Original Conditions December 1994
2.3 3.0 3.1 3.2 3.3 3.4 In the event that the Developer assigns absolutely or by way of security the interests, rights or obligations under these conditions or parts with possession of the lands or assigns or leases or subleases or grants a license or right to use the whole or any part/s of the lands without the prior written consent of the Council, the obligations of the Council under these conditions shall continue and remain in full, force and effect. CIVIL ENGINEERING CONDITIONS- PRINCIPAL TIME CONSTRAINTS The Developer shall, after rezoning has been gazetted, but prior to commencement of any earthworks, prepare and submit for approval by Council the following:- (a) the survey referred to in Condition 3.3; (b) the master drainage report referred to in Condition 3.4; “(© the overall general works programme referred to in Condition 5.1; (d) a works programme setting out the information required by the Shire Engineer relevant to the particular stage proposed to be undertaken. Upon submission of the first building application, the Developer shall submit to the Shire Engineer for approval; the sewerage reticulation system and the water reticulation system referred to in the relevant sections of Conditions 6.0 and 7.0 respectively. Further, the developer is to submit with the first building application the Q100 Flood Height relative to the site. The Developer shail, after the rezoning has been gazetted, but prior to the commencement of any earthworks, prepare and submit for approval by Council, a survey control grid over the entire site that is subject to development. As part of the survey the Developer shall install permanent survey marks levelled to Australian Height Datum and submit the relevant Form 6. . The Developer shall, after the rezoning has been gazetted, but prior to the © commencement of any earthworks, prepare and submit a master drainage plan identifying existing major surface drainage paths, depths of existing waterways and major culverts required across any proposed internal road. The master drainage plan shall have regard to both minor storm Q10 frequency and a major storm event Q4100. The master drainage plan shall incorporate a method of stormwater retention including wet basins to improve water quality prior to it being discharged into Lake Weyba. This master drainage plan is.to be approved by both Council and the Department of Environment and Heritage prior to it being used as the basis of drainage design. The developer shall complete the drainage works in accordance with the master drainage plan. Detailed drainage plans shall be submitted-with the _telative building application and the engineering design plans for the access road.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Original Conditions December 1994.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.