Appendix D - Civil Engineering Report

of 71

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (31.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 52, section 1. The text section number identifies this passage in the reader.

EARTHWORKS CODE
Performance Criteria and Acceptable Solution
Hofmann Drive Medical Centre
1 August 2018
Issue A

               PERFORMANCE OUTCOMES                                              ACCEPTABLE OUTCOMES                                                         RESPONSE

Haulage activity and amenity
PO7                                                               AO7                                                               RO7
Haulage of material to and from a site ensures—                   No solution provided
                                                                                                                                    Complies – All proposed haulage routes will be provided as
a) minimal disturbance to neighbouring properties and
                                                                                                                                    part of the Construction Management Plan which will be
properties along the haulage route; and
                                                                                                                                    submitted and approved by Council prior to commencement
b) Council’s road infrastructure including pavements is not
                                                                                                                                    of works.
adversely affected.


Extent of earthworks
PO8                                                               AO8                                                               RO8
Earthworks are contained within the subject property.             All earthworks, including cut and fill batters, retaining walls   Complies – All earthworks and retaining structures will be
                                                                  etc are contained within the subject site.                        fully contained within the subject site.


Sloping sites
PO9                                                               AO9                                                               RO9
On sloping sites, excavation or filling are designed to           Cut or fill is less than 2m in depth relative to the natural      Complies – The site is not a sloping site, however will
maximise the use of natural slope and minimise the need           ground surface.                                                   include excavation of more than 2m for the proposed
for cut and fill.                                                                                                                   basement. The basement will not present to any adjoining
                                                                                                                                    properties.
Environmental protection
PO10                                                              AO10                                                              RO10
Earthworks minimise any adverse impact upon                       No solution provided.                                             Complies – The earthworks will be undertaken in
groundwater, watercourses, drainage lines, wetlands, and                                                                            accordance with Noosa Council Guidelines, Australian
native vegetation.                                                                                                                  Standards and a geotechnical investigation which will be
                                                                                                                                    prepared during detailed design.




l:\7000-7999\7700-7799\7700\codes\01-08-18 earthworks code.docx
                                                                                             Page 4
Log in to download the original file

Appendix D - Civil Engineering Report.pdf · 31.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.