APPLICATION FOR A MINOR CHANGE TO A DEVELOPMENT APPROVAL
Author	Coordinator Engineering, Mark Lewis
Development Assessment

APPLICATION DETAILS
Application No.	OPW17/0225.02
Development Approval	Development Permit for Operational Works – Roadworks, Stormwater Drainage, Earthworks and Landscaping
Applicant	Wade Jenner c/ Martoo Consulting
Request Received On	14 June 2018

PROPERTY DETAILS
Property Address	61 Elanda St Sunshine Beach Qld 4567
RP Description	Lot 408 RP 48112
Land Area	505.35m²
Existing Use of Land	Residential (Single Dwellling)

STATUTORY DETAILS
SEQRP Designation	Urban Footprint
Locality	Eastern Beaches
Zone	Attached Housing
Overlays	Nil
Assessment Type	Minor Change to Development Approval

PROPOSAL
The applicant seeks approval to change to an existing development approval to reflect changes to the associated higher order approval and to seek an extension to the relevant period.
background
A development approval for Operational Works – Roadworks, Stormwater Drainage, Earthworks and Landscaping was issued on 31 August 2017. The works are required to address a number of conditions of the associated higher order approval 132003.221172. The higher order approval has been the subject of change applications with the current version being 132003.221172.A.
assessment
Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development:
State Planning Policy;
South East Queensland Regional Plan;
Planning Regulation 2017;
The Noosa Plan.
The following codes from the Noosa Plan are applicable to this development:
Engineering Works Codes
Landscaping Code
Statutory Process
The applicant has requested to make a minor change to a development approval under s78 of the Planning Act 2016. An application for a minor change to a development approval can only be made in circumstances where a change would constitute a ‘minor change’.
The proposed change to the development approval requested by the applicant is determined to constitute a minor change on the grounds that:
the development would not result in substantially different development as <;
the change does not include prohibited development;
the change would not require the application to be referred to an additional referral agency or cause a referral agency to have regard to new mattes prescribed by regulation;
where the original application was code assessable, the change would not cause the application to become impact assessable.
Section 3 – Relevant Period
The relevant period for this development approval is 2 years starting the day that this development approval takes effect.
Applicant’s Request
The applicant requests that the Relevant period be extended to the same date as the higher order.
Assessment of Request
The higher order has been extended until 16 December 2020 and it is considered reasonable to extend the operational works to the same date for clarity. It is recommended that Section 3 be reworded to read as follows:
The relevant period for this development approval is until 16 December 2020.

Condition 1
The stormwater disposal from the site shall be provided in accordance with: Drawings Nos 17044-2(A) and 17044-3(A) by Ian Bradford Plumbing Consultants and must include but not limited to the following:
Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant.
Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant.
Applicant’s Request
The applicant requests that the condition be changed to reflect the most recent design and updated plans/reports.
Assessment of Request
The request is considered acceptable as the updated reports and plans address Council’s concerns. It is recommended that Condition 1 read as follows:
The stormwater disposal from the site shall be provided generally in accordance with:  Drawing No. 18505-C001 Revision B prepared by TOD Consulting Engineers, The Stormwater Management Report prepared by TOD Consulting Engineers dated 26 February 2018 and The Stormwater Quantity Assessment prepared by Aquaintel dated 3 August 2017 and must include but not limited to the following:
Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant.
Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant.

Condition 6 – Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
14725-C001	C	General Arrangement and Details,  prepared by TOD Consulting	09/08/2017
-	-	Landscape Design-Garage Level	undated
-	-	Landscape Design-Lobby Level	undated
-	-	Plant Schedule, 61 Elanda St	undated

Applicant’s Request
The applicant request that the approved plans table be updated to reflect the design and updated plans.
updated proposal.
Assessment of Request
The request is considered acceptable as the updated reports and plans address Council’s concerns. It is recommended that Condition 6 read as follows:
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
18505-C001	B	General Arrangement and Details prepared by TOD Consulting Engineers as annotated by Council	26 February 2018
DA2	C	Landscape Plan prepared by Larc Collective as annotated by Council	5 June 2018
DA3	C	Landscape Plan prepared by Larc Collective	5 June 2018
DA4	C	Mood Board prepared by Larc Collective	5 June 2018
DA5	C	Planting Plan prepared by Larc Collective as annotated by Council	5 June 2018
DA6	C	Planting Plan prepared by Larc Collective	5 June 2018
DA7	C	SPEC Notes prepared by Larc Collective	5 June 2018
DA8	C	Details prepared by Larc Collective	5 June 2018

Condition 7
Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart.  The contact number to arrange a pre-start meeting is 5329 6291. The prestart meeting must include the parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties.
Applicant’s Request
The applicant has not specifically requested to change the condition.
Assessment of Request
It is recommended that the condition be amended to reflect the current Council contact details. It is recommended that Condition 7 read as follows:
Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart.  The contact number to arrange a pre-start meeting is 5329 6245. The prestart meeting must include the parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties.

Condition 15
All works must be constructed and work procedure undertaken in accordance with:
The approved plans and conditions detailed in this Decision Notice.
The relevant conditions of the higher order Material Change of Use approval file 132003.221172.7 (23657 DA) to which this approval relates.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.

Applicant’s Request
The applicant has requested to change the condition to reflect the current higher order approval.
Assessment of Request
It is noted that since the application to change the subject application that the higher order has been changed a number of times with the most recent approval being file number 132003.221172.A. It is recommended that Condition 15 read as follows:
All works must be constructed and work procedure undertaken in accordance with:
The approved plans and conditions detailed in this Decision Notice.
The relevant conditions of the higher order Material Change of Use approval file 132003.221172.A (23657 DA) to which this approval relates.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.
cONSULTATION
Referral Agencies
Not applicable
Other Referrals
The application was forwarded to the following internal Council specialists:
Planning
conclusion & reasons for decision
The changes requested are needed to reflect the changes to the associated higher order approval or are required to update the conditions to current Council requirements. The changes do not create any concerns and achieve the outcomes of the original approval.
RECOMMENDATION
With regard to Application No. OPW17/0225.02, to make a minor change to an existing approval for Operational Works (roadworks, Stormwater Drainage, Earthworks and Landscaping situated at 61 Elanda St Sunshine Beach Qld 4567 described as Lot 408 RP 48112, is provided in accordance with Section 63(5) of the Planning Act 2016, Council on  decided to:
A.	Approve the changes.
B.	Amend Section 3 to read as follows:
The relevant period for this development approval is until 16 December 2020.
C.	Amend conditions 1, 6, 7 and 15 to read as follows:
1.	The stormwater disposal from the site shall be provided generally in accordance with:  Drawing No. 18505-C001 Revision B prepared by TOD Consulting Engineers, The Stormwater Management Report prepared by TOD Consulting Engineers dated 26 February 2018 and The Stormwater Quantity Assessment prepared by Aquaintel dated 3 August 2017 and must include but not limited to the following:
Infiltration trench/s (units) installed to the manufacturer’s specifications and in manner and at location that will not be damaged or constrained by the development and construction works. The infiltration units must be provided with inspection opening/s and slotted pipe/s for flushing-out to details be provided by the certifying engineer and/or the plumbing consultant.
Roofs’ charged stormwater pipeline should be provided with appropriate mechanism for flushing out and slow leak back flow pipe to details be provided by the certifying engineer and/or the plumbing consultant.

6.	Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
18505-C001	B	General Arrangement and Details prepared by TOD Consulting Engineers as annotated by Council	26 February 2018
DA2	C	Landscape Plan prepared by Larc Collective as annotated by Council	5 June 2018
DA3	C	Landscape Plan prepared by Larc Collective	5 June 2018
DA4	C	Mood Board prepared by Larc Collective	5 June 2018
DA5	C	Planting Plan prepared by Larc Collective as annotated by Council	5 June 2018
DA6	C	Planting Plan prepared by Larc Collective	5 June 2018
DA7	C	SPEC Notes prepared by Larc Collective	5 June 2018
DA8	C	Details prepared by Larc Collective	5 June 2018
7.	Council must be contacted at least 5 working days prior to any works commencing to organise a Prestart.  The contact number to arrange a pre-start meeting is 5329 6245. The prestart meeting must include the parties for the following aspects of the works:
Civil engineering works;
Landscape works;
Erosion and sediment control works;
Other relevant parties.
15.	All works must be constructed and work procedure undertaken in accordance with:
The approved plans and conditions detailed in this Decision Notice.
The relevant conditions of the higher order Material Change of Use approval file 132003.221172.A (23657 DA) to which this approval relates.
All relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site.

[word/footer1.xml]
Page 5 of 7

[word/header1.xml]
3

Used in these records

About this file

File size
33 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report OPW17 0225.02.docx · 33 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.