7 21.8 21.9 21.10 On site signs and advertising shall be prohibited unless: i) the on site signs and advertising comply with the Noosa Design Manual, and ii) the on site signs and advertising have been approved by Council. ~ All signage and on site advertising will be integrated with the site architecture. On site accommodation may be provided to cater for workforce personnel not able to be accommodated in the Noosa area in which case services are to be provided to the on-site camp, to the Shire Engineer's requirements. The Developer shall obtain all statutory approvals and, unless otherwise specified herein, shall submit to Council proof of such approvals with the engineering or building plans prior to any relevant works being carried out on site: An identification survey of the subject site shall be carried out by a Licensed Surveyor and shall be submitted to Council at or prior to the time of inspection of building foundations by Council's Building Surveyor. Such survey shall set out the boundaries of the site and plot the position of the buildings on the site. The Developer shall comply with all requirements of the Liquor Licensing Commission. The Developer shall pay such fees as may be determined by Council in the investigation, consideration and determination of any report, survey, plans or drawings or any other matter submitted to Council for its consideration or approval under these conditions. The developer shall further. pay all Council's inspection and monitoring fees. Unless otherwise specified herein, all fees shall be paid prior to the release of the Engineering Plans or Building Permit (as appropriate). The Developer shall be obliged to pay the fees notwithstanding that Council may continue to hold security by way of a bond or bonds under section 14 hereof. No variations or amendments will be permitted to the approved Architectural _ Design Report, the approved Landscape Design Report, the approved Landscaping Plans and the Works Programme, unless in the opinion of Council such a variation or amendment does not conflict with the intent of these Conditions of Approval.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Original Conditions December 1994.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.