INTEGRATED PLANNING ACT 1997

Development within the limits of a
port oo,
For more information refer to Guide 18. For
information about prescribed tidal work refer to
, Guide 4.
" you answered "YES" to Q12, the application
' ; Wagers referral to the P ‘ort Auth rarity.
The Port Authority is a concurrence agency if the
| development is -
+ within 200m of a shipping channel or an entry
; ° and exit shipping corridor for the port
‘within 1000m of a swing basin, a commercial
* shipping wharf, a mooring, anchorage or spoil
grounds;
within 1000m of a planned port facility

identified in a land use plan approved under |

the Transport Infrastructure Act 1994.
«In all other situation the Port Author isan
. advice agency,

Marinas

4 For more information refer to Guide 1 18, For

1 Information about whether a marina is prescribed
; tidal work refer to Guide 24, The focal

t goverment is the assessment manager for all

{ prescribed tidal work. ©

, Ifyou answered "YES" to Q13, the application

1 triggers referrat to Queensland Fire and Rescue

: Service as an advice agency. -

 

IDAS Assessment Checklist, Version 20, 2 April 2007

12. Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

KINO

(11 YES - complete Part M of Form 1, or Part P of Form 1 if the workis prescribed tidal work

~113. Does the application involve operational work that is tidal work for a marina’? with more than 6

vessel berths?

x] NO

(CI YES - complete Part M of Form 1, or Part P of Form | if the tidal work is prescribed tidal work

 

 

» Tidal works in.strategic port land tidal
areas

" For more information refer to Guide 18.

; Unies you answered “NO" to Q14, the relevant
, Port Authority is the assessment manager for the
application and the Environmental Protection

: Agency (EPA) and Queensland Transport (QT)

{ are concurrence agencies for the application,

{ Heritage

| For further information refer to Guide 19 19.

=

No

4. Does the application involve tidal works within a strategic port land tidal area2°?

(1 YES - complete Part M of Form 1

 

15. Does the application involve development in a heritage registered place as defined under the

Queensland Heritage Act 1992?

 

 

 

If you answered “YES” to Q15, the application . & NO .
triggers referral to the Queensland Heritage i
t Counc as concurrence agency for the (DYES - complete Part C of Form 1
| application.
1
i . . 15(b)The application involves: (tick applicable boxes)
4 Unless you answered “none of the above" to . . . .
* Q15(b), the application involves referral to the Ci (i) amaterial change of use assessable against the planning scheme and the lot shares a
Environmentat Protéction Agency as an advice common boundary with a protected area or registered place under the Queensland
_ agency for the application Heritage Act 1992;
’ O (i) _ reconfiguring a lot if the lot shares a common boundary with a protected area or
Tegistered place under the Queensland Heritage Act 1992;
(iii) none of the above.
, Detlared catchment areas. 16. The application i is in an area declared to be a catchment area under the Water Act 2000 and

For more information, inctuding a list of the
: declared catchment areas within Queensland,
; refer to Guide 13. °°
* Unless you answered “none of the above” to
+ Q16, the application requires assessment by the
" Department of Natural Resources and Water
j (NRW).
« tfan agency other than NRW is the assessment
‘ manager for the-application, NRW is a
‘ concurrence agency for the application in
relation to this matter.

 

involves: (tick the applicable box/es)

Ov
Ditii)

& iii

reconfiguring a fot if any lot resulting from the reconfiguration is tess than 16 hectares:

development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;

none of the above

 

 

 

18 High water mark is defined In the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina Is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
1.4 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1703 - Multiple Housing Type 4 [As Published].pdf · 1.4 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.