Council archive · source document
Minor Change Report OPW17 0225.02 · OPW17/0225.02
APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL Author Coordinator Engineering, Mark Lewis Development Assessment APPLICATION DETAILS Application No. OPW17/0225.02 Development Approval Development Permit for Operational Works – Roadworks, Stormwater Drainage, Earthworks and Landscaping Applicant Wade Jenner c/ Martoo Consulting Request Received On 14 June 2018 PROPERTY DETAILS Property Address 61 Elanda St Sunshine Beach Qld 4567 RP Description Lot 408 RP 48112 Land Area 505.35m² Existing Use of Land Residential (Single Dwellling) STATUTORY DETAILS SEQRP Designation Urban Footprint Locality Eastern Beaches Zone Attached Housing Overlays Nil Assessment Type Minor Change to Development Approval PROPOSAL The applicant seeks approval to change to an existing development approval to reflect changes to the associated higher order approval and to seek an extension to the relevant period. background A development approval for Operational Works – Roadworks, Stormwater Drainage, Earthworks and Landscaping was issued on 31 August 2017. The works are required to address a number of conditions of the associated higher order approval 132003.221172. The higher order approval has been the subject of change applications with the current version being 132003.221172.A. assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; The Noosa Plan. The following codes from the Noosa Plan are applicable to this development: Engineering Works Codes Landscaping Code Statutory Process The applicant has requested to make a minor change to a development approval under s78 of the Planning Act 2016. An application for a minor change to a development approval can only be made in circumstances where a change would constitute a ‘minor change’. The proposed change to the development approval requested by the applicant is determined to constitute a minor change on the grounds that: the development would not result in substantially different development as <; the change does not include prohibited development; the change would not require the application to be referred to an additional referral agency or cause a referral agency to have regard to new mattes prescribed by regulation; where the original application was code assessable, the change would not cause the application to become impact assessable. Section 3 – Relevant Period The relevant period for this development approval is 2 years starting the day that this development approval takes effect. Applicant’s Request The applicant requests that the Relevant period be extended to the same date as the higher order. Assessment of Request The higher order has been extended until 16 December 2020 and it is considered reasonable to extend the operational works to the same date for clarity. It is recommended that Section 3 be reworded to read as follows: The relevant period for this development approval is until 16 December 2020. Condition 1 The stormwater disposal from the site shall be provided in accordance with: Drawings Nos 17044-2(A) and 17044-3(A) by Ian Bradford Plumbing Consultants and must include but not limited to the following: Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant. Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant. Applicant’s Request The applicant requests that the condition be changed to reflect the most recent design and updated plans/reports. Assessment of Request The request is considered acceptable as the updated reports and plans address Council’s concerns. It is recommended that Condition 1 read as follows: The stormwater disposal from the site shall be provided generally in accordance with: Drawing No. 18505-C001 Revision B prepared by TOD Consulting Engineers, The Stormwater Management Report prepared by TOD Consulting Engineers dated 26 February 2018 and The Stormwater Quantity Assessment prepared by Aquaintel dated 3 August 2017 and must include but not limited to the following: Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant. Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant. Condition 6 – Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 14725-C001 C General Arrangement and Details, prepared by TOD Consulting 09/08/2017 - - Landscape Design-Garage Level undated - - Landscape Design-Lobby Level undated - - Plant Schedule, 61 Elanda St undated Applicant’s Request The applicant request that the approved plans table be updated to reflect the design and updated plans. updated proposal. Assessment of Request The request is considered acceptable as the updated reports and plans address Council’s concerns. It is recommended that Condition 6 read as follows: Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 18505-C001 B General Arrangement and Details prepared by TOD Consulting Engineers as annotated by Council 26 February 2018 DA2 C Landscape Plan prepared by Larc Collective as annotated by Council 5 June 2018 DA3 C Landscape Plan prepared by Larc Collective 5 June 2018 DA4 C Mood Board prepared by Larc Collective 5 June 2018 DA5 C Planting Plan prepared by Larc Collective as annotated by Council 5 June 2018 DA6 C Planting Plan prepared by Larc Collective 5 June 2018 DA7 C SPEC Notes prepared by Larc Collective 5 June 2018 DA8 C Details prepared by Larc Collective 5 June 2018 Condition 7 Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart. The contact number to arrange a pre-start meeting is 5329 6291. The prestart meeting must include the parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties. Applicant’s Request The applicant has not specifically requested to change the condition. Assessment of Request It is recommended that the condition be amended to reflect the current Council contact details. It is recommended that Condition 7 read as follows: Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart. The contact number to arrange a pre-start meeting is 5329 6245. The prestart meeting must include the parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties. Condition 15 All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. The relevant conditions of the higher order Material Change of Use approval file 132003.221172.7 (23657 DA) to which this approval relates. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Applicant’s Request The applicant has requested to change the condition to reflect the current higher order approval. Assessment of Request It is noted that since the application to change the subject application that the higher order has been changed a number of times with the most recent approval being file number 132003.221172.A. It is recommended that Condition 15 read as follows: All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. The relevant conditions of the higher order Material Change of Use approval file 132003.221172.A (23657 DA) to which this approval relates. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. cONSULTATION Referral Agencies Not applicable Other Referrals The application was forwarded to the following internal Council specialists: Planning conclusion & reasons for decision The changes requested are needed to reflect the changes to the associated higher order approval or are required to update the conditions to current Council requirements. The changes do not create any concerns and achieve the outcomes of the original approval. RECOMMENDATION With regard to Application No. OPW17/0225.02, to make a minor change to an existing approval for Operational Works (roadworks, Stormwater Drainage, Earthworks and Landscaping situated at 61 Elanda St Sunshine Beach Qld 4567 described as Lot 408 RP 48112, is provided in accordance with Section 63(5) of the Planning Act 2016, Council on decided to: A. Approve the changes. B. Amend Section 3 to read as follows: The relevant period for this development approval is until 16 December 2020. C. Amend conditions 1, 6, 7 and 15 to read as follows: 1. The stormwater disposal from the site shall be provided generally in accordance with: Drawing No. 18505-C001 Revision B prepared by TOD Consulting Engineers, The Stormwater Management Report prepared by TOD Consulting Engineers dated 26 February 2018 and The Stormwater Quantity Assessment prepared by Aquaintel dated 3 August 2017 and must include but not limited to the following: Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant. Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant. 6. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 18505-C001 B General Arrangement and Details prepared by TOD Consulting Engineers as annotated by Council 26 February 2018 DA2 C Landscape Plan prepared by Larc Collective as annotated by Council 5 June 2018 DA3 C Landscape Plan prepared by Larc Collective 5 June 2018 DA4 C Mood Board prepared by Larc Collective 5 June 2018 DA5 C Planting Plan prepared by Larc Collective as annotated by Council 5 June 2018 DA6 C Planting Plan prepared by Larc Collective 5 June 2018 DA7 C SPEC Notes prepared by Larc Collective 5 June 2018 DA8 C Details prepared by Larc Collective 5 June 2018 7. Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart. The contact number to arrange a pre-start meeting is 5329 6245. The prestart meeting must include the parties for the following aspects of the works: Civil engineering works; Landscape works; Erosion and sediment control works; Other relevant parties. 15. All works must be constructed and work procedure undertaken in accordance with: The approved plans and conditions detailed in this Decision Notice. The relevant conditions of the higher order Material Change of Use approval file 132003.221172.A (23657 DA) to which this approval relates. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines. The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. [word/footer1.xml] Page 5 of 7 [word/header1.xml] 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Report OPW17 0225.02Related documentApplication case desk ↗
About this file
- File size
- 33 KB (small file)
- File type
- DOCX
No other editions are linked here.