(NTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 21.3, 9 May 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

 

 

 

 

4.9  |Is the proposed operational work for the following?

(i) For the construction of a referable dam as defined under the Water Act 2000 No LJ Yes

(i) Toincrease the storage capacity of a referable dam by more than 10% lio =] Yes

If yes to either or both of (i) or {ii) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and

Water (NRW). if NRW is nol the Assessment Manager for tha application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part |, taole + stem 4, 1P Regulation, scheduie 2. table 2, ren 10

TIDAL WORK; WILD RIVER AREA
4.10 |\s any-6f the proposed operational work tidal work, other than excluded work defined under the IPA?

‘No -Gotoa4.1t  ([] Yes - Answer (a) and (b) below
(a)__ls any of the proposed tidal work prescribed tidal work?

Yes
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
(No a Ce
If no, is the work proposed in a canal?

CINo

!

| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

o No - (Complete Form 1, Part P). If the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qld) as Concurrence Agency.

oO Yes - (Complete Form 1, Part P}. If the Environmental Protaction Agency (EPA) is not the Assessment Manager for the

application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
! Transport (Maritime Safety Qid) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency.
1

Ityes, is any of the proposed tidal work for a marina with more than 6 vessel berths?
oO No - (Complete Form 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qfd) as
Concurrence Agency.
Oo Yes - (Complete Form 1, Part P), This application must be referred to Queensland Transport (Maritime Safety Qld) as
| - Concurrence Agency and Qid Fire and Rescue Service as Advice Agency.
C1 Yes |

[ eyes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
' (J No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
‘ refuse to receive it,

1
|
|
L__.

   

| Ifyes, is the work proposed in a canal? i

| LI No

| If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

| | No - Uniess the application is consistent with any property davelopment plan applying to the land, the Assessment

| Manager must refuse (o receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The |
application also requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005. |

oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment |

Manager must retuse (0 receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is |
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The i
application also requires assessment by Queensiand Transport (Maritime Safety Qld) as Concurrence Agency —;
and Qid Fire and Rescue Service as Advice Agency. Subject to the declaration for the relevant wild river area, the i
application also requires assessment for the purposes of the Wild Rivers Act 2005. :

' OC Yes
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must retuse lo receiva it. (Complete Form 1, Part P) This application must be referred to Queensland
Transport (Maritime Safety Qld) as Concurrence Agency. Subject to the declaration for the rele) A TVET
area, the application also requires assessment for the purposes of the Wild Rivers Act 2

4
oO Yes -— Unless the application is consistent with any property development plan applying to ‘anche issessment
Manager must ratuse to receive it. (Complete Form 1, Part P) This application mugt be folred to Queensland
Transport (Maritime Safely Qld) as Concurrence Agency and Qid Fire and Rescu Beige as Avice Agency.
The application also requires assessment for the purposes of the Wild Rivers At 2005; Peep Sb ees

  
  
  
  
  
 

  

 

I No - Goto the first question on the next page of this Checklist 15

  

MAN

    
 
  

 

 

bE
Page 33

   

Used in these records

About this file

File size
1.6 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0853 - Operational Works - Landscaping [As Published].pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.