Council archive · source document
06/2435 - MCU - Education Type 3 - Adult [As Published] · 132006.2435
NeereKw we Checklist - Applications Involving Land
Development & Land Use Sections
IDAS APPLICATION
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1.
PLANS | Ts .
5.1 Ensure that at feast 6 sets of the Plan of Development (6 for Reconfiguration and Operational G
Works) accompanies the application. In addition ensure that each set is complete.
5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is 4
unbound.
"SUPPORTING INFORMATION | De . ee
6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration ned
and Operational Works). If the application is accompanied by a covering letter, ensure that it is
capable of reproduction. -
6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound.
om FEE" cere cte mae nap ramen ae ceremony ot ase none Sar “ye te yg
7.1 Ensure that | the application fee, as determined from the Couneit’ s adopted scale of fees, wy
accompanies the application or has been paid.
7.2 Ensure that the fee which has been paid is recorded on the application form. 4|
APPLICATION FORMS — — , ~
1.1. Form1 PartA
1.1.1 Ensure that the form is fully completed.
1.1.2 tn the case of an MCU or Op Works below the high-water mark, owners consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No. or Company Seal required.
1.2. Form’ Part B-O Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. [7]
1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. [A
REFERRAL INFORMATION, oo. : . — :
2.1 Ensure that items 1-23 have been checked and/or completed with regard to referrals. (7
: ENVIRONMENTALLY RELEVANT ACTIVITIES"
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application.
FORM 2'- REQUEST TO CHANGE APPROVAL ~
4.1 Ensure that items 1-28 have been checked and/or completed including information regarding
applicant details and owners consent.
’ oe
Receiving Officer
Having completed this form and accepted the a|
trays:-
PR.
lication, please deliver both to the following IDAS Application Receivir.g
\f the application is for a Material Change of Use exclusively -AOP1's desk in the Land Use Section.
\f the application is for an Material Change of Use & Reconfiguration - AOP1's desk in the Land Use Section.
If the application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the
Land Development Section.
In all other circumstances —- AOP1’s desk in the Land Use Section.
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 22 pages
Page 2
a WEOZOKY.We Referral Agencies Checklist IDAS REFERRAL AGENCY + TRIGGERS YES NO Please tick ¥ Department of Main Roads (Concurrence or Advice) « State Controlled Road Environmental Protection Agency (Concurrence) e Environmentally-Relevant Activity (for non-devolved Council as EPA) «( Contaminated lan: nmental Management/Contaminated Land Register » UXO « Land recently used as a ‘notifiable activity’ = Industrial land changed to sensitive uses (eg school) « Coastal related developments Department of Natural Resources & Mines « Acid sulphate soils (Advice) ¢ Clearing of native vegetation on freehold land (Concurrence) « Operational Work - taking or interfering with water/watercourse/referrable dam (Concurrence) e Removal of quarry material from a water course (Concurrence) Department of Primary Industries (Concurrence) ¢ Environmentally Relevant Activities (piggeries/feedlots) Queensland Fire & Rescue Authority (Advice) e Building work containing special fire services required by SBRs Department of Emergency Services (DES) @ MCU - Major hazard facility (Concurrence) Department of Local Government & Planning (Referral-Coordination) * 30o0rmore different concurrence agencies e Involves a prescribed facility (Schedule 6 !P Regulations) ¢ __Within a prescribed area (Schedule 7 IP Regulations) OTHER STATE AGENCIES + TRIGGERS Portable Long Service Leave Levy (PLSL) « Check for Operational Works Value in excess of $85,000.00 with respect to PLSL OWNER’S CONSENT Department of Natural Resources and Mines REFERRAL AGENCY RESPONSE RECEIVED BEFORE LODGEMENT For further clarification refer to IDAS Guides 1 - 18 prepared by Department of Local Government & Planning. AOP2 15/10/2003 g:\landuse\templates\referral agencies checklist.doc ‘
Page 3
4
et
-? INTEGRATED PLANNING ACT 1997
Form 1 Development Application
y Common details 2 |
Part A, Version 2.4, 29 May 2006
The completion of all applicable questions on Part A is mandatory for all applications. Part A must be accompanied by the completed IDAS Assessment Checklist if
required, and by one (1) or more other completed parts of the Form as required. For more information on the parts of the Form refer to www. ipa.qid.gov.au.
Any information
Description of land
All land the subject of the application, must be
identified. However, a description of the land is not
required in retation to a mobile or temporary
Environmentally Relevant Activity (ERA).
Advice for completing Q2 - Q2 applies if
development is proposed within a water body or
watecourse,
Advice for completing Q3 - Most land can be
identified by a lot on plan description. These detalls
can be obtained from Ute documents or through the
local government.
Howaver, if the land on which the development Is
proposed does not have a lot on plan description
{i.e. the development is proposed in a water body or
watercourse) provide —
(i) the fot on pian description for the
adjoining/adjacent land; or
(ii) GPS coordinates where there is no
adjoining/adjacent tand (eg. in Moreton Bay).
Advice for completing Q? - Q7 does not apply if
the development is within a water body or
watercourse,
Advice for completing Q§ - 08 applies if
development is within a local government area.
Note: Areas below high water mark are not within a
Jocal government's area unless provided for under
the Local Government Act 1993.
Advice for completing Q9 - Q9 applies if
development Is on strategic port tand or a strategic
port land tidal area. For more details refer to Guide
u
uested in the form may be provided in an attachment to the a
tion, For further information about competing the following details, refer to Guide 1.
1. Street address: fncludinghouse number, street name, suburb/ocality name & postcode) (if applicable)
90 Goodchap Street, Noosaville
2. Name of water body or watercourse, within which the development is proposed: (if applicable)
NIA
3. Lot on plan description (eg, Lot 123 on RP 4567) / GPS coordinates:
Lot 2 on SP155870
4. The above description is for: (tick applicable box)
[1 (i) the land on which the development is proposed; or
Ci) the land adjoining the water body or watercourse, within which the development is
proposed; or
C1 (ii) the water body or watercourse.
5. Shop/ tenancy number: 6. Storey / level: 7. Total area of land: (m? or
NIA N/A ha):
4.485 ha
8. Local government area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo etc.) (if applicable)
Noosa Council
9, Port authority for the strategic port land or strategic port land tidal area on which the
development is proposed: (eg. Port of Brisbane, Port of Townsville) (if applicable)
NIA
Proposal details
If there is insufficient room available, details may be
provided in an attachment to the application.
10. Existing use of the land: (eg. vecant, single house, shop etc.)
Office/medical/shop
11. Proposed use of the land: (eg. 6 unit apartment building, 30 fot residential subdivision, ERA for aquaculture in
ponds with a total area of 7 ha for which wastes are released into waters etc).
As existing + Education Type 3 Adult
Other applicable parts of Form 1
Part A must always be accompanied by other
completed parts of Form 4. For information about
when: a part of Form 1 may apply refer to Guide 1.
Applicant details
Clearly identify who is making the application. The
applicant need not be the owner of the land.
When signing and lodging this application
The applicant Is responsible for ensuring the
information provided is correct. The assessment
manager, any referral agency & the Chief Executive
{where applicable) will rely on this information when
assessing and deciding the application.
Ifthe applicant is a company - a contact person
must be shown,
12. Other parts of Form 1 completed as part of this application: (eg. Part D, Part J, etc}
Part D
13. Applicant's name:
N C Oliver Noosa Pty Ltd
15. Contact person:
Scott Sobey
14. Contact number:
07 5443 9335
16. Facsimile number/e-mail address:
07 5443 9885
[email protected]
Page 4
uae * " INTEGRATED PLANNING ACT 1997 Part A, Version 2.4, 29 May 2006 17. Postal address: C/- Urban Strategies (Sunshine Coast) Pty Ltd PO Box 939 MAROOCHYDORE QLD 4558 18, Signature: pli xo fA 19. Date: 19-10, 2006
Page 5
ae
r
*
’ INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Land owner’s consent (if applicable)
Section 3,2.1(3) of the IPA prescribes that an
application must contain, or be supported by, the
written consent of the land owners, if the
application involves:
(i) amateria change of use;
(i) reconfiguration of a lot;
(ii) work on land below high-water mark & not
within a canal as defined under the Coastal
20.
Land owner's consent to the making of this application:
Name No¥wan Charles Oliver (Director )
signatys pe LL
Date (2.10. 2006
Protection and Management Act 1995,0r r 7
{iv} work on rail coridor land defined under the (i) NC Oliver Noosa Pty Lid
Transport Infrastructure Act 1994,
Section 3.8.1(2)(a) of the IPA provides that
landowner's consent is ngt required for a mobile or
temporary ERA.
For more information refer to Guide 1.
(il)
y
kecrie Ann fostma ( Seescteany
sas 18 10. 2006
(iii)
(iv)
(v)
Resource entitlement (if applicable) 21. Does this application involve a State resource prescribed under a regulation (other than involving
Section 3.2.1{5} of the IPA requires evidence of quarry material on State coastal tand under the Coastal Protection and Management Act 1995)?
resource entitlement be given for applications that
involve a prescribed State resource. EX] NO - go to a24 LI YES - go to 22
Section 3,2.4(10)(a}{ii) of the IPA prescribes that an . te . |
application cannot be taken to be property made 22. This application is accompanied by evidence: (tick applicable box)
without evidence of the resource entitlement.
Advice for completing Q21 & 22
Refer to schedule 10 of the fntegrated Planning
Regulation 1998 that prescribes the nature of
evidence required by the State in support of the
lodging of this development application.
(1 ())_ of the allocation of, or entitlement to, the resource - attach evidence and go to Q23(vi)
(1 (li) the chief executive of the department administering the resource is satisfied the
development is consistent with an allocation of, or entitlement to, the resource - go
to Q23
C1 (ili) the chief executive of the department administering the resource is satisfied the
development application may proceed in the absence of an allocation of, or
entitlement to, the resource - go fo Q23
Page 6
.
" INTEGRATED PLANNING ACT 1997
Advice for completing Q23
The information in (i) ~ (v} is mandatory if evidence
is required under Q22 {ii) or (ji) above.
‘The official stamp of the Department of Natural
Resources, Mines and Water is mandatory where
the application involves any water or riverine quarty
material under he Water Act 2000.
Section 3.2.1{5A} allows the resource manager to
limit the time the evidence may be used. Q23 (vi)
must be completed if the evidence is time limited.
23.
Part A, Version 2.4, 29 May 2006
Evidence of the resource entitlement:
() Resource entitlement / authority details (vii) Official stamp of the department
administering the resource (if
applicable)
(ii) Name of delegated officer
{iii) Position of delegated officer
(iv) Signature of delegated officer
(v) Date
(vi) Expiry date of evidence (if applicable)
Assessment triggers
This checklist does nof apply if the application
requires the completion of Parts A and 8 of the
Form only. It must be completed for all other
applications.
Plans / drawings / reports
An application should be accompanied by details to
support the proposal & enable the assessment
manager, referral agencies and any person viewing
the application during public scrutiny or public
Notification to understand the scope of the proposal
and any potential impact.
24.
25.
(iii)
(iv)
Is the IDAS Assessment Checklist completed and attached to this application?
Yes [INO - the assessment manager may refuse to accept this application on the
grounds that the application has not been properly made
Plans/drawings/reports accompanying this application:
Plan / Drawing / Report Number
Title
Date
PLEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information required by
Part A and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager's)
FEE 3 > DATE
) 7 RECEIVED
REFERENC
*DI\e |e OFFICER'S NANEIS 05 Onan e, NUMBERS CH/2346
To.
Notification of Engagement of Private Certifier (Optional format) V
Dateofengagement / / Accreditation Number. __. Name: Signature:
Council. | have been engaged as the private certifier for the building work referred to in this application.
Page 7
INTEGRATED PLANNING ACT 1997 Part D, Version 2.0, 4 October 2004 Form 1 Development Application Material change of use assessable against a local government's planning scheme 5 Gu Completion of all applicable questions on Part D is mandatory for all applications involving assessment of a material change of use (MCU) assessable against a local governments planning scheme. Nature of the application A development penmit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur. 1. This application is for: (tick 1 or both if applicable) (J Preliminary approval for a material change of use of premises including conceptual design for any associated works that require approval under the planning scheme (ie. consideration of the proposal concept) AND / OR [X] Development permit for a material change of use of premises including conceptual design for any associated works that require approval under the planning scheme. The subject land 2. How the subject land is identified in the planning scheme (name the zone, precinct etc.) For the definition of "gross floor area” go to ji ; the planning scheme against which the Community Services Zone application will be assessed. 3. _ Existing gross floor area: (if applicable) [ Approx 2840m2 | 4. Are there any existing easements on the land? CINo EX] YES - attach plans of the location and details of the purpose of the easement Material change of use details 5. Details of the change to the use of the land: (eg. vacant land fo shopping centre, house to apartment building, vacant land to industry (tyre manufacturing) etc.) | Existing commercial tenancies to Education Type 3 Adult ] 6. Number of employees: | Approx 7 | 7. Operating days and hours: [ Monday to Friday 9am - 5pm | Associated building works details (if |g Site cover: applicable} For the definition of ‘site cover’, “gross floor |g — Grose floor area: area” and “storey” go to the planning scheme | ~ , against which the application will be . . aesced, _— 10. Number of on-site car parking spaces: [ As existing | 11. Number of storeys / maximum height above natural ground: 12. Number of employees Approx 7 13. Hours and days the use will operate | Monday to Friday 9am - Spm Associated operational works details | 14. Details of associated operational works (eg. landscaping, cut and fil, drainage, road works etc.) (if applicable) N/A PLEASE NOTE This application cannot be accepted unless accompanied by Part A of Form 1. The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information requested by Part A and any other relevant part of Form 1. OFFICE USE ONLY (applicable fo assessment manager) DATE RECEIVED REFERENCE NUMBER/S
Page 8
INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 17.0, 2 October 2006
Form 1 DSTO oniea Application idas
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checklist was formerly referred to as the “Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Application Forms continue to refer to this document as the
“Referrals Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources, Mines and Water, Queensland Heritage Council etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager’ for the application.
4. Therefore, the comptetian of all questions in section 1 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
5. tis the responsibility of the appticant to accurately complete this checklist.
6. Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
7.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application in the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination?.
8. To assist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.gov.au. Guide 25 explains the role of the DAS
Assessment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
9. Any other parts of Form 1 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www.ipa.qid.gov.au.
10. Section 2 on page 10 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006.
SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The following state assessment triggers apply to development other than for building work assessable against the Building Regulation 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
Far mora information refer to Guide 4, C1 (i) an environmentally relevant activity (ERA) for which a code for environmental compliance
Unless you answered ‘none of the above" to 01, he
apptication requites assessment by tha has not been made - complete Part G of Form 1
administering authority®, QO (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
\F an entity, other than the gominster'g authority, is made - complete Part G of Form 1
the assessment manager for the application, the ae
administering authority is a concurrence agency for Xl (iil) none of the above
the application in relation to this matter.
Note; An application involving ERA 19 and/or 20 will
also require completion of Part Kr of Form 1 for
approval where an allocation under the Water Act
2000 is required,
State-controlled road matters 2. The application involves: (tick applicable box/es)
nee yosmreres 0 tore to02, the [1 development on land contiguouss to a State controlled road and for -
apptcabon ages refer to ike Qenatnent of C1 (a) material change of use assessable against the planning scheme;
In certain circumstances DMR will be an advice oO (>) reconfiguring a lot unless -
agency, while in other circumstances DMR will be a the total number of lots is not increased; and
Senet ot ht Re vag wit axe yout + the total number of lots abutting the State-controlled road is not increased;
determine where OMR is an advice or concurrence C1 (©) operational work (not associated with a material change of use assessable against the
agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above}-
* associated with access to a State-controlled road; or
¢ for filing or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
1 The assessment manager ts responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the !PA,
2 For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?’
3 The ‘administering authority’ may be either the Environmental Protection Agency, the relevant local government (for a devolved ERA) or the Queensland Department of Primary industries and
Fisheries (for a delegated ERA).
4 Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the tand is within 100m of the State-controtled road; or that is part of a future State-
controlled road.
Page 1
Page 9
INTEGRATED PLANNING ACT 1997
State-controlled road matters (cont}
IDAS Assessment Checklist, Version 17.0, 2 October 2006
(i) devefopment on tand not contiguous to a State-controlled road and -
O(a) material change of use —
assessable against the local government's planning scheme; and
* mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
1 (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
[1 ©) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above}-
+ assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
BX] (iii) none of the above
Clearing vegetation
For more information refer to Guide 12.
Unless you answered “none of the above" to Q3, the
application requires assessment by the Department
of Natural Resources Mines and Water (NRMW).
(f an agency other than NRMW is the assessment
manager for the application, NRMW is a
concurrence agency for the application in relation to
this matter.
If you ticked Q3(i) or (ii), your application requires
referral to NRMW for assessment regardtess of
whether vegetation clearing is proposed or not.
The application involves: (tick applicable box/es)
(i) material change of use -
{a) assessable against the planning scheme;
{b) on alot containing —
acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
« ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
(c) where the existing use of the land is a rural or environmental use; and
(d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
Oi) reconfiguring a lot -
(a) ona lot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
{b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
O (iii) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - complete Part J of
Form 1
(iv) none of the above.
Strategic port fand
For more information refer to Guide 11.
Ifyou ticked {i) - the relevant Port Authority is the
assessment manager for the application.
If you ticked (ii) Queensland Transport is a
concurrence agency for the application.
The application involves:
C1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (Tl
Act) - complete Part ! of Form 1
C1 (ii) a material change of use that is inconsistent with the land use plan approved under the
TI Act for the strategic port land - complete Part ! of Form 1
(iii) none of the above
Acid sulfate soils
For more information refer to Guide 10.
Unless you answered ‘none of the above" to Q5, the
application requires assessment by Department of
Natural Resources Mines and Water (NRMW).
IF an agency other than NRMW is the assessment
manager for the application, NRMW is an advice
agency for the apptication in relation to this matter.
The application involves development on land situated in an identifiedS local government area
and where the surface of the land is: (tick applicable box)
C1 (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or below 5m AHD, or
(7) (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material
1 (iii) none of the above
5 The identified local government areas are: Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gotd Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vate, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
6 Australian Height Oatum (AHD).
Page 2
Page 10
INTEGRATED PLANNING ACT 1997 Major hazard facilities or possible 6. major hazard facilities For more information refer to Guide 17. Ifyou answered “YES” to Q6, the application requires assessment by the Department of Emergency Services (DES). If an agency other than DES is the assessment manager for the application, DES is a concurrence agency for the application in retation to this matter. IDAS Assessment Checklist, Version 17.0, 2 October 2006 Does the application involve a material change of use for a major hazard facility or possible major hazard facility as defined under the Dangerous Goods Safety Management Act 2001? KINO (YES - complete Part t of Form 1 Water related development under the | 7. Water Act 2000 For more information about items (a} - (d), refer to Guide 15. For more information about item (e), tefer to Guide 14 Does my application involve assessment of a referable dam? Untess you answered “none of the above” to Q7, the application requires assessment by the Depastment of Natural Resources Mines and Water (NRMW). if an agency other than NRMW is the assessment manager for the application, NRMW is a concurrence agency for the application in relation to this matter. The application involves: [1 @) operational work, for taking or interfering with water under the Water Act 2000, that is: (tick applicable box/es) (1 (@) ina watercourse, lake or spring, or from a dam constructed on a watercourse (eg. @ pump, gravity diversion, stream re-direction, weir or dam) - complete Part Ke, Ks, Ks, Ks, or Ko of Form 1 whichever is applicable; CO (b) for an artesian bore anywhere in the State, no matter what the use - complete Part Ky of Form 1; L (e) fora subartesian bore, in declared groundwater area’, for use for purposes other than stock and/or domestic use - complete Part K; of Form 1; (J (d) for a subartesian bore, in certain declared groundwater area, for use for stock and/or domestic purposes - complete Part K; of Form 1; (1 €) for constructing a referable dam® or that will increase the storage capacity of a referable dam by more than 10% - complete Part Ks of Form 1; or (1 (f) for taking or interfering with overland flow water - complete Parts Ks and G of Form 1 &X] (i) none of the above. Removal of quarry material from a 8. watercourse For more information refer to Guide 16. If you answered “YES" to Q8, the application Tequires assessment by the Department of Natural Resources Mines and Water (NRMW). lf an agency other than NRMW is the assessment manager for the application, NRMW is a concurrence agency for the application in relation to this matter. Note: Part G of Form 1 is required to be completed as the activily of removing quarry material from a watercourse is also an Environmentally Relevant Activity (ERA). Does the application involve development for the removal of quarry material from a watercourse? requiring an allocation notice under the Water Act 2000? NO (YES - complete Parts Ky and G of Form 1 7 The declared ground water areas are listed in Guide 13 Development in a declared catchment area. 8 Referable dam is defined under the Water Act 2000. 9 Watercourse is defined in sch 10 of the IPA. Page3
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 17.0, 2 October 2006
Operational works in atidal areaor |9. The application involves operational work that is: ( tick the applicable box/es)
coastal management district . . .
For mora information eter to Guide 18, For more [1(i) _ tidal work" as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in focal Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
Umer you anvert non of ane 1008,ine| LL (i) tidal work that is prescribed tidal work"' other than in a canal"? -complete Part P of Form 1; oF
ie le above , Ss . ue . .
application requires assessment by the iii) carried out within a coastal management district under the Coastal Act and for - complete
i ‘ ig
Environmental Protection Agency (EPA). Part M of Form 1 if any boxes (a) to (i) below are ticked.
If an agency other than EPA is the assessment 7 . a + .
manager forthe application, EPA is a concurrence [J (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
agency for the application in relation to this matter. other than those works in tidal water) where the development has been determined not
Local government is the assessment manager for all to be assessable against the Water Act 2000;
prescribed tidal work.
(1 (b) constructing a canal’? intended to be connected to tidal waters;
(1 (©) constructing an artificial waterway;
(1 (d)_ reclaiming land under tidal water;
(1 €€) disposing of dredge spoil or other solid waste material in tidal water;
(11 (f) interfering with quarry material on State coastal land above high-water mark;
{1 (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
CI (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
(iv) none of the above.
Operational work below high water | 10. The application involves operational work that is: (tick the applicable box/es)
mark information fe to Gude 18. For more (71 (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
information about prescribed tidal work in local Coastal Act) that is not prescribed tidal work — complete Part M of Form 1; or
veces an ae eu tear (ii) tidat work that is prescribed tidal work" - complete Part P of Form 1; oF
the application triggers referal to Queenstand C1 (ii) carried out within a coastal management district'S under the Coastal Act and for -
Fran tle Saft ‘ (J (a) disposing of dredge spoil or other solid waste material in tidal water — complete Part
Local government is the assessment manager for all M of Form 1;
prescribed tid work (J (b) reclaiming land under tidal water - complete Part M of Form 1: or
C1 (c) constructing a canals, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1;
&] (iv) none of the above.
Coastal management 11. The application involves: (tick the applicable box/es)
For more information refer to Guide 18. L(i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to Q11,
: , ‘atrtebtS
the application requires assessment by the work carried out completely or partly in a coastal management district
Environmental Protection Agency (EPA). (CI (ii) a material change of use assessable under a planning scheme involving building
{fan agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is —
manager for the application, EPA is a concurrence . . ,
agency for the application in relation to this matter. « the construction of a new premises with a GFA" of at least 1000m?
the enlargement of the GFA of existing premises by more than 1000m2
(1 (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C1 (iv) reconfiguring a lof’? assessable under schedule 8 of the IPA and in connection with
the construction of a canal'6 ~ complete Part M of Form 1
EX] (v) none of the above
10. Tidal work is defined in sch 10 of the IPA,
14 Prescribed tidal work is defined in the Coastal! Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works comptetely or partly within a local government tidal area.
15 Coastal management distict is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of thal Act.
16 Canal means canal as defined under the Coastal Protection and Management Act 1995
17 GFAis defined in sch t4 of the IPA to mean the gross floor area, Far a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
18 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration {s associated with the construction of an arlificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway,
Page 4
Page 12
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 17.0, 2 October 2006
Development within the limits of a 12. Does the application involve development below high water mark‘? and within the limits of a port
port under the Transport Infrastructure Act 1994?
For more information refer to Guide 18. For SA
information about prescribed tidal work refer to NO
Guide 24, L.1 YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
If you answered "YES" to Q12, the application
triggers referral to tha Port Authority.
The Pot Authority is a concurrence agency if the
development is —
within 200m of a shipping channel or an entry
and exit shipping corridor for the port
© within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoil
grounds;
© within 1000m of a planned port facility identified
in aland use plan approved under the Transport
Infrastructure Act 1994,
tn all other situation the Port Authority is an advice
agency.
Marinas 13. Does the application involve operational work that is tidal work for a marina? with more than 6
For more information refer to Guide 18. For vessel berths?
information about whether a marina is prescribed
tidal work refer to Guide 24. The local government NO
(Sine assessment manager fora prescribed Gil (11 YES - complete Part M of Form 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
IFyou answered “YES" to Q13, the application
triggers referral to Queensland Fire and Rescue
Service as an advice agency.
Tidal works in strategic port land tidal] 14. Does the application involve tidal works within a strategic port land tidal area2"?
areas NO
For more information refer to Guide 18. o YES - complete Part M of Form 4
Untess you answered "NO" to Q14, the relevant Fort
Authority is the assessment manager for the
zepication and the Environmental Protection
Agency (EPA) and Queensland Transpost (QT) are
Peco agencies for the application,
Heritage 15. Does the application involve development in a heritage registered place as defined under the
For further information refer to Guide 19. Queensland Heritage Act 1992?
ifyou answered YES" to Q15, the application Ri NO
triggers referral to the Queensland Heritage Council
as concurrence agency for the application. oO YES- complete Part C of Form 1
Declared catchment areas 16. The application is in an area declared to be a catchment area under the Water Act 2000 and
For more information, including a list of the declared involves: (tick the applicable box/es)
catchment areas within Queenstand, refer to Guide . . . . we
3. (4) reconfiguring a fot, if any lot resulting from the reconfiguration is less than 16 hectares;
mss ee srone ofthe above 0016, (1 (ii) development assessable against the planning scheme involving the establishment or
Departmen of Natura Resources Minos and Water expansion of a waste water disposal system, other than a disposal system for carrying
(NRMW). out an environmentally relevant activity under the Environmental Protection Act 1994;
IF an agency other than NRMW is the assessment pe
manager for the application, NRMW is a Xl (ii) none of the above
concurrence agency for the application in relation to
this matter.
Contaminated land 17. The application involves: (tick the applicable box/es)
Applications involving material change of use and/
or recenfiguring a tot may trigger this refarral.
For more information refer to Guide 5.
Unless you answered “none of the above" to Q17,
the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA is the assessment manager
for the application, EPA will be a concurrence
agency for the application in relation to this matter,
(1 @ reconfiguring a fot for which all of part of the premises are ~
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
+ item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
D1 (ii) a material change of use -
(a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
{b) assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 1
EX (iii) none of the above
19 High water mark is defined in the Coasfaf Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
20 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
21 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
Page 13
INTEGRATED PLANNING ACT 1997
Electricity infrastructure
For more information refer to schedule 2of the IP
Regulation,
Unless you answered “none of the above” to 018,
the appfication triggers referral to the agency to
which the easement is granted in favour of as advice
agency.
18.
IDAS Assessment Checklist, Version 17.0, 2 October 2006
The application involves: (tick the applicable boxes)
(i (i) reconfiguring a fot where any part of the lot is -
+ subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
» any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
CJ (iv) operational work that is filing or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
* any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
« the work is located wholly or partly within 10m of a substation site:
EX] (vy) none of the above.
D iii
O iii)
Land designated for community
infrastructure
Applications involving development on land
designated for community infrastructure may trigger
this referral.
For more information refer to schedule 2 of the JP
Regulation,
If you answered “YES to Q19, the application
requires assessment by the chief executive of the
department administering the Act authorising the
development for the designated purpase.
(fan agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence agency for
the application in relation to this matter.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(i) on land not owned by or on behalf of the State; and
(iii) other than development —
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
NO
Clyves
SEQ Regional Plan
For more information refer to schedule 2 of the IP.
Regulation.
Unless you answered “none of the above’ to 020,
the application requires assessment by the Office of
Urban Management (OUM).
20.
The application involves a material change of use of premises in the SEQ Region? for: (tick the
applicable box/es)
(} (i) urban activities, other than where the premises are zoned for an urban purpose under
an IPA planning scheme; or the activity is outdoor recreation, in the -
(a) Regional Landscape and Rural Production Area; or
{b) Rural Living Area; or
(c) Investigation Area.
C1 (ii) rural residential purposes where the premises are not zoned for rural residential
purposes and the premises are in the —
(a) Regional Landscape and Rural Production Area; or
(b) Investigation Area.
(C1 (iii) urban activities in major development areas, other than where a structure plan for the
site has been approved by the regional planning Minister or the activity is outdoor
recreation, where —
(a) The relevant planning scheme requires impact assessment for the activity; or
(b} The development proposal has a site coverage of one hectare or greater.
£1] (iv) none of the above
22 Local Governments within the SEQ Region are identified in the South East Queensland Regional Plan as Beaudesert Shire, Boonah Shire, Brisbane City, Caboolture Shire, Caloundra City, Esk Shire,
Gatton Shire, Gold Coast City, Ipswich City, Kilcoy Shire, Laidtey Shire, Logan City, Maroochy Shire, Noosa Shire, Pine Rivers Shire, Redcliffe City, Redland Shire and Toowoomba City.
23 Urban activity means urban activity as defined in schedute 2, Part H Regulatory Provisions, South East Queensland Regional Plan. The term includes some facilities and purposes and excludes some
purpases. A singla residential dwelling on a lat is not included in urban activity,
24 Rural residential purpose means rurat esidentiaf purpose as defined in schedule 2, Part H Regulatory Provisions, South East Queensland Regional Plan,
Page 6
Page 14
INTEGRATED PLANNING ACT 1997 Fisheries matters For more information refer to schedute 2ef the IP. Regulation, Unless you answered “none of the above" fo Q21, the application requires assessment by the Dey nt of Pri industri Fisheries (OPI8F). If an agency other than DPI&F is the assessment manager for the application, DPI&F is a concurrence agency for the application in retation to items (i) - (iv) and an advice agency in retation to item (v). IDAS Assessment Checklist, Version 17.0, 2 October 2006 21. The application involves: (tick the applicable boxes) : C1 (i) an assessable material change of use for aquaculture - complete Part 0; of Form 1: C1 (ji) assessable operational work that is the construction or raising of a waterway barrier - complete Pert Os of Form 1; ( (ii) assessable operational work completely or partly within a declared fish habitat area- complete Part Oz of Form 1; LC (iv) assessable operational work that is the removal, destruction or damage of a marine plant - complete Part O2 of Form 1; [1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a declared fish habitat area; BX] (vi) none of the above. Integration of land use and public transport For more information refer to Guide 23, schedule 8A of the IPA, & schedule 2 of the |P Requlation, Unless you answered ‘none of the above’, the application triggers referral to QT as a concurrence agency. Railway safety and efficiency For more information refer to Guide 23, schedule 8A of the IPA & schedule 2 of the IP Regutation. Unless you answered “none of the above’, the application triggers referrat to QT as a concurrence agency. 22. The application involves: (tick the applicable box/es)— (i) a material change of use assessable against the planning scheme for a purpose mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that schedule. 0 (ii) reconfiguring a fot— (J (a) on tand that is completely or partly within a public transport corridor, and the total number of lots increases; [)(b) — on land that is completely or partly within a future public transport corridor or an airport's public safety area; [J (c) on land that is within 400m of a public passenger transport facility or a future public passenger transport facility, and the total site area is 5000m? or greater; (1d) _ for a residential purpose within the 25 ANEF contour for an airport; C1 (e) for a residential purpose resulting in 100 or more allotments. C1 (ili) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, on land that— (a) __ is completely or partly within a public transport corridor or a future public transport corridor; (J (b) will result in work that encroaches into an airport's operational airspace. (iv) none of the above. 23. The application involves: (tick the applicable box/es)— (C1 (i) a materia! change of use assessable against the planning scheme for a purpose mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that schedule, CO (ii) reconfiguring a lot— (J (a) on land that is completely or partly within a future public transport corridor, future railway land or a railway tunnel easement; (J (b) on land that is within 400m of a Citytrain passenger railway station or a future Citytrain passenger railway station, and the total site area is 5000m2 or greater; (1 (c) on tand that abuts rail corridor land, commercial corridor land or future railway land, and the total number of lots increases; (1 (4) on tand that abuts rail corridor land, commercial corridor land or future railway ‘and and an easement abutting the corridor or future railway land is created; (1 (e) on land that is completely or partly within 100m of, and abutting an approach to, a railway level crossing, and the total number of lots increases; LI (f) for aresidential purpose resulting in 100 or more allotments. (1 (iii) operational work assessable against the planning scheme, but not associated with a material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) above, involving extracting, excavating or filling greater than 50m®, on land that— (1) (a) is completely or partly within rail corridor land or commercial corridor land, and the work is not for rail transport infrastructure or other rail infrastructure; [1 (b) is completely or partly within future railway land, or a railway tunnel easement; CA (6) abuts rail corridor fand, commercial corridor land or future railway land, and the work is within 25m of the railway boundary. EX] (iv) none of the above. Page7
Page 15
INTEGRATED PLANNING ACT 1997
Moonie to Brisbane pipeline
For mora information refer to schedule 2of the IP
Regulation.
Unless you answered ‘none of the above”, the
application triggers referral to the holder of pipeline
licence No 1 issued under the Petrofeum Act 1923,
currently Santos QNT Pty Ltd, for advice.
IDAS Assessment Checklist, Version 17.0, 2 October 2006
24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
LC (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
D1 (ii) reconfiguring a lot
LD (ii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
EX (iv) none of the above.
Koala habitat area
Untess you answered “none of the above”, the
application requires referrat to the Environmentat
Protection Agency as a concurrence agency.
25. The application involves: (tick the applicable box/es)—
(1 (i) a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -
C1 (a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m2;
(©) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m2;
) extracting gravel, rock or sand from an area greater than 5000m?;
) excavating or filling an area greater than 5000m2;
f) additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
C1 (ii) reconfiguring a lot in a koala conservation area or koala sustainability area that will
result in -
(1 (a) an increased number of lots;
(1 (b) clearing of native vegetation over an area greater than 2500m?,
C1 (iii) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring @ lot mentioned in {ij) above) that will result in the clearing of native vegetation
over an area greater than 2500m?,
(iv) operational work in a koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in {i) or reconfiguring a lot mentioned in (ii) above) that is not for a domestic activity
and will result in -
(1 {a) clearing of native vegetation over an area greater than 2500m?;
(1 (b) extracting gravel, rock or sand from an area greater than 5000m2;
C1 (©) excavating or filing an area greater than 5000m?.
EX] (v) none of the above.
Od
Ole
OC
Referral coordination
An information request requires referral coordination
if the apptication involves ~
(i) ar more concurrence agencies; or
(ii) @ facility or area assessable under a
planning scheme and prescribed in
schedule? or 8 of the iP Regulation; or
(ii) development which is subject to an
application for preliminary approval
mentioned in $3.1.6 of the |PA.
For more information go to Guide2 and Guide 6.
26. Does the application trigger referral coordination?
—J No
(YES, as the application: (tick the applicable box/es)
C(i) __ triggers 3 or more concurrence agencies;
Di (ii) _ involves a material change of use made assessable under a planning
scheme and prescribed in schedule 7 of the IP Regulation;
D1 (ii) involves a material change of use (other than a dwelling house, outbuilding
or farm building) made assessable under a planning scheme, or
reconfiguring a lot, in an area prescribed in schedule 8 of the IP Regulation;
C1 (iv) _ is for a preliminary approval mentioned in s3.1.6 of the IPA
Referral agency responses prior to
lodgement
Under s3.3.2 of IPA a referral agency may give a
referral agency response on a matter within its
jusisdiction about a proposal before an application
for the proposal is made to the assessment
manager.
This is commonly the case where an appfication
requires referrai to @ building referral agency (eg.
Qid Fire and Rescue Service).
PLEASE NOTE:
27. Did a referral agency give a referral agency response under $3.3.2 of the IPA before the
application was made to the assessment manager?
KI] No
(71 YES - attach a copy of the referral agency/s response/s
The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed [DAS Assessment Checklist (if applicable}.
Page 8
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 17.0, 2 October 2006 OFFICE USE ONLY (applicable fo assessment manager) | DATE RECEIVED [ L REFERENCE NUMBERIS Page 9
Page 17
vr
v
urban
strategies
DEVELOPMENT CONSULTANTS,
TOWN PLANNING
URBAN DESIGN
31 October 2006
The Chief Executive Officer
Noosa Council
PO Box 141
TEWANTIN QLD 4565
Dear Sir
»> RE: APPLICATION FOR MATERIAL CHANGE OF USE OF PREMISES AT
@ 90 GOODCHAP STREET, NOOSAVILLE
Application is hereby made by NC Oliver Noosa Pty Ltd for a Development Permit
for Material Change of Use of Premises for Education Use Type 3 Adult at 90
Goodchap Street, Noosaville.
This report has been prepared to address the town planning matters relevant to the
proposal. In addition to this report, please find enclosed the following in support of
the application:
=» IDAS Development Application Form 1 Parts A and D and Assessment
Checklist;
« Six copies of Site Plan prepared by Middap Ditchfield; and
«Application fee of $3,020
1. SITE DETAILS
e@ The subject premises, described as Lot 2 on SP155870, is situated on the corner
of Goodchap Street and Eumundi-Noosa Road, Noosaville. Numerous
development approvals currently exist over the site, including:
= 23495 DA— Professional Office & Medical Centre A
= 2004/5231 — Shop (pharmacy), with ancillary Restaura ce bark
Medical Centre, General Store & Commercial Premise¢ ™/ RECEIVED
* 2005/866 — Medical Centre a 31 OCT 2006
» 2006/2 —- Shop (Takeaway Food & Convenience Goodg}:& Commercial
NOOSA SHIRE COUNCIL
Premises
FRONT COUNTER
Council.
SAWPPROJ\S06015S\Education ApplicationiLetter - NC Application Oct06.doc
SUNSHINE COAST
PO BOX 939 | 25 DUPORTH AVENUE URBAN STRATEGIES
MAROOCHYOORE 4558 | QUEENSLAND | AUSTRALIA [ SUNSHINE COAST ] PTY LTD
BRISBANE ACN 106 124 172 ABN 66 106 124 172
PO BOX 3368 | LEVEL 1,39 GREY STREET 07-5443 9335 | F 07-5443 9885
SOUTH BRISBANE 4101 | QUEENSLAND | AUSTRALIA [email protected]
Page 18
The site has been largely developed, with access, landscaping, amenities, parking and service areas provided in accordance with these approvals. 2. THE PROPOSAL The application seeks approval for material change of use for the purpose of Education Use Type 3 Adult to facilitate the use of part of the site by Central Queensland University for nursing and teaching education. The proposal involves the use of 647m? on the ground floor of the existing building, as highlighted on the attached plan. Flexibility however is desired to allow the education use to occur anywhere on the site with the maximum floor space occupied not exceeding 647m*. The use will operate weekdays between the hours of 9am to 5pm. We understand that only 2 student days a week are proposed. 2 full time staff will be present on the site with up to 7 staff on student teaching days. Student numbers will vary with current enrolment in the order of 120, with a maximum of 100 students expected on site at any one time. 3. THE NOOSA PLAN Under The Noosa Plan the land is located within the Noosaville Locality and included in the Community Services Zone. The assessment table for the Community Services Zone identifies Education Use Type 3 Adult as subject to impact assessment. The specific outcomes for the Zone identify Community Uses, which includes Education Type 3 Adult, as consistent uses. The proposal is assessable against the Noosaville Locality Code, Community Uses Code, Landscaping Code and Engineering Works Codes. The site has been developed in accordance with development approvals assessed and approved under the superseded planning scheme. The proposal involves the use of existing building tenancies and does not involve any external works or changes. The proposal/use does not conflict with the overall and specific outcomes of the applicable codes. The Noosaville Locality Code and the Community Uses Code encourage maximising opportunities for the collocation of community facilities and services. The site is adjoined to the west by two child care centres, Good Shepherd Lutheran Collage is located to the east and the Noosa Hospital is to the northwest of the site. The subject site provides a range of supporting services to these surrounding community uses. The proposed education use of the site will further support these surrounding uses and promote collocation of community facilities. In this regard the proposal is consistent with the intent of The Noosa Plan. 31 October, 2006
Page 19
4. CAR PARKING The Driveways and Carparking Code requires for Education Use Type 3 Adult a minimum of 1 space per 10 students of driving age, plus 1 space per employee, plus a paved setdown area for buses. As the proposal is for adult education (university), it is assumed that all students will be of driving age. Carparking has been provided for the ground floor tenancies subject to this application at a rate of 1 space per 20m? of use area, in accordance with parking requirements for the approved office and medical use of the site. Based on the proposed use area of 647m”, a carparking credit of 32 spaces exists. 32 spaces could for example support in the order of 200 students plus up to 12 staff. As indicated in section 2 above student and staff numbers are estimated to be approximately 120 and 7 respectively, which equates to a requirement of 17 spaces. The provision of 32 spaces associated with the existing 647m? use area is more than adequate to accommodate the proposed use in accordance with Driveways and Carparking Code. A bus stop currently exists in front of the site within Goodchap Street. In addition, the existing on-site service vehicle loading areas could accommodate on-site bus setdown if required. The Driveways and Carparking Code also requires bicycle parking at the rate of 1 space per 30m’. Based on the proposed use area of 647m? this results in the need for 22 bicycle parking spaces. Similarly as with carparking assessments, consideration should be given to ‘credits’ associated with an existing use, such that only the difference between an existing and proposed use is applicable. In this regard the existing approved commercial business use can be assumed to have a credit of 13 bicycle parking spaces (based on the rate of 1 space per 50m’). As such the proposed Education use generates the need for 8 bicycle parking spaces. The existing development currently provides for 6 bicycle parking spaces and a uni-sex shower facility. As an existing development, limited opportunity exists for provision of additional bicycle parking and end of trip facilities. Should Council consider additional bicycle parking provision to be essential for the use and considering surplus carparks will result from the change of use, existing carparking spaces could be converted to bicycle parking. It is our opinion however, that as substantially more students are likely to travel by car than bicycle, retaining the surplus carparks is a more desirable outcome than strict compliance with bicycle parking requirements. With regard to end of trip facilities, we note these are only required where “at least 10 bicycle parking spaces are required”. Given that only 8 spaces are required in addition to the existing use credit, it can be argued that no additional end of trip facilities are required by the code. 5. CONCLUSION The proposal is for Education Use Type 3 Adult to be accommodated within the existing building. Education use is a consistent use in the Community Services Zone and is compatible with existing uses on site. The proposal supports collocation of community uses and is consistent with the overall and specific 31 October, 2006
Page 20
outcomes for the locality and applicable codes. The site is adequately serviced by all necessary infrastructure and the proposal will not generate the need for additional carparking. The proposal does not compromise the provisions of The Noosa Plan. Approval of this application is therefore warranted. Should Council have any query regarding this application, please contact our office on 07 5443 9335. Yours faithfully URBAN STRATEGIES (SUN E COAST) PTY LTD Scott Sobey DIRECTOR 31 October, 2006
Page 21
TAN MMM MAASAAAAAHYH PODIUM LEVEL FLOOR PLAN MIDDAP DITCHFIELD Pty Ltd abn 49 064 466 708 Cnr Mary and Thomas Streets NOOSAVILLE Qid 4566 Ph - (07) 54740877 Fax - (07) 5474 0906 Email - [email protected] Proposed Area of Education Use Type 3 Adult > $5, 2 CLIENT (647m’) N.C. Oliver Properties P/L | PROJECT Office Space LOCATION . Goodchap Street Noosaville | DRAWING Space Allocation Podium Level Floor Plan ! j scale date drawn 1500 May 2004 dt Projo wore : 0320 A-02Z issue For
Page 22
| @ | LAND USE SECTION FEES ‘ww BEST SALE OF DOCUMENTS Superseded Planning Scheme Documentation 146104 520 Copy of Permit/Approval Letter 32 146120 The Noosa Plan Documentation 32 146564.1 APPLICATION FEES Material Change of Use - Code/Impact Consistent SZ 32146102 521 Inconsistent 32 146102 521 Assessment under Superseded Planning Scheme 32 146102 521 Modification to a Development Permit 32 146102 521 Extension of a Currency Period 32 146102 521 @ Operational Works - Landscaping 32 146102 521 Bldg Work assessable against the Planning Scheme 32 146102 521 PRE LODGEMENT REVIEW Half Hour 146119 522 One Hour 146119 522 ADVERTISING Purchase Advertised Applications 31 146110 523 JETTIES : Jetty Application Fee 146115 524 BONDS Performance Bond 33 95 943200 SIGNS Registration Fee 32 137510 222 Birch FEE : Search of Land Use Section file 32 146120 Liquor Licensing Request 32 146120 TOTAL $ So vo NAME: Ne OL ef Nice se Pfu ADDRESS: a- fo Box 439, MALS OCH D> LE ESSE FILE NO: OY 2435 DATE: Shoe RECEIPT NO: 92673,0 __ Signature of TP Officer: PS hres AUTHORITY NO: g 3 . / [ Zece / 23 5; 3)u- Ras SQ..e he at Urba, Swaregire tl Gere Qu tewiagon fo olafea. he weak of ct fne 7, |l=[e P.
Page 23
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION oN MCU - IMPACT SSESSMENT Details evelopment Consistent 1.0 Inconsistent 3.0 FEE CALCULATION OPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
06/2435 - MCU - Education Type 3 - Adult [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.