[Sunshine Coast Checklist - Applications Involving Land Regional Council Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS 1.4 Form PartA 1.1.1. Ensure that the form is fully completed and is a current version. 4.1.2 in the case of an MCU or Op Works below the high-water mark, owner's consent is required. 1.1.2.1 If there are multiple owners, the consent of each owner is required. 1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by signatory) or Company Seal required. 1.2. Form Part B-R Supporting Information 1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached. 4.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. IDAS ASSESSMENT CHECKLIST 2.4 Ensure that relevant sections have been checked and/or completed with regard to referrals 2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works) ENVIRONMENTALLY RELEVANT ACTIVITIES 3.1 Ensure that Part G is completed if EPA referral is required. 3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. (Refer Environmental Health for fees) FORM 2 - REQUEST TO CHANGE APPROVAL 4.1 Ensure that relevant items have been checked and/or completed including information regarding applicant details along with owners consent if not current owner of land as shown on Council records. if over multiple properties on one or more sites, consent of Body Corporate is required. PLANS 5.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational Works) accompany the application. In addition ensure that each set is complete. 5.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is unbound. SUPPORTING INFORMATION 6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that it is capable of reproduction. 6.2 In the case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. 6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping FEE 7.1. Ensure that the application fee, as determined from the Council’s adopted scale of fees, accompanies the application or has been paid. IN I INN 4 ATE Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational Work if Jetty or if including Landscaping. Land Development Lot Reconfiguration applications and Operational Work not including Landscaping Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. NSC g:\anduse\administrative processes\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 26 pages
Page 2
YES COMMENT IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) Pi tick Please refer to IDAS Checklist for complete list ease ¢ Department of Main Roads (Concurrence or Advice) « State Controlled Road Dept Natural Resources & Water « Acidsulphate soils (Advice) tts ¢ Clearing of native vegetation on freehold land (Concurrence) Environmental Protection Agency (Concurrence) ¢ Environmentally Relevant Activity (for non-devolved Council as EPA) « Contaminated land * Environmental ManagementContaminated Land Register © UXO eee * Land recently used as a ‘notifiable activity’ * Industrial land changed to sensitive uses (eg school) e Coastal related development. e Koala habitat * Wetlands (Advice only) Queensland Transport (Concurrence) e Railway Pee ° Public Passenger Transport Energex or other responsible entity (Advice) . Electricity Easements/Substations OUM (Concurrence) . SEQ Regional plan VARIOUS ° Conservation estate (Advice) OTHER STATE AGENCIES + TRIGGERS OWNER’S CONSENT (State land) Department of Natural Resources and Mines EPA For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning. NSC g:Manduse\administrative processes\application checklist.doc
Page 3
@ INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Form 1 Development Application Part A Common details TY) ‘ 4 PAY 2O Applicant details (The Appiicant is the person responsible for making the application and need not be the owner of the land, The Applicant is responsible for ensuring the information provided on the IDAS Application Form is correct. This information is relied upon by the Assessment Manager and any referral agencies when assessing and deciding this application. By lodging this appfication, the Applicant incurs the obligations and responsibilities prescribed by the IPA. Any development permit or preliminary approval that may be issued as a consequence of this application will be issued to the Appiicant.) Company of organisation name (!f applicable) CLD SET Lee's CINE PTY LTD individual applicanvContact person (if there is mora than one applicant provide additional applicant details on an attachment to this form) _ Title MP First name CARN ras CODFELEY Postal address Dry BOX 1923 2 NoosA HEADS, QuD, LSE 2 Contact telephone number (37) Sus C1EG | Mobile phone number] L417 937 46 Facsimile number (an SUUG 0266 e-mail address| GAY -oAFrey e Capesouvard -CON) Details of the premises (i, the land on which the development is proposed - refer to the advice at the end of the form) 1. Identify the premises by completing Table A, or Table B and/or Table C (ensure adequate information is given to identify the premises) Table A if the application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then goto Q2. Name of each local government area in which the mabile and temporary ERA is proposed to operate LL OR TabieB Street address for the premises (~ applicable box/es below and insert property description in the table, identify each lot in a separate row.) () (2 Street address / lot on plan for the premises (Appropriate for most applications including building applications); OF (i) (0) Street address fot on plan for the land adjoining or adjacent to the premises (Appropriate for development in water e.g, jetty, pontoon etc) (Note: Lot on plan details may be obtained from title documents, a ‘Rate’ notice, or from the local government.) Street address Lot on plan description Local goverment area (e.g, eet Steet Street Name and official suburbviocality name eat Lot No. ran ye and Logan, Caitns) 1. SE@éen ity cLose LS6N sq LOT 4 O&M] SONSHINE NOOSA HEADS SPIOOCEY| COAST ZEGIAAL QUp 4567 counnae CLNoo SA) AND/ OR Table C Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a hot, in watar (0.9. channel dredging in Moreton Bay) etc.) Coordinates (Note: place each set af coortinates in a separate row) Renee Datum Local government area Easting Northing Latitude Longitude (iFapphcable) 1. Ci coas4 [] woses 5 other Page 1
Page 4
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
2. — Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of the
following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable}
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, fake, canal)
Name of water body, watercourse or aquifer (if known)
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Lot on plan description for strategic port land Port authority for the lot
Table F Complete if the premises are in tidal water
Name of local government for the tidal area (/f applicable) Name of port authority for the tidal area (if applicable)
3. Indicate the total area of the premises on which the development is proposed: (Note: The total araa may inchide land bath above and below water)
Total area of premises (land on which the development is proposed)
. (Cm? (hectares (applicable unit)
Existing use of the premises
4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment buiKding, shop, service station, school, sugar cane farming ete.)
VACANT LAKID
5. Are there any existing easements on the premises? (e.g. for vehicular access. electricity, overland flow, water etc.)
No Oo Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal details
6. Brief description of the proposal: (a.g. 6 unit apartment building, 30 lot residential subdivision, a bore, aquacutture etc.)
22 unts o) Lor s, ig unts ¢ 3Sullasm tor é
7, Does the proposal include new building work or operational work {including any services) on the premises?
i] No @S - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
Resource entitlement (if applicable) - further information is provided in the advice section at the end of the form
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habitat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.)
tue - Goto Qg Oo Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource allocation or
entitlement must be submitted with the application. You do not need to answer Q9 - go to the next section.
Nature of State-owned resource
TableG Nature of evidence required
Allocation/entitlement
reference number
State Government Date of | Date of
Name of authorising officer Position of authorising officer Department issue _| expiry
Owner’s consent (if applicable) - further information is provided in the advice section at the end of the form
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and not
within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment fo this form if applicable.
Date consent
was obtained
Table H Premises Owner's name/s Details of the premises owned
and postal address (street address or lot on plan description)
1|Chp Sé€m£2S |Lots S +E
CNE PTY LTD | (Lot 4 on SP 100064)
Owner's signature*
Comer A h.
* Owner's signature cannot be provided on the form if you intend to submit the application electronically. Owner’s consent must be provided to the asbessment manager on an
attachment containing appropriate written documentation of the owner's consent. Ifthe owner is a company, $127 of the Corporations Act 2001 {(Cwealth) details how a
company may sign as owner, Templates for the provision of owner's consent are available on the IPA website .
Page 2
Page 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008 Attachments and supporting information (Complete Table | - Use a separate row for each type of attachment or information, including information required under this Part) Please ensure all documentation submitted with this form, inckding other Parts of Form 1, or owner's consent, etc, are securely attached to this Part of the Form. Description of attachment or information thes - Table | i Title (if appicable) Method of delivery to (19 Pat C of Form 1 owner consent evidence SOUT? | (esa Genert Athodty,Jomes Stree Trae Repo) Date assessment manager ' SEE AVACHeED cust ovee THE “4 OUNTEL eve. on | sevon Co¥ |acvor 6O\| SCVO2 604 cou Kevo2 co2| Scvor 008 lecvou Go2 |Scvoad bO0S Sevo2r cos| SevOr Nl VOX FOR t f 1 Portable Long Service Leave (PLSL) levy (Applicable for certain building and construction work valued over $80,000 only) 10. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: (~ box if applicable) the application seeks a preliminary approvat only; 7 the application is not for building and construction work under the Building and Construction Industry (Portable Long Service Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out solely for farming purposes: fand clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of regrowth, thinning vegetation or controlling weeds or pests); (Call costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or e@ CU the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 - Complete and submit a QLeave Nofification and Payment Form (no payment required if owner-builder permil number stated). The receipted form must be sighted by the assessment manager before a development permit can be given. 11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information) No - End of Part A (5 res - Answer Q12 below ( To be indoded in Building Applicat ) 12. Has the PLSL levy been paid? O No - (NOTE: An application can be todged prior to payment of the applicable PLSL levy. However, the levy must be paid and the receipted form sighted by the Assessment Manager before a development permit may be given for this application. To pay the levy you will need to complete and submit a Notification and Payment Form to QLeave,) Oo Yes - Complete Table L and submit, with the application, the ‘yellow’ (Local Government's (Council) / Private Certifier's) copy of the receipted QLeave Form. , - QLeave Project Number Table L Amount paid Date paid (6 cigits, starting with A, B. E, L or P} OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional) ' ; . Receiving ” Reference e@ Fee (8) | [toSo Date received is) 3 [os officer's name br, Gon numbers | © ¢/ S54 \ 7 NOTIFICATION OF ENGAGEMENT OF PRIVATE CERTIFIER To: Council. | have been engaged as the private certifier for the building work referred to in this application. Date of engagement Name BSA Certification license number Buitding ctassification/s QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable) Amount paid Date receipted form “rv Oteave Project Number ($) Date paid sighted by Name of officer who sighted the form assessment manager Privacy Statement The information collacted on Form 1 will be used by the Department of infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application. Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by lagisiation (including the Freedom of information Act 1992) or a required by Parliament, This information may be stored in a DIP database. The information collected will be retained as required by the Public Records Act 2002 Page 3
Page 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Advice for completing Part A (For more detailed advice, refer to IDAS Guide 1 (Making and IDAS application)
General advice
* Part A of IDAS Development Application Form 1 must be completed and accompany all development applications. The applicant is responsible for
answering all questions fully and correctly, unless following a response there is a statement to go directly to another question. The Assessment Manger
may refuse to receive an application that is not property made.
« The IDAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the Building Act
1975 only, i.e. those applications requiring the completion of Parts A and B only.
Applicant details
« ifthe applicant is a company of organisation, a contact person must be nominated. The applicant's signature is not required to be provided under the IPA.
Details of the premises
« The term ‘premises’ is defined by the IPA, schedule 10 to mean a building or other structure, and land (whether or not a building or other structure is
situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
* Details of the land are not required if the application involves a mobile and temporary Environmentally Relevant Activity only. Instead complete Table A.
* The premises may be identified in a number of ways— .
« Street address and lot on plan are most common and will apply to most applications.
* Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the premises
the subject of the application. Eastings and northings using GDA94 datum is preferred, but longitude and latitude and other (specified) datum such as
Zone Reference or GS84 may be provided.
The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act.
* Strategic Port Land is within a local government area but a local government's planning scheme does not apply on Strategic Port Land. Strategic Port
Land is declared under the Transport Infrastructure Act 1994. For further information go to IDAS Guide 11 (Development on strategic port land) and the
Queensland Transport (Ports) website.
« ‘Tidal water is defined in the Coastal Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a local government and for strategic port land is
defined in the IPA (schedule 10), Generally, the area below ‘high-water mark’ {defined by the Coastal Act in relation to high water mark at spring tides)
establishes the boundary of a tidal area. Land below high water mark is not within a local govermment's area unless provided for under the Loca! Govemment
Act 1993. Unless otherwise provided for by legislation, a local government has no jurisdiction below high water mark, A tidal area for strategic port land is
within the jurisdiction of the relevant port authority, while the Environmental Protection Agency generally has jurisdiction for a tocal government tidal area,
However, the !PA gives local governments jurisdiction for assessing and deciding applications for prescribed tidal works within the local government tidal area,
and the planning scheme may be applied to that assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
« Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a prescribed State
resource. Schedule 10 of the integrated Planning Regulation 1998 (\PR) prescribes the State resources, including State-owned land, where evidence is
required to be given, and the evidence required to support the application. Link to Integrated Planning Regulation. Section 3.2.1(10)(a}{ii) states an
application cannot be taken to be properly made without the required evidence.
For applications involving the taking or Interfering with water under the Water Act, the development application may be made at the same time as the
request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
» For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by gazette
notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referral to the Department of Main Roads.
* Evidence may be required from more than one Department responsible for a State-owned resource, e.g. from the Environmental Protection Agency for
quarry material below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land above high water mark.
Owner’s consent
* Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner's, if the application
involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined under the Coastal
Protection and Management Act 1995; or work on rail corridor land defined under the Transport Infrastructure Act 1994.
+ Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during the
processes of the application or in the event of an appeal about the outcome of the application.
+ ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to receive the rent
for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
+ Templates are available from the IPA website for the provision of owner's consent as an attachment to this form. However other documentation may be used
for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
© Qwners consent, if required, must be provided even if the applicant is the owner, Owner's consent is not required for a mobile and temporary ERA.
Portable Long Service Leave (PLSL) Levy
* The Building and Construction Industry Portable Long Service Leave Scheme provides long service teave entitlements to workers in the building and
construction industry who would be unlikely to accrue enough service with one employer to qualify for tong service leave. To fund the scheme, a Portable
Long Service Leave Levy (PLSL levy) is collected on certain building and construction work carried out in Queensland.
+ The PLSL levy amount and other prescribed percentages and rates for calculating the levy are stated in the Building and Construction Industry (Portable
Long Service Leave) Regutation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the Building and
Construction Industry Training Levy.
* The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to the
PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties, pipelines,
fences or earthworks, and works for subdividing, irrigating or draining land.
* The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may be issued.
« The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL levy. Building and
Construction Industry Notification and Payment Forms are available from any Queenstand post office or agency, on request from QLeave, or can be
completed on the QLeave website at www.qleave.qid.gov.au. For further information contact QLeave (Tel: 1800 803 481 Web: www.qleave.qid.gov.au )
Page 4
Page 7
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application
P art E b- 5 MAY 7008
Building &/or operational work assessable against a planning
cvcatin
From Counter
Nature of the works ony
1. Nature of work that requires assessment avast planning scheme:
(C1 Building work - Complete Table A Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme?
L |
(ii) Are there any current approvals associated with this application? (e.g. material change of use}
ONo (Yes - Provide details below
List of approval reference/s Date approved Date approval lapses (if known)
{4.
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
CD Roadworks C1 Stormwater C1 Water infrastructure C1 Clearing vegetation under the planning scheme
(1 Drainage works = [1] Earthworks 1 Sewerage infrastructure
Landscaping OC Signage (1 Other - specify
(iii) What type of approval is being sought? (NOTE: If you have indicated multiple operational works in question (i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[A bevelopment Permit C1 Preliminary Approval 21 Both (specity below)
(iv) Is the operational we necessary to facilitate the creation of new lots (ie. subdivision)?
(No Yes - Specify the number of lots being created 4
(v) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
C1No C1 Yes - Complete Table (a)
Table Bia) List of approval references Date approved Date approval lapses (if known)
1.
2. What is the dollar value of this operational work? (ie. the totat vaive including GST, materials and labour) $ 20,000 , 00°
t
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement} Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works (including the ovel THe
extent of any cut and ff) C) Confirmed cou Tek
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part E
General advice
. Part A must also ba completed for alt {DAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi [A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
Page 1
Page 8
Appointing a person or persons as your attorney
As principal {the person making the appointment), you
complete this form by writing your responses on the lines and
ticking the appropriate boxes. Then sign the form and have
your signature witnessed. Any adult may witness your
signature. However, if this power of attorney is required to be
registered under the Land Titles Act, the witness must be a
justice of the peace, a commissioner for declarations, a lawyer
or a notary public.
Appointment of attorney or attorneys
1. CBD SETTLERS COVE PTY LTD ACN 114 192 773 of Level 5, 181 St Georges Terrace,
Perth WA 6000 appoint the following person as my attorney: GARY MICHAEL GODFREY of
6 Daybreak Court, Castaways Beach Qld 4567.
2. Are you appointing more than one attorney?
No > Go to clause 4.
( sYes.
3. How do you prefer that they make their decisions? (Tick one box only)
(]_ Severally (any one of them may decide)
C1] Jointly (unanimously)
As a majority (specify e.g. simple majority, two-thirds majority, etc.)
C1 Other"
Note: The Powers of Attorney Act 1998 allows you to appoinl successive attorney/s for a matter so that the
power is given to a particular attorney only when power to a previous altorney ends. You can nominate the
circumstances that a power will end (eg. if x leaves the jurisdiction, y may act).
4. The attorney/s power ts subject to the following terms:
To execute any statutory and local authority application for approval and any associated
documentation including but not limited to those for land use, land development and building,
and including but not limited to applications for Reconfiguration of Lot, Material Change of
Use and Operational Works relating to the development known as Settlers Cave Noosa
Heads owned by CSD Settlers Cove Pty Ltd ACN 114 192 773 being part of what was
originaily lot 4 on SP100064, County of March, Parish of Weyba.
5. The power given to my attarney/s begins:
] immediately.
CJ on this date:
(Write here the date when you want the appointed person/s to begin acting as your attorney.)
1] _ on this occasion:
[Write hare the occasion on which you want the appointed person/s to begin acting as your attorney.)
Note: if you do not complete clause 5, the power begins immediately.
6. = This powel of 3 torney gives my attorney/s power to do, on my behalf, anything that |
could lawfully dd by an attorney (other than a personal/health matter), subject to the
(Director) (Director/Secretary]
: *°25BD SETTLERS COVE PTY LTD ACN 114 192 773
(D
SADocuments\$ 16S7ACLH_51657_037.D0C
Page 9
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
AN Form 1 Development Application
IDAS
Assessment Checklist
IDAS Development Application Form 1 is the approved form for all development applications under the integrated Planning Act
1997 IPA}. Form 1 is made up of various Parts.
Part A (Common details) of Form 1 must be completed for all applications. The relevance of other Parts of Form 1 depends on
the nature of the application.
Form 1 also includes this IDAS Assessment Checklist, which is used to assist in determining State assessment and referral
requirements, and the Parts of Form 1 relevant to the application.
Section 1 and all other relevant sections of the IDAS Assessment Checklist, as identified in the Table below, must be completed
for all development applications except those proposed on land in an urban development area, or for building work requiring
assessment against the Building Act 1975 only.
For more information about development applications on land in an urban development area, refer to www.ulda.qid.gov.au.
For more advice about building applications refer to Part B of the IDAS Application Form.
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or fog onto the DIP website www.dio.qid.gov.au for help
For all IDAS development applications (except those for building work requiring assessment against the Building Act 1975 only) - complete Section 1 of this
checklist
Does the application seek approval to materially change the use of the premises? 0 Yes No
if yes - complete Section 2 of this checklist.
Does the application seek approval to reconfigure a lot? OU Yes faNo
if yes - complete Seetion 3 of this checklist and Part F of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out operational work? ves CINo
if yes - complete Section 4 of this checkiist.
Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? C1 Yes Efto
if yes - complete Section 5 of this checklist.
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development OO Yes [to
application?
it yes - complete Section 6 of this checklist.
Does the application seek approval to carry out building work requiring assessment against a focal government 0 Yes [No
planning scheme?
i yes - complete Form 1 Part E. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975? C1 Yes |] No
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of IDAS Application Form 1. Assessment is by a
building certifier.
Ror rey
15 MAY 200g
Page 1 .
OURS
Front Osi us
Page 10
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checkfist, Version 21.3, 9 May 2008
SECTI 0 N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE
1.1A | ls any-part of the proposal intended to be carried out on a Queensland Heritage place under the Queensiand Heritage Act 1992?
lo- Gooar.t8 ((] Yes
{f yes, has an exemption certificate for the proposal'-' been issued under the Queensland Heritage Act 1992?
Cl Yes CINo
If no, is the proposed work emergency work for the Queensland Heritage Act 1992?
(0 Yes CINo
If1no, is the work being carried out by the State?
OC Yes No - (Complete Form 1, Part C:} This application requires assessment by the Environmental Protection Agency (EPA).
If EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
JPA, schedule 3, part 1, table 5. tem 2, IP Reguiabon, scheduie 2, table 1. em 11, table 2. tem 18, IPA, section 1.3.5 (Definitions for terms used in development,
1.1B | Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered ina
Locat Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Gotoat.2 (1 Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government against the IDAS Code in
the Queensland Heritage Regulation 2003. If the development involves building work and the focal goverment is not the
Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency.
IPA, scnedule 8, purt |, table 5, tem 2A, schedule 9, tables 1.2.3 44 5 IP Raguiaton, scnedule 2. table 1, dem 1 1A, IPA, section 1.3 5 (Defmbons for terms used wn developmert),
Queensland Hentage Regulation 2003, scredule 2 (IDAS Coda)
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2
Doeg’the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 (] Yes
If yes, is an allocation notice required under the Water Act 2000?
CINo O01 Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
oO No — (Complete Form 1, Part Kr) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRWis not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it
(Complete Form 1, Part Kz). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrance Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8. part 1 table 5, tem 1, IP Regulation scheaule 2 table 2, tem 11; iP Reguiaton, scheaule I, table 5, item 2 twikd mer area) Water Act 2000 secion 966C. Wid Aivers Act
2005, section 33A.
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
13
rte. proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
lo-Gotoard (J Yes
It yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
(J No
{f no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each
proposed ERA?
oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. if the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Gotoat.4
Yes
If yes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
(Yes
If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
oO Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the pusposes of both the Environmenial Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
No - An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
(J No - Answer the following question/s on the next page
‘1 In this IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
Page 2
Page 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA (cont)
lf no, is any part of any ERA intended to be located in a high preservation area?
UO Yes
Mt yes, is each proposed ERA one of the following? _ - -
i) ERA, item 15 (sewage treatment) oo __ ‘Or No i OYes;
i) ERA, item 16 (municipal water treatment plant) ; _ CNo, a Yes °
(ii) ERA, item 19 (dredging material) — , ; 'ETNo! TI Yes!
“(w) ERA, item 20 item 20 (extracting rock or other material) loc located outside waters and the ‘oO No oO Yes |
activity is a borrow pit of not more than 10,000m for - i
* — Specified works under the Wild Rivers Act 2005, or
+ _ residential complexes, as defined under the Environmental Protection Act 1994
i ———— - . -
| ) (vy) ERA, item 22 { screening etc. materials) and carried out outside waters and the activity tm No} (J Yes
1
is for -
« — specified works under the Wild Rivers Act 2005; or
+ _ for residential complexes, as defined under the Environmental Protection Act 1994
* (vi) ERA, item 11 (crude oil or petroleum product storage) and the activity i is - LI No \
* alevel 2 ERA; and | |
|
* for residential complexes, as defined under the Environmental Protection Act 1994; &
* carried out outside a designated urban area, as defined under the Wild Rivers Act i
2005 - I |
{vii) An exempt environmentally relevant activity, as defined under Environmental Protection (No! (1 Yes
Act 1994, in a designated urban area, as defined under the Wild Rivers Act 2005
If yes to any oni one of {i)- (vii). above — Unless the application is consistent with any property development plan applying to the land, and
the application is accompanied by an allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This
application requires assessment by the Administering Authonity for the purposes of the Environmental Protection Act 1994, If the
Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Subject to
any limitations in the declaration for the wild river araa and the Wild Rivers code, assessment is also required for the pusposes of the Wild
Rivers Act 2005. in particular, ERAs 15 and 16 and an ‘exempt environmentally relevant activity’ do not require assessment for the
purposes of the Wild Rivers Act 2005 if the proposed is located in a designated urban area
|
|
bea
If no to all of (i) - (vii) above - An application for the ERA/s will be taken (0 be not properly made and the Assessment Manager must
refuse to receive it
CINo
{f no, is any ERA an item 20 ERA (extracting rock or other material) intended to be located outside waters?
oO No = Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by
an allocation notice, the Assessmem Manager must refuse to receive it. (Complete Form 1, Part G). This application requires
assessment by the Administering Authority for the purposes of both the Environmental Protection Act 1994 and the Wild Rivers Act
2005. if the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
Yes
If yes, does the ERA meet the following? _ _
| ‘(i) the activity is located inside a flood management area anda borrow | pit of not lo No| OD Yes
more than 10,000m? for - !
\
!
* — specified works under the Wild Rivers Act 2005; or I
residential complexes, as defined under the Environmental Protection Act 1994
_ \Cno,O Yes”
If yes to either (i) or (ii) above ~ Unless the application is consistent with any property development plan applying to the land, and
the application is accompanied by an allocation notice. the Assessment Manager must refuse to receive it. (Complete Form 1,
Part G). This application requires assessment by the Administering Authority for the purposes of both the Environmental
Protection Act 1994 and, subject to the declaration for the relevant wild river area, the Wild Rivers Act 2005. If the Administering
Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
If no to both {i} and (ii) above - An application for the ERA will be taken to be not properly made and the Assessment manager must
refuse to receive it.
IPA, scheduie 3 pant ' tae 2 tem 1 IPA, schedule 9 part 1, 120-6 3. "ems Bard $ iP Rayuiston scheouie 2, ‘ame 2. tems 1 ar.t23 Emysoamental Protechon Act 1994, section TIAA wid
nyer area) bud Rivers 4ct2005 section 43A relevant w'd mer dec'aratunr, “id Revers Code
Page 3
Page 12
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
WITHIN THE LIMITS OF A PORT
14
ls apy part of the premises within the limits of a port under the Transport infrastructure Act 1994?
No -Gotoats ([) Yes
{f yes, is that part of the premises below high water mark?
LJ No
(J Yes - !fanswers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8 - Answer (a} to {c) below. This application requires assessment by the Port Authority for the land. If you answer no to (a), (o) and
(c) below, the Port Authonity for the Port has jurisdiction as Advice Agency.
(a) _ Is any part of the proposal within 200m of a shipping channel or an entry and exit shipping corridor for the Port?
Oo No O Yes — The Port Authority for the Port has jurisdiction as Concurrence Agency.
{b) |s any part of the proposal within 1,000m of a swing basin, a commercial fishing wharf, a mooring, anchorage or spoil grounds?
CINo (1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
(c) _\s any part of the proposal within 1,000m of a planned port facility identified in a land use plan?
CINo (1 Yes - The Port Authority for the Port has jurisdiction as Concurrence Agency.
1P Regulavon, schedule 2 tanie 2, rams 15 and 16.
DECL
ARED FISH HABITAT AREA
1.5
Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
tao + Golo 016
(1 Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule 8,
this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the Assessment
Manager for the application, the agency has jurisdiction as Advice Agency.
IP Regulation, schedule 2, table 2 tom 26
COMMUNITY INFRASTRUCTURE
1.6 | ls anypart of the premises designated for community infrastructure?
No - Gotoat.7 [] Yes
If yes, is the community infrastructure intended to be provided by a public sector entity?
No 0 Yes
If yes, is the land owned by or on behalf of the State?
LlYes [INo
If no, is the development for the following?
(i) For the designated purpose CNo (ClYes
(ii) Carried out by, or on behalf of, the designator CINo (Yes
If no to either or both (i) or (ii) above, is the proposed development assessable under the planning scheme?
oO No oO Yes - This application must be referred to the Queensland Govemment department administering the Act authorising the
development for the designation as Concurrence Agency.
IP Regulation, schedule 2, table 3, dem 7
WASTE WATER MANAGEMENT
17]
Does.the proposal involve the establishment or expansion of a waste water disposal system?
bo + End of Section! (C] Yes
If yes, is any part of the disposal system proposed to be located in an area declared to be a catchment area under the Water Act 2000?
LJ No - End of Section: (_] Yes
If yes, is the proposed waste water disposal system an environmentally relevant activity (ERA) under the Environmental
Protection Act 1994?
(1 Yes - Endo Section! []No
If no, is the proposed development involving the waste water disposal system assessable under the planning scheme?
oO No - End of Section 1 oO Yes - This application requires assessment by the Department of Natural Resources and Water (NRW) as
Concurrence Agency. End of Section t
IP Rogulaton, achedute 2 taole 3, dem 5.
Page 4
Page 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
S ECTI ON 4 Section 4 must be completed when the application seeks approval to carry out operational work.
PLANNING SCHEME
41 Is any of the proposed operational work assessable under a planning scheme?
[No - Gotoa42 (Yes ~ (Complete Form |, Part E) Answer Qs4.1.1 - 4.1.7 below.
STATE-CONTROLLED ROAD
414 oe of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No
It no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
CNo (1 Yes - This application must be referred to the Department of Main Roads (DMA) as Concurrence Agency.
DO Yes
If yes, is all of the proposed operational work associated with the following?
(i) A material change of use that is assessable under the planning scheme
CiNo (1 Yes
(i) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots = []No [_] Yes
abutting the State-controlled road
{f no to either or both (i) or (ti) above - Answer (a) - (c) balow
(a) Is any of the proposed operational work associated with access to a State-controlled road?
E]No CO Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(b) Is any of the proposed operational work for filling or excavation?
LINo [J Yes
It yes, is the operational work proposed in a future State-controlled road not defined by route?
a] No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
O Yes - This application must be referred to DMA as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
CINo
C1 Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMA) as Concurrence Agency.
C1 Yes - This application must be referred to OMA as Advice Agency.
IP Reguiauon, schedule 2, table 3. item 3, IP Reguiaton schedule 2, lable 3, tem 1b}.
ACID SULFATE SOILS
4.1.2
Is any of the operational work proposed in a local government area listed" in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils?
No -Gotoa413 [] Yes
Ityes, is the natural ground level of any point where work is being carried out less than 20m AHD?
LJ No O Yes
\tyes, does the proposed operational work involve the following?
{i} Excavating more than 1,000m# of soil or sediment at or below 5m AHD LINo L Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on [JNo (1 Yes
land, soil or sediment at or below 5m AHD
{f yes to either or both (i) or (ii) above - This application must to be referred to the Department of Natural Resources and Water (NAW) as.
Advice Agency
IP Regulation. schedule 2, tanie 3, tem 4, State Planning Poley 2 02, Planning and Managing Oevelopment involving Aad Sulfate Souls, sechon 3.6.
- iar neon
1. ja Lig
o oe
Peery
qr
“e a |
= TS May 200g
&
Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabootture, Caims, Calliope, Caloundra ard) all Cagpentaria, Cook, Coolopta, Jug!
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Isis, Jchnstone, Livingstone, Logan, Mackay, Maroochy, Mat ugh, Mian Vale. Mpmingion, Nope. Piny
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiara, Torres, Townsville, Whitsunday wes. “!
%
Page 27 f me et
avo
an
Page 14
(INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
EASEMENTS AND SUBSTATIONS
413 co of the proposed operational work for filling or excavation?
No-Gotoati14 [Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
C Yes LJ No - Answer both (a) and (b) below
(a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
(No (Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
CINo (1 Yes This application must be referred to the entity as Advice Agency.
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
CINo 1 Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Regulation, schedule 2, table 3 tem 10{a), IP Regulation, schedule 2, table 3, xem 10(0).
ls any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
lo -Gotoa41.5 (C] Yes
4.1.4
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
(No O Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No (Yes - This application must be referred to the licence holder as Advice Agency.
Pp Regulation, schedule 2, table 3, tem 17.
PUBLIC PASSENGER TRANSPORT
4.1.5
ls any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
one threshold?
No - Go to 04.1.6 O Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2. table 3, tem t4.
RAILWAY SAFETY AND EFFICIENCY
4.1.6 |\s any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No - Go to 04.1.7 CO Yes - this apptication must be referred to Queensiand Transport (QT) as Concurrence Agency.
1P Regulaon, schedule 2, tabla 3, dam 15
KOALA CONSERVATION
4.1.7 |1s any part of the premises in a koala conservation area or koala sustainability area?
0 - Go to 4.2 0 Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in either Q2.1.8 or Q 3.12)?
(Yes -Gotoas2 (JNo
Ino, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
D1 Yes-Gotoos2 [No
If no, will the activity result in the following?
i . Clearing of native vegetation over an area greater than 2, 500m2 a No Og Yes :
(i Extracting | gravel, rock or sand from an area greater than 5, 000m2 a No |) Yes
(ili) Excavating or filing an area greater than 5,000m2 _ 7 ‘oO No |L1 Yes
If yes to one or more of (i) - (iii) above - This application must be referred to the Environmental Protection Agency (EPA) as
Concurrence Agency.
IP Requiaton, schedu'e 2 tab 3 dem 19
WILD RIVER AREA - Although legistation provides for assessment of operational works for residential, commercial and industrial development for ope f the
Wild Rivers Act 2005, currently no declarations for any of the wild river areas apply the Witd Rivers code to that type of development, 2 iow
Page 28
15 MAY 2008
e
Ovi - se ah ~~
Front Counter
Page 15
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
ASSOCIATED WITH RECONFIGURING A LOT; RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
AREA
4.2 BN of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
No
-Got0a43 []Yes
If yes, is any part of the premises in a wild river area declared under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local govemment.
C1 Yes
If yes, is the proposed operational work for residential, commercial or industrial purposes outside a designated urban area,
as defined by the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part £) The operational work associated with reconfiguring is assessed by the local govemment.
o Yes (Complete Form 1, Part E) The operational work associated with reconfiguring is assessed by the local govemment, and subject to the
declaration for the relevant wild river area, assessment by the local government is required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8, part |, table 4. tam 2, IP Reguianon, schedule 1, part 2 table 5, item t(¢); Wild Rivers code (Note. ine code does not curently contain apokcabla provsions for residential,
indusiral of commercial development inside a designated urban area).
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA
4.3 eat of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999 applies?
No-Gotoas4 []Yes
If yes, is the proposed clearing assessable (i.e. not an exception) under schedule 8, part 1, table 4 of the IPA?
(LINo-Gotoss (Yes
If yes, is the proposed vegetation clearing a relevant purpose under the Vegetation Management Act 1999, section 22A
for one or more of the following?
(0 A project declared to be a significant project under the State Development and Public Works Un -O Yes |
L Organisation Act 1971, section 26 _ oe ye |
fi) Necessary to control non-native plants or declared pest : :O No (1 Yes
ii) To ensure public safely : _ O No (] Yes °
1 (iv) “For establishing a necessary fence, firebreak, ‘road or vehicle t track, or for constructing oO No oO Yes”
necessary built infrastructure, if there is no suitable alternative site for the fence, firebreak,
road, track or infrastructure oe .
(vy) A natural and ordinary consequence of other assessable development for which a (LINo ‘ oO Yes :
development approval as defined under the Planning Act was given, or a development i :
1
' application as defined under the Planning Act was made, before 16 May 2003
{(i)_ For fodder harvesting _ __ SIINo "Da Yes :
(vii) For thinning oS Oo al No ‘oO Yes‘
(viii) For clearing of encroachment re “Oo No o Yes |
(ix) For an extractive industry Oe ‘oO No a Yes |
(x) For clearing regrowth on leases issued under the Land Act 1994 for agriculture or grazing ‘T] No ‘da Yes *
purposes
' (xi) For clearing regrowth on freehold land, or indigenous land, in a wild river high preservation ‘ LINo (L)Yes ,
area,
If no to all (i) - (xi) above - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application.
If yes to any one of (i) - (xi) above, is the proposed clearing associated with a material change of use or reconfiguring a
lot for which referral is required in relation to clearing vegetation (i.e. did you answer ‘yes’ to all questions in either Q2.1.4 of Q.3.3)?
CI Yes - Goto.as.4
0 No - Answer (a) (0) and (c) on the next page of this Checklist.
Page 29
Page 16
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
VEGETATION CLEARING; KOALA CONSERVATION; WILD RIVER AREA (cont
(a) __ Is any of the proposed clearing in an area declared as an area of high nature conservation value (other than a
wild river high preservation area) or an area vulnerable to land degradation under the Vegelation Management
Act 1999?
oO No ~ Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water (NRW). If
NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
O Yes
Ifyes, is any of the proposed clearing for (v), (vi), (ix) or (x) above?
Oo No - Complete Form |, Part J. This application requires assessment by the Department of Natural Resources and Water
(NRW). if NAW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
oO Yes - The clearing is not a relevant purpose and the Assessment Manager must refuse to receive the application
(b) Is any of the proposed clearing in the high preservation area of a declared wild river area?
O No - Complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and Water (NRW). if
NAW is not the Assassment Manager, the agency has jurisdiction as Concurrence Agency.
CO Yes
If Yes, is any of the proposed clearing for the following purposes?
any | sea Clearing for pur 4
A) For (i) (vi), (vil) or (x) above . CINo | Fl ¥es |
(ii) For (x) or {xi) above and in a high preservation area outside of a Ono 'D1Yes i
registered area of agriculture as defined under the Vegeiation : |
Management Act 1999 _ an 4
If no to either or both (i) or (ii) above - Subject to the declaration for the relevant wild river area, the application
requires assessment for the purposes of the Wild Rivers Act 2005 ~ Complete Form 1, Part J. This application
requires assessment by the Department of Natural Resources and Water (NAW). If NRW is nat the Assessment
Manager, the agency has jurisdiction as Concurrence Agency.
If yes to either or both (i) or (ii) above, is there a property development plan approved under the Wild
Rivers Act 2005 applying to the land?
oO No - The clearing is not a relevant purpose and the Assessment Manager must refuse 1o receive the application.
oO Yes - Unless the application is consistent with any approved property development plan applying to the land, the
Assessment Manager must refuse to receive it, Subject to the declaration for the relevant wild river area, the
application requires assessment for the purposes of the Wild Rivers Act 2005 ~ If an application is made
complete Form 1, Part J. This application requires assessment by the Department of Natural Resources and
Water (NRW). If NRW is not the Assessment Manager, the agency has jurisdiction as Concurrence Agency.
(c)_ Is any of the proposed clearing in a koala conservation area or koala sustainability area?
CI No - Goto 04.4 (1 Yes
Ifyes, is any of the proposed clearing associated with reconfiguring a lot for which referral is required in
relation to proposed clearing in a koala conservation area or koala sustainability area (ie. did you answer
‘yes’ to all questions in Q3,12)?
D1 Yes -Gotoa14 []No
If no, is any of the proposed clearing over an area greater than 2,500m??
CINo - Goto 04.4
C1 Yes - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence
Agency.
IPA scheiue 8, oat } able + tems 14-1G. IP Regulator, scheawie 2, table 2 tert 5 ivegetaion cle1mng) IP Reguistor scheuue 2 table 2 tem 34 (kaw conservetony IP Reguaation, soheduie 1. dart
3, wore 4, tam {vegelation ceaang wid fiver area): Vegetaton Management Act 1990. section 224 (vegetation clang wid aver area), Wild Rivers Act 2008, sectons JIF and 134, Wid Aner Code
Page 30
Page 17
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkfist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA
44
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under the Wafer
Act ), section 20{2), {3} or {5)), or from a dam constructed on a watercourse or lake?
No-Gotea45 ([] Yes - Answer (a) and (b) below
{a} Are the operations mentioned as self-assessable development in the following?
(i) A water resource plan under the Water Act 2000 (J No 0 Yes
(ii) A wild river declaration under the Wild Rivers Act 2005 [_] No LD Yes
(ii) A regulation under the IPA or the Water Act 2000 LINo LJ Yes
{f no to alll of (i) to (iii) above - This application requires assessment by the Department of Natural Resources and Water (NAW). If NAW is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to (b)
{b) 1s any of the proposed operational work to be carried out in a wild river area under the Wild Rivers Act 2005?
Yes
Ityes, is the work for the following? re
a _Awater pump oo Clno [| CO Yes (Complete Form 1, Part Ko) |
|
| (i) Water storage (1 No
© (iii) Gravity diversion from a watercourse EINo = (1 Yes (Complete Form 1, Part Ks)
(iv) Watercourse diversion CINo — [1 Yes (Complete Form 1, Part Ke)
. (¥)_ Other work for taking or interfering with water _ LINo — 1 Yes (complete Form 1, Part Ky)
tf yes to any one of (i) to (v) above - if any part of the proposal relates to operational work that interferes with water in a high preservation
area, of in a nominated waterway (other than for a dam or weir), the application will be taken to be not properly made and the Assessment
Manager must refuse to receive it Alf other proposals are subject to the dectaration for the relevant wild river area, and assessment may
be required for the purposes of the Wild Rivers Act 2005. The application wil require assessment by the Department of Natural Resources
and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(Complete the relevant Form 1, Part K as indicated in the table above i an application is made.)
CINo
If no, is the work for the following? ee ape
(i) Awaterpump LI No [C1 Yes (Complete Form 1, Part Ke)
@) Water storage _ CI No | £71 Yes (Comptete Form 1, Past Ko)
(ii) Gravity diversion from a watercourse (No | (1) Yes (Complete Form 1, Part K.)
Hiv) Watercourse diversion _ LI No |) Yes (Complete Form 1, Part Ks)
iW) Other work for taking or interfering with water CINo |(1 Yes (Complete Form 1, Part Ks)
|
If yes to any one of (i) to (v) above — The application will require assessment by the Department of Natural Resources and Water (NRW). if NRW
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
{Complete the relevant Form 1, Part K as indicated in the table above.)
IPA. schedule 8. part |. table 4. tems 3(a). IP Reguiation. schedule 2. table 2. tem 3. iP Regulation. schedule | part 3 table 4. tems 3 and 3A. Water Act 2000. section 966A fwild ner
area} Wild Rivers Act 2005. section 434, retevant wild aver dectarahon, Wid Rivers Code.
45
Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
iptertering with artesian water (other than using a water truck to pump water)?
0 - Go to 04.6 0 Yes - (Complete Form 1, Part K,) This appication requires assessment by the Department of Natural Resources and Water (NRW). if
NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
1P4 schedu's 8. part 1. able 4 dem to) IP Reguaten scnedwe 2 tibia 2 tam @ IP Regu'abon schedu® 1 cat 3 ‘abie 4 em 3, relevant wid aver declaration. Wig Aivars Cogs Note
the code does nor curently con‘an applicable provisions ‘or tong of ttarenng wth artesian water)
Page 31
Page 18
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continuec)
4.6 — | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
verland flow water (other than using a water truck to pump water)?
1 Keo -Got0047 — ] Yes - Answer (a) and (b) below
(a) Are the operations mentioned as assessable development in the following?
{i) Awater resource plan under the Waler Act 2000 LJ No CO Yes
(ii) A regulation under the IPA or the Water Act 2000 [No (1 Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Ks). This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
(b) Is any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?
| No oO Yes - ifany part of the proposal relates to operational work in a high preservation area other than works slated in a wild nver
declaration for the area to be assessable development for which a development application may be made, the application will
be laken to be not property made and the Assessment Manager must refuse to receive it All other proposals are subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of the Wild Rivers Act 2005.
(Complete Form |, Part Ke if an application is made.)
IPA, scPeduie 8 part labie 4. sem 3ichy, IP Reguiaton, scheduie 2. table 2. tem 8. IP Regulation. schedule 1 part 3 ‘able + tem 3 Water Aci 2000. secuon 366A (w-id river areal, Wild
Alvers Ac! 2005 section 434. relevant wil aver declaration Wad Arvers Code.
4.7 | Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
fo-Gotoaas [Yes
{f yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 CINo OO Yes
(ii) A regulation under the IPA or the Water Act 2000 LINo LJ Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part K:) This application requires assessmem by the Department of Natural
Resources and Water (NRW). If NRW is nol the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
‘PA, schedule 8, part 1. fable 4 Wem 3échia) IP Regulaton sonedule 2. taole 2. 4em 8, IP Regulation scheaule 1 oart 3 tabie J, fem3 Vater Act 2000, section 966A \\v'd aver aroaltNote, 10 current wiki
ver declaration identifies taking or nterfenng wath subartesim water as essessabre), Wid River cove (Nole. the code does not currently woman appicaoe provisons fpr subartesan water}
4.8 | Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for interfering
ith overland flow water (other than using a water truck to pump water)?
io - Go to 04.9 (71 Yes - Answer bath (a) and (b) below
(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river a,
Wild Rivers Act 2005?
0 Yes
If yes, indicate what the proposed operational! work relates to
() Specified works for the area LI No C1 Yes/ —7
{ii) Work state in the relevant wild river declaration to be CNo O Ye
assessable development for which an application may
be lodged a
If yes to either or both of (i} or {ii) above - (Complete Form 1, Part Kio Subject to the declaration for tke relevant i ivecarga, assessment Z
ONo
If no, are the operations mentioned as assessable development in the following?
(iii) A water resource plan under the Water Act 2000 CINo (1 Yes
{iv) A regulation under the IPA or the Water Act 2000 LI No C1 Yes
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(b) Is the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and
embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?
oO No O Yes - (Complete Form 1, Part Kio) This application requires assessment by the Department of Natural Resources and Water
(NRW). If NAW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
26 pant cab'ed dems 32ine and you IP Bey “ater ~neduke 2 ok 2 f2r9 IP Reguurtion oimdce S part d age dar JA Water Act 2000 sactan 966B id wer in ar
fiver Jeciaraton. Wid Revers Code.
22
Page 32
Page 19
(NTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.3, 9 May 2008
TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)
4.9 |Is the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Act 2000 No LJ Yes
(i) Toincrease the storage capacity of a referable dam by more than 10% lio =] Yes
If yes to either or both of (i) or {ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW). if NRW is nol the Assessment Manager for tha application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part |, taole + stem 4, 1P Regulation, scheduie 2. table 2, ren 10
TIDAL WORK; WILD RIVER AREA
4.10 |\s any-6f the proposed operational work tidal work, other than excluded work defined under the IPA?
‘No -Gotoa4.1t ([] Yes - Answer (a) and (b) below
(a)__ls any of the proposed tidal work prescribed tidal work?
Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
(No a Ce
If no, is the work proposed in a canal?
CINo
!
| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
o No - (Complete Form 1, Part P). If the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qld) as Concurrence Agency.
oO Yes - (Complete Form 1, Part P}. If the Environmental Protaction Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
! Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
1
Ityes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qfd) as
Concurrence Agency.
Oo Yes - (Complete Form 1, Part P), This application must be referred to Queensland Transport (Maritime Safety Qld) as
| - Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
C1 Yes |
[ eyes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
' (J No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
‘ refuse to receive it,
1
|
|
L__.
| Ifyes, is the work proposed in a canal? i
| LI No
| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
| | No - Uniess the application is consistent with any property davelopment plan applying to the land, the Assessment
| Manager must refuse (o receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The |
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005. |
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment |
Manager must retuse (0 receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is |
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The i
application also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency —;
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the i
application also requires assessment for the purposes of the Wild Rivers Act 2005. :
' OC Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must retuse lo receiva it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qld) as Concurrence Agency. Subject to the declaration for the rele) A TVET
area, the application also requires assessment for the purposes of the Wild Rivers Act 2
4
oO Yes -— Unless the application is consistent with any property development plan applying to ‘anche issessment
Manager must ratuse to receive it. (Complete Form 1, Part P) This application mugt be folred to Queensland
Transport (Maritime Safely Qld) as Concurrence Agency and Qid Fire and Rescu Beige as Avice Agency.
The application also requires assessment for the purposes of the Wild Rivers At 2005; Peep Sb ees
I No - Goto the first question on the next page of this Checklist 15
MAN
bE
Page 33
Page 20
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
TIDAL WORK; WILD RIVER AREA {continved)
Ino, is any of the proposed tidal work to be carried out in a wild river area declared under the Wild Rivers Act 2005?
Yes
Ityes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
LI No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.
Yes
It yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse to receive it, (Complete Form 1, Part M) This application requires assessment by the Environmental Protection
Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency. The application also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency
and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wid Rivers Act 2005.
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager
must refuse fo receive it (Complete Form 1, Part M) This application requires assessment by the Environmental
Protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency. The application also requires assessment by Queensland Transport (Mantime Safety Qld) as
Concurrence Agency and Old Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild
fiver area, the application also requires assessment for the purposes of the Wild Rivers Act 2005,
CINo
Itno, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Past M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency.
oO Yes - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA
is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The application
: also requires assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency) and Qid Fire and
_ Rescue Service as Advice Agency. _ |
{b) fs any of the proposed tidal work to be carried out in one or more of the following tidal areas?
(ii) Starting i in one local government tidal area and e extending into another local government tidal iC] No | Ove Yes.
i) In two or more local government tidal areas but nol s starting in either local government tidal area LINo oO Yes . :
: area {but in no strategic port tidal area)
le
v) A tidal area that is not a strategic port tidal area ora local goverment tidal area Oo No | Oo Yes"
la One only local government tidal area 8 Cy. Yes |
(w) One only strategic port tidal area CJNo {Oo Yes |
Note: The answers you provide in (i) - (v} above may affect who the Assessment Manager is for the application.
IPA, scneduia 8 part 1. table +, dem 5, IP Regulabon, schedule 2, ‘able 2 tems 12. 1-4 and 17: iP Regulation. schedule | part 3. ‘abe 4, cems 4A and 5. Coastal Protection and
Management Act 1995, secuon 104A jwid zver area)
RECEIVED
— y
[_
\, SERC - tewaniil
Page 34 Froat Counter
Page 21
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 21.3, 9 May 2008 COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA 4.11. | Is anyof the operational work proposed to be carried out within a coastal management district? jo -Gotoasi2 (C1 Yes Ifyes, is the proposed operational work for the following? i) Interfering with quarry material on State coastal land above high-water | mark _. ; ‘Or No ! ‘O Yes | + (ii) Disposing of dredge s; spoil oro other solid waste material in tidal waters. ‘Or No oO Yes . \ (iii) Draining or allowing drainage or or flow water or other matter across State costal land above high- water mark oo bo -- : (iv) Constructing or installing | works in a watercourse where the works are nol assessable under IPA, schedule 8, part 1, table 4, items 3 or 4 0) Reclaiming fand under tidal watera (vi)_ Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot | (vii) Constructing an 2 artificial waterway that is a canal, ciated with reconfiguring a lov (vii) Constructing an artificial waterway not associated with reconfiguring alot on land, other than State (No !() Yes © coastal land, above high-water if the maximum surface area of water on the waterway is at least 5,000m? | : (ix) Constructing a bank or bund wall to establish a ponded pasture on land, other than State coastal land, Oo No | i OYes : ‘ above high-watermark 1) Removing or interfering with coastal dunes on land, other than State coastal land, that is in an erosion ion Dt No oO Ye |___ Prone area and above high-water mark — ae ce ee eee meee eee teen ee eee ee ele ee If yes to one or more of (i) - (x) above, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005? Oo No - (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agancy has jurisdiction as Concurrence Agency. If yes, above, to any shown bold and marked with the symbol a, the application also requires assessment by Queensland Transport (Marine Safety Qld) as Concurrence Agency. (Yes Ifyes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005? QO Yes - Unless the application is consistent with any property development plan applying to the land. the Assessment Manager must refuse to receive it (Complete Form 1, Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not the Assessment Manager for the application, the agency has jurisdiction as concurrence Agency. ff yes, above, fo any shown bold and marked with the symbol #, the application also requires assessment by Queensiand Transport (Marine Safety Qid) as Concurrence Agency. Subject to the declaration for the relevant wild river area, the application also requires assessment for the purposes of the Wild Rivers Act 2005. O No - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it, IPA, schadule 8, part 1, table 4, tem 5, 1P Regulation, schedule 2. table 2, tems 12 and 14, IP Regulation schedute 1. oar 3, iable 4, tems 4A and 5; Coastal Protection and Management Act 1995 Act 1995 section 104A (wild nver area), Wild Rivers Act 2003 section 434. WATERWAY BARRIER WORKS; WILD RIVER AREA 4.12 One the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994? No-Gotoa413 (_] Yes It yes, is any of the proposed operational work to be carried out in a wild river area declared under the Wild Rivers Act 2005? LINo If no, is all of the operational work for constructing or raising waterway barrier works - tick applicable box/es and answer (a) and/or (b) below aU) temporary __EINo__| [7] Yes *(i)_ minor CINo (Yes (ii) rebuilt o on a regular b basis [No | O Yes - | (a) If yes to one or more of ( — (iii) above, does all the proposed operational work comply with any applicable Department of Primary Industries and Fisheries (DPI&F) self-assessable code? oO Yes - A permit for that aspect of the operational work is not required. Go to Q4.13 oO No - Go to (b) (b) Ifo to all of (i) - (iii) or no to (a) above - (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industries and Fisherles (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. (Yes tyes, is any of the proposed operational work to be carried out in a wild river high preservation area? | No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it (Complete Form 1, Part Os) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and, ‘Subject to the deciaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If mee Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. “ev oO Yes - An application for the operational work will be laken to be not properly made and the Assessment Manager it ref seto scoot L 28 pati tabi d, tem 6:JPA schedule 8 part 2. tablet tem 2: F.zrerss Reg.‘aben 1985 s113A sed-assessae codes! iP bash 6 sefedu a 2 swede dan Pe . Reguizion scneduie 1 part 3, table 4, tem 6. Fishanes Act 1994. secuon 78D jwua river area, Wid Rivers Act 2005 secon AIA f i fA mI way vag hj 4 MAY 2008 gene - Tewantin Frent Counter
Page 22
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkdist, Version 21.3, 9 May 2008
DECLARED FISH HABITAT AREA; WILD RIVER AREA
4.13 |4s any of the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries
Act 994.
No-Gotoa4i¢ [J Yes
ifyes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) below)
{) The maintenance of existing structures, including for example the following structures, if the structures [_} No} | }No [1] Yes Yes |
were constructed in compliance with all the requirements, under any Act, relating to a structure of that
type -
« Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs;
. Existing powerlines or. associated powerline infrastructure
(i) Educational or research purposes relating to the fish habitat area : — A No|(] Yes
> ae
| (iii) Monitoring the impact o of development on the dectared fish habitat area (1 No|(] Yes °
v) The construction or placement of structures, including for example, safety signs, swimming enclosures (1No} (1) Yes
and aids to navigation, if ~ i
e The impact on the area is minor; and |
« The structures are constructed in compliance with all the requirements, under any Act, relating to a
structure of that type |
“Ww "Public benefit works, including, for example, the construction of runnels for mosquito control, tk the Ono Yes *
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor is
(a) If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(1 Yes - A pennit for that aspect of the operational work is not required. Go 10.04.14 (] No - Goto (b)
{b) If no to all of {i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
Oo No - (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not
Oo the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.
Yes
It yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz} This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F} and assessment for the purposes of the Wild Rivers Act 2006. it DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.
(No
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the appiication is consistent with any property development plan applying to the land, the Assessment Manager must refuse
to receive it. (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2008. If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
Oo Yes - An application for the operational work will be taken to be not properly made and the assessment manager must refuse to
receive it.
IPA, schedule 8 part |, table 4, tein 7: IPA scheduie 8, part 2, table 4, lem 3 Fishenes Regulation 1995 51134 (seil-assessable codes! IP Reguiabon, schedule 2. taole 2, tem 25, IP
Regulation, schedule 1. part 3, tata 4, tem 7, Witd Rivers Act 2005, sections 43A; Fishenes Act secon 760C (wild nver areay
Page 36
Page 23
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
REMOVAL, DESTRUCTION OR DAMAGE OF A MARINE PLANT; WILD RIVER AREA
4.14 | 1s anf of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
No-Gowoa4ts (] Yes
If yes, is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or (b) bel
! () “The removal, destruction or damage of dead marine wood on unallocated State land, other thanina [7] No Yes !
wild river area, for trade or commerce |
(ii) The maintenance of existing structures, including, for example, the following structures, if the CINo () Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a
structure of that type —
* — boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and :
, weirs;
« — existing drainage structures;
: « — existing powerlines or associated powerline infrastructure
(ii) For educational or research purposes or for the monitoring the impact of development on marine ‘Oo No oO Yes |
plants _ . _ _ .
(iv) For the construction or placement of structures, including, for example, swimming enclosures, safety [_]No (] Yes
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if -
« The extent of the removal, destruction or damage is minor; and
« The structures were constructed in compliance with all the requirements, under any Act, relating
to a structure of that type ee og \
i (v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site ‘(No ‘(1 Yes
____ rehabilitation or the collection of marine plants for fishing bait, or handicraft i
(a) If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
O Yes - A permit for that aspect of the operational work is not required. Go to Q4.15 oO No ~ Go to (b)
(b) If no to alll of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
i] No - (Complete Form 1, Part Oz) This application requires assessment by the Department of Primary industries and Fisheries (OPI&F). if DPI&F is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
OYes
If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must reuse to
receive it, (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(No
If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development penmit is not required or, if a
development permit is required, the permit is held or has been applied for?
oO Y@s - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Oz} This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO No - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it.
IPA schedule 8. part t table 4, tam 8, IPA, schedule 8. part 2 tabie 4. tem 4. Fishenes Requiaton 1999 51 13A \sell-sssessable codes): IP Segulaiion, schedule 2, lane 2 ter 23, IP.
Reguiaton schedule 1, part 3, table 4, item 8, Fishenes Act 1994, secion /608 {wid river area), Wid Ravers Act 2005, section t3A, ‘eevant wid river declaration, iMng Auris Cour
Page 37
Page 24
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.3, 9 May 2008
WILD RIVER AREA
4.15 Is anyof the operational work proposed to be carried out in a wild river area declared under the Wild Aiver Act 2005?
lo -Gotoa4.t6 (_] Yes
It yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable?
(i) Agricultural activities as defined under the Wild Rivers Act 2005 (No CO Yes
(ii), Animal husbandry activities as defined under the Wild Rivers Act 2005 LINo 0 Yes
If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area?
Oo Y@S - An application for the operational work will be taken to be not propery made and the Assessment Manager must refuse to receive it.
{_] No
If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
O Yes - An application for the operational work will be taken to be no! properly made and the Assessment Manager must refuse to receive it.
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q it agriculture. Complete Form 1, Part R it animal husbandry} Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8. part 1, table -f, item 10, JP Regulauon, schedule 2, table 2, tem 37, Wild Rivers Act 2005, sections 42, 434
STATE-CONTROLLED ROAD
4.16
Is apy part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No -Endofsectin4 [_] Yes
If yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
(i) Amaterial change of use that is assessable under the planning scheme
CINo [L1Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of ots (]No (_] Yes
abutting the State-controlled road
If no to either or both (i} or (ii} above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule 8 - Answer (a) - (c) below.
{a) Is any of the proposed operational work associated with access to a State-contralled road?
oO No Yes - This application must be referred to the Department of Main Roads (OMA) as Concurrence Agency.
(b) 1s any of the proposed operational work for filling or excavation?
LINo UL Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
Ol No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
LI No
OU Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
oO No - This application must be referred to the Department of Main Roads (OMA) as Concurrence Agency.
oO Yes - This application must be referred to the DMR as Advice Agency.
IP Reguiaton. schedu'e 2. tacie 2. tem 3
Page 38
Page 25
THIS DOCUMENT IS TO LARGE TO SCAN. PLEASE REFER TO HARD DOCUMENT.
Page 26
Sunshine Coast ‘ano use section FEES Regional Council RECEIPT TYPE SALE OF DOCUMENTS Superseded Planning Scheme Documentation 520 Copy of Permit/Approval Letter 110 The Noosa Plan Documentation 111 APPLICATION FEES Material Change of Use - Code/Impact Consistent 521 Inconsistent : 521 Assessment under Superseded Planning Scheme 521 Modification to a Development Permit 521 Extension of a Currency Period. 521 Operational Works - Landscaping / L zZ < 521 @ Bldg Work assessable against the Planning Scheme. 521 PRE LODGEMENT REVIEW : Half Hour . §22 One Hour §22 ADVERTISING . Purchase Advertised Applications 523 JETTIES . Jetty Application Fee - 524 Jetty Bond « . . 51 : (Category 4) BONDS ’ Performance Bond 51 (Category 9) SIGNS , Registration Fee : . 222 stu ree Search of Land Use Section file / 112 Liquor Licensing Request mo, 113 ToTraL ¢ (2S NAME: CBO Setters Cape ADDRESS: Po Pe 1922 rosa Heaniy FILENO: 7#@eee 23/652 pate: /G/s7oe RECEIPTNO: — %oyoQ7 Signature of TP Officer: f Drea - AUTHORITY NO: , ‘cS ‘4 200 F [ss /
Page 27
CALCULATION OF FEES APPLICATION FEE TOTAL FEES MCU - CODE ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION MCU - IMPACT ASSESSMENT Details of Development Consistent 1.0 Inconsistent 3.0 FEE CALCULATION JOPERATIONAL WORKS Details of Development FEE CALCULATION TOTAL FEES
Used in these records
08/0853 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.