Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Appendix D - Civil Engineering Report

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 50, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A

             PERFORMANCE OUTCOMES                                               ACCEPTABLE OUTCOMES                                                     RESPONSE

Local amenity
PO4                                                               AO4.1                                                         RO4.1
Earthworks do not cause disturbance to the amenity of the         The following control measures are implemented—               Complies – The following control measures will be
neighbouring land.                                                                                                              implemented during construction:
                                                                  a) regular water spraying of exposed areas to suppress
                                                                  dust;                                                         a) regular water spraying of exposed areas to suppress
                                                                                                                                dust;
                                                                  b) provision of dust stabilised or sealed internal roads;
                                                                                                                                b) provision of dust stabilised or sealed internal roads; and
                                                                  c) protective covering of exposed areas that are left for
                                                                  more than 2 weeks; and                                        c) protective covering of exposed areas that are left for
                                                                                                                                more than 2 weeks.
                                                                  d) if there is no valid development permit for the site,
                                                                  disturbed areas are revegetated using species identified in
                                                                  PSP3 - Landscaping Plants and Guidelines;

                                                                  AND

                                                                  AO4.2                                                         RO4.2
                                                                  Earthworks are undertaken only during the hours of 7am        Complies – Earthworks will only be undertaken during the
                                                                  to 6pm, Monday to Friday and 7am to 6pm on Saturday.          hours of 7am to 6pm, Monday to Friday and 7am to 6pm on
                                                                  No work is undertaken on Sunday or public holidays.           Saturday. No work will be undertaken on Sunday or public
                                                                                                                                holidays.




l:\7000-7999\7700-7799\7700\codes\01-08-18 earthworks code.docx
                                                                                             Page 2
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 31.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.