Skip to the record
Search everything, all in one place.

Council archive · source document

00154413.001

of 66

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                          IDAS Assessment Checklist, Version 20, 2 April 2007
               State-controlled road matters           2.   The application involves: (tick applicable box/es)
               For more Information refer to Guide 3.       (1 (i)   development on land contiguous’ to a State controlled road and for -
               Unless you answered “none of the above” to Q2, :                                                       .             .
               the application triggers referral to the Department  ([] (a) material change of use assessable against the planning scheme;
              of Main Roads (DMR) as a referral agency.                  b) reconfiguri             less  -
               In certain circumstances DMR will be an advice       O (0)    thet guring alot un      8s     .         .
               agency, while in other circumstances DMR will                « the total number of lots is not increased; and
               be @ concurrence agency.                                     e the total number of lots abutting the State-controlled road is not increased;
              Schediie 2 ofthe IF Regulation wil assist you to       Fi () operational work (not associated with @ material change of use assessable against the
               concurrence agency for the application.                      planning scheme or reconfiguring @ lot mentioned in (b) above}-
                                                                            ¢ associated with access to a State-controlled road; or
                                                                            © for filling or excavation; or
                                                                            « involving the redirection or intensification of site stormwater from the land, through a
                                                                              pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                              State-controlled road.
                                                            (J (ii) development on land not contiguous to a State-controlled road and -
                                                                     (J (a) material change of use -
                                                                           * assessable against the local government's planning scheme; and
                                                                           ¢ mentioned in schedule 5 of the !P Regulation and exceeding the thresholds set by
                                                                              that schedule;
                                                                      ] (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
                                                                             and exceeding the thresholds set by that schedule;
                                                                     (J (c) operational work (not associated with a material change of use assessable against he
                                                                             planning scheme or reconfiguring a lot mentioned in (b) above}-
                                                                           e assessable against the local government's planning scheme; and
                                                                           ¢ mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
                                                                              that schedule.
                                                            &X] (iii), none of the above
               Clearing vegetation                     3.   The application involves: (tick applicable box/es)
                                                                  PP
               For more information refer to Guide 12.      Cc  (i)  material change of use -
              the appveaton equ  essessmentby He, %                   (a) assessable against the planning scheme;
               Re Metaa Resources and Wate nt of Natural Resources and Water (b) on a lot containing -
               if an agency other than NRW is the assessment               * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
               manager for the application, NRW is a                       « if there is no property map of assessable vegetation for the lot - remnant vegetation;
               oncurTance agency forthe application in relation       (c)  where the existing use of the land is a rural or environmental use; and
               Hf you ticked 03()) or (i), your application requires  (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
               feferral to NRW for assessment regardless of a (ii)    reconfiguring a fot -
               whether vegetation clearing is proposed or not.                             4
                                                                     (a)   on alot containing a category 1, 2 or 3 area shown on a property map of
                                                                           assessable vegetation or, if there is no property map of assessable vegetation fo
                                                                           the lot, remnant vegetation;                                                      @
                                                                      (b)  where the size of the lot before the reconfiguration is 2 hectares or larger;
                                                                      (c)  where 2 or more lots are created; and
                                                                      (d)  where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
                                                            C1] (iii) operational work -
                                                                      (a)  for the clearing of native vegetation where the vegetation clearing is made
                                                                           assessable under Schedule 8 of the IPA; and
                                                                      (b)  not associated with a material change of use assessable against the planning
                                                                           scheme mentioned in (i) or reconfiguring a lot mentioned in (ii) - complete Part J of
                                                                           Form 7
                                                            [XI (iv)  none of the above.
               Strategic port land                     4.   The application involves:
               ne rated he _ oe                fyist        [J (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
                 you UcKed {I} - ie relevan   onty tS he
                      ent manager for the application               Act) - complete Part ! of Form 1
               tf you ticked (i) Queensland Transport Is 2  (J (ii) a material change of use that is inconsistent with the land use plan approved under the
               concurrence agency for the application.              TI Act for the strategic port land - complete Part | of Fonn 1
                                                                (iii) none of the above

               4  Land contiguous to a State-controlled road is defined in schedule 14 of the IP Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a future State-
                  controlled road,
                                                                                           Page 2
|

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00154413.001.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.