Council archive · source document
08/0853 - Operational Works - Landscaping [As Published] · 142008.853
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checkfist, Version 21.3, 9 May 2008
SECTI 0 N 1 Section 1 must be completed for all applications that require completion of the IDAS Assessment Checklist.
HERITAGE
1.1A | ls any-part of the proposal intended to be carried out on a Queensland Heritage place under the Queensiand Heritage Act 1992?
lo- Gooar.t8 ((] Yes
{f yes, has an exemption certificate for the proposal'-' been issued under the Queensland Heritage Act 1992?
Cl Yes CINo
If no, is the proposed work emergency work for the Queensland Heritage Act 1992?
(0 Yes CINo
If1no, is the work being carried out by the State?
OC Yes No - (Complete Form 1, Part C:} This application requires assessment by the Environmental Protection Agency (EPA).
If EPA is not the Assessment Manager for the application, the EPA has jurisdiction as Concurrence Agency.
JPA, schedule 3, part 1, table 5. tem 2, IP Reguiabon, scheduie 2, table 1. em 11, table 2. tem 18, IPA, section 1.3.5 (Definitions for terms used in development,
1.1B | Does the proposal involve development, other than development mentioned in the Integrated Planning Act 1997 Schedule 9
(development that is exempt from assessment against a planning scheme), that is intended to be carried out on a place entered ina
Locat Heritage Register under Part 11 of the Queensland Heritage Act 1992?
No - Gotoat.2 (1 Yes - (Complete Form 1, Part C2) This application requires assessment by the relevant local government against the IDAS Code in
the Queensland Heritage Regulation 2003. If the development involves building work and the focal goverment is not the
Assessment Manager for the application, the local government has jurisdiction as Concurrence Agency.
IPA, scnedule 8, purt |, table 5, tem 2A, schedule 9, tables 1.2.3 44 5 IP Raguiaton, scnedule 2. table 1, dem 1 1A, IPA, section 1.3 5 (Defmbons for terms used wn developmert),
Queensland Hentage Regulation 2003, scredule 2 (IDAS Coda)
REMOVING QUARRY MATERIAL; WILD RIVER AREA
1.2
Doeg’the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
No-Gotoa13 (] Yes
If yes, is an allocation notice required under the Water Act 2000?
CINo O01 Yes
If yes, is any part of the removal of quarry material intended to be located in a declared wild river area under the Wild
Rivers Act 2005?
oO No — (Complete Form 1, Part Kr) This application requires assessment by the Department of Natural Resources and Water (NRW). if NRWis not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive it
(Complete Form 1, Part Kz). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Cancurrance Agency.
Subject to the declaration for the relevant wild river area, assessment is also required for the purposes of the Wild Rivers Act 2005.
IPA, schedule 8. part 1 table 5, tem 1, IP Regulation scheaule 2 table 2, tem 11; iP Reguiaton, scheaule I, table 5, item 2 twikd mer area) Water Act 2000 secion 966C. Wid Aivers Act
2005, section 33A.
ENVIRONMENTALLY RELEVANT ACTIVITY; WILD RIVER AREA
13
rte. proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
lo-Gotoard (J Yes
It yes, is any part of any ERA intended to be located in a wild river area declared under the Wild Rivers Act 2005?
(J No
{f no, is there a code of environmental compliance under the Environmental Protection Regulation 1998 for every aspect of each
proposed ERA?
oO No - (Complete Form 1, Part G) This application requires assessment by the Administering Authority. if the Administering Authority is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. Go to Q1.4
(1 Yes - Gotoat.4
Yes
If yes, is any ERA an item 20 ERA (extracting rock or other material) intended to be located in waters?
(Yes
If yes, will the application be accompanied by an allocation notice for that ERA, as defined under the Environmental
Protection Act 1994, section 73AA(9)?
oO Yes - Unless the application is consistent with any property development plan applying to the land, and the application is accompanied by an
allocation notice, the Assessment Manager must refuse to receive it. (Complete Form 1, Part G). This application requires assessment by the
Administering Authority for the pusposes of both the Environmenial Protection Act 1994 and, subject to the declaration for the relevant wild river area,
the Wild Rivers Act 2005. If the Administering Authority is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.
No - An application for the ERA will be taken to be not properly made and the Assessment Manager must refuse to receive it.
(J No - Answer the following question/s on the next page
‘1 In this IDAS Assessment Checklist, the term proposal refers to the proposed use, work or lot reconfiguration the subject of the application.
Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0853 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.