INTEGRATED PLANNING ACT 1997                                                                             IDAS Assessment Checklist, Version 20, 2 Aprit2007,*
                Operational work that is tidal work or   |9.   The application involves operational work that is: ( tick the applicable box/es)
               work in Coastal management “istrict            C1 (i)   tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
                more information about reseed ida fidal workin         Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
                local goverment dal areas refer to Guide 24,  C1 (ii)  tidal work that is prescribed tidal work" other than in a canal'2 -compiete Part P of Form 1; oF
                Unless you answered “none of the above” to Q9,     ws      :         aps                                   .
               the application requires assessment by the     (1 (iii) carried out within a coastal management district under the Coastal Act and for - complete
               Environmental Protection Agency (EPA).                  Part M of Form 1 if any boxes (a) to (i) below are ticked,
                an agency other than EPA is the assessment             (_] {a)   constructing or installing works in a watercourse between MHWS and HAT (ie.
                arnee on         ete snplicaton hn                               other than those works in tidal water) where the development has been determined not
                relation to this matter.                                         to be assessable against the Water Act 2000 ;
               Local government i the assessment manager               (-] {b)   constructing a canal'2 intended to be connected to tidal waters;
                or all prescribed tidal work.                                              :         tas
                     ,                                                 (J (c)    constructing an artificial waterway;
                                                                       (J (d)    reclaiming land under tidal water;
                                                                       (1 {e)    disposing of dredge spoil or other solid waste material in tidal water;
                                                                       (1 (f)    interfering with quarry material on State coastal land above high-water mark;
                                                                       (J (g)    draining or allowing drainage or flow of water or other matter across State
                                                                                 coastal land above high-water mark;
                                                                       (1 {h)    removing or interfering with coastal dunes on land, other than State coastal land,
                                                                                 that is in an erosion prone area and above high-water mark;
                                                                       CJ (i)    constructing a bank or bund wall to establish a ponded pasture on land, other
                                                                                 than State coastal land, above high-water mark; or                                    @
                                                              EX (iv)  none of the above.
                Operational work below high water      | 10.   The application involves operational work that is: (tick the applicable box/es)
                mark re information refer to Guide 18. For     [_] (i) tidal work’? as defined under the Coastal Protection and Management Act 1995 (the
                more Information about prescribed ta tidal work in     Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; OF
                local government tidal areas refer to Guide 24. (1 (ii) tidal work that is prescribed tidal work" - complete Part P of Form 1; Of
               Uni             red “none of the above’ to           siny             vag:                            ae
                 10, the application triggers referral to       J (iii) carried out within a coastal management district'S under the Coastal Act and for -
             CE EE              ee      vette Safely                   [J (a)    disposing of dredge spoil or other solid waste material in tidal water - complete Part
                                         "                                       M of Form 1;
                Local govemment is the assessment manager                             a    '             .
                for all prescribed tidal work.                         [.) (b)   reclaiming land under tidal water - complete Part M of Form 1; or
                                                                       [J (c)    constructing a canal’, if the canal is associated with reconfiguring a lot - compete
                                                                                 Part M of Form 1;
                                                                   (iv)  none of the above.
                Coastal management                        11.  The application involves: (tick the applicable box/es)
                For more Information refer to Guide 18.        (J (i)    a material change of use assessable under a planning scheme involving operational
                att “Pe apploationrequres assessment by the              work carried out completely or partly in a coastal management district's
                Environmental Protection Agency (EPA).         (1 (ii)   a material change of use assessable under a planning scheme involving building
                if an agency other than EPA ls the assessment            work, carried out completely or partly in a coastal management district that is -
                rae    ace aneney fate application in                    « the construction of a new premises with a GFA" of at least 1000m?
                                 lication, EPA i                                        .                  :     .
                relation to this matter.                                 e the enlargement of the GFA of existing premises by more than 1000m?
                                                               (J (iii)  reconfiguring a lot assessable under schedule 8 of thé IPA where the land is situated
                                                                         completely or partly in a coastal management district
                                                               LJ (iv)   reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
                                                                         the construction of a canal'2 - complete Part M of Form 1
                                                                   (v)   none of the above

                10 Tidal work is defined in sch 10 of the IPA.
                11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
                12 Canal means canal as defined under the Coastal Protection and Management Act 1995
                13 Tidal work is defined In sch 10 of the IPA.
                14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
                15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
                  coastal management district under section 47(2} of that Act.
                16 GFA is defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculatad GFA, go to the planning scheme against which the application is being assessed.
                17 Under $117 of the Coastal Protection end Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
                  accompanied by the application for the operational works to construct the artificial waterway.
                                                                                               Page 4
|

Used in these records

About this file

File size
3.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

00154413.001.pdf · 3.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.