08/0853 - Operational Works - Landscaping [As Published] · 142008.853
INTEGRATED PLANNING ACT 1997 Part E, Version 3.1, 3 March 2008
Form 1 Development Application
P art E b- 5 MAY 7008
Building &/or operational work assessable against a planning
cvcatin
From Counter
Nature of the works ony
1. Nature of work that requires assessment avast planning scheme:
(C1 Building work - Complete Table A Operational work - Complete Table B
Table A
(i) What is the nature of the building work made assessable in the planning scheme?
L |
(ii) Are there any current approvals associated with this application? (e.g. material change of use}
ONo (Yes - Provide details below
List of approval reference/s Date approved Date approval lapses (if known)
{4.
Table B
(i) What is the nature of the operational work made assessable in the planning scheme?
CD Roadworks C1 Stormwater C1 Water infrastructure C1 Clearing vegetation under the planning scheme
(1 Drainage works = [1] Earthworks 1 Sewerage infrastructure
Landscaping OC Signage (1 Other - specify
(iii) What type of approval is being sought? (NOTE: If you have indicated multiple operational works in question (i) above and your answers to this question
would be different for different operational work, it may be more appropriate to provide these details in an attachment to this form)
[A bevelopment Permit C1 Preliminary Approval 21 Both (specity below)
(iv) Is the operational we necessary to facilitate the creation of new lots (ie. subdivision)?
(No Yes - Specify the number of lots being created 4
(v) Are there any current approvals associated with this application? (e.9. Development Permit or Preliminary Approval for MCU or reconfiguring a fot)
C1No C1 Yes - Complete Table (a)
Table Bia) List of approval references Date approved Date approval lapses (if known)
1.
2. What is the dollar value of this operational work? (ie. the totat vaive including GST, materials and labour) $ 20,000 , 00°
t
Mandatory information
3. Confirm the following mandatory information accompanies this application
Confirmation of lodgement} Method of lodgement
Plans, and specifications if applicable, showing the nature and location of the proposed works (including the ovel THe
extent of any cut and ff) C) Confirmed cou Tek
OFFICE USE ONLY
Date received Reference numbers
Advice for completing Part E
General advice
. Part A must also ba completed for alt {DAS development applications.
. The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly to another question.
Qi [A development permit authorises development to occur, while a preliminary approval is a step in the approval process and does not authorise development to occur.
Page 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0853 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.